Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 1817
  |   Categories: Public Works News

Parking Lot Closure for Arnold Hall Stormwater Project Set for Monday, March 21

Parking Lot Closure for Arnold Hall Stormwater Project Set for Monday, March 21

The public parking lot at 121 SE 3rd St. in downtown Lee’s Summit, commonly referred to as the Arnold Hall parking lot, is set to close on Monday, March 21, weather permitting, and is expected to remain closed until June. The closure is necessary for the second phase of stormwater work at the site which includes the excavation and installation of stormwater tanks. The alley off of SE Green St. will be used during construction and will be closed most of the time. The alley off of 3rd Street will have intermittent closures; access will be maintained to the Vogue parking garage.

Visitors to the area are encouraged to use free public parking available in the parking garage at 2nd and Green streets.

Print

Latest News

City Crews Prepared for Potential Winter Weather This Weekend

City Crews Prepared for Potential Winter Weather This Weekend

The City’s crews are prepared for potential winter weather beginning in the evening on Sat., Jan. 28, and continuing overnight into Sun., Jan. 29. The chances are very low at this time but the City’s crews have prepared trucks and equipment and will be called out if necessary. The City will continue to monitor the weather forecast and update its response as needed.

 

City Crews Completed Treating Streets Today, Jan. 25

City Crews Completed Treating Streets Today, Jan. 25

The City’s crews treated streets with salt overnight, and completed treating all streets by 3:30 p.m. today, Wed., Jan. 25. Pavement temperatures warmed throughout the day which helped the melting process. As pavement temperatures drop below freezing overnight into Thurs., Jan. 26, some streets may have slick spots due to re-freezing. Drivers should continue to use caution, especially on elevated surfaces such as bridges and overpasses.

 

City Crews Preparing for Snow Tonight, Tues., Jan. 24, and Overnight Into Wed., Jan. 25

City Crews Preparing for Snow Tonight, Tues., Jan. 24, and Overnight Into Wed., Jan. 25

The City’s crews are preparing for more winter weather as a wintery mix is expected to move in tonight, Tues., Jan. 24, and then change to snow overnight into Wed., Jan. 25. Crews are scheduled to report at 7 p.m. tonight to begin treating streets with salt and plowing as needed, and are currently scheduled to work through Fri., Jan. 27, if plowing is necessary. Drivers should use caution during the Wednesday morning commute, especially on elevated surfaces...
City Crews Treating Streets This Morning, Sunday, Jan. 22

City Crews Treating Streets This Morning, Sunday, Jan. 22

The City’s crews worked overnight into Sun., Jan. 22, to treat streets with salt, and expect to be complete by 11 a.m. Drivers should continue to use caution, especially on elevated surfaces such as bridges and overpasses, until pavement temperatures rise above freezing later this morning.

City Crews Preparing for Snow This Weekend

City Crews Preparing for Snow This Weekend

The City’s crews are preparing for snow on Sat., Jan. 21, and overnight into Sun., Jan. 22. Crews are scheduled to report at 7 p.m. on Saturday to treat streets as needed and will continue to work overnight into Sunday. Snow accumulations for the Lee’s Summit area may be around one half inch, and the main concerns will be snow overwhelming pavements Saturday night and a re-freeze Sunday morning when temperatures drop below freezing. READ MORE -->

1345Last