Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 12127
  |   Categories: Public Works Press Releases

Lee’s Summit Seeks Input on NW Main Street Improvements

The City of Lee’s Summit will hold a virtual public meeting from 5:30 p.m. to 7 p.m. on Dec. 9, where residents will have the opportunity to comment on planned improvements to Northwest Main Street from Northwest Chipman Road to Northwest Commerce Drive. The project’s goal is to improve safety in the area and enhance economic activity.

The project is currently in the planning phase. It will consist of widening and reconstructing Northwest Main Street as a two-lane roadway with improved pavement, enclosed storm drainage, continuous curb and gutter and sidewalks. The existing sidewalk on the south side of Northwest Commerce Drive will also be extended to Northwest Main Street.

During the virtual public meeting, a short presentation will take place at 5:30 p.m., 6 p.m., and 6:30 p.m. to explain the project. Following the presentations, City employees and members of the engineering consulting firm Walter P Moore will be available to answer questions.

To access the Dec. 9 public meeting, please use the following link: https://global.gotomeeting.com/join/265514173. Residents may also call into the meeting using the number 1-571-317-3112 and the access code 265-514-173.

For questions about the project, contact Senior Staff Engineer Jackie White at 969-1800 or email PublicWorks@cityofLS.net.

Print

Latest News

Northbound Traffic Only on NW Main Street from NW Chipman Road to NW Commerce Drive Beginning March 28

Northbound Traffic Only on NW Main Street from NW Chipman Road to NW Commerce Drive Beginning March 28

Northbound Traffic Only on NW Main Street from NW Chipman Road to NW Commerce Drive Beginning March 28
A section of NW Main Street from NW Chipman Road to NW Commerce Drive is set to close to southbound traffic beginning Monday, March 28, weather permitting, and will be open for northbound traffic only until August 2022. This change in traffic is to facilitate the reconstruction of NW Main Street with a new concrete curb and gutter road and sidewalks. Access to the businesses along NW Main Street will be maintained at all times. The contractor...
Parking Lot Closure for Arnold Hall Stormwater Project Set for Monday, March 21

Parking Lot Closure for Arnold Hall Stormwater Project Set for Monday, March 21

Parking Lot Closure for Arnold Hall Stormwater Project Set for Monday, March 21
The public parking lot at 121 SE 3rd St. in downtown Lee’s Summit, commonly referred to as the Arnold Hall parking lot, is set to close on Monday, March 21, weather permitting, and is expected to remain closed until June. The closure is necessary for the second phase of stormwater work at the site which includes the excavation and installation of stormwater tanks. The alley off of SE Green Street will be used during construction and will be closed most of...
MoDOT US 50 Bridges over Chipman Road Project

MoDOT US 50 Bridges over Chipman Road Project

The Missouri Department of Transportation (MoDOT) plans to replace the U.S. 50 bridges over Chipman Road in Lee's Summit beginning March 21. These bridges have reached the end of their service life and must be replaced. In addition to the new bridges, sidewalks will be provided on both sides of Chipman Road through the interchange providing new critical connections for pedestrians. All work is weather permitting. 

City Crews Spot Treating as Needed Today

City Crews Spot Treating as Needed Today

The City’s crews plowed and treated primary and secondary streets overnight after just over one inch of snow fell. Residential streets were treated yesterday. Per the City’s snow plan, residential streets are treated with salt and not plowed when total snow accumulations on pavements are less than two inches. Crews will be treating slick spots as needed throughout today, and plan to conclude snow operations at 3:30 p.m. Conditions should be favorable for...
City Crews Treating Residential Streets this Afternoon

City Crews Treating Residential Streets this Afternoon

The City’s crews are treating residential streets with salt this afternoon. Higher pavement temperatures have helped to melt most of the snow that has fallen on streets so far. Another band of moderate snow is expected this evening around 6 p.m. Temperatures are expected to drop and accumulating snow of a dusting to one inch is likely. A crew will report tonight for the overnight shift, and snow operations are likely to conclude Friday morning. The City will...
First171921Last