Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 2267

Volunteers Needed to Sweep the Summit on October 14

Volunteers Needed to Sweep the Summit on October 14

Residents, businesses, community groups and students are encouraged to join the City of Lee’s Summit on Oct. 14 for Sweep the Summit, a citywide event to address ongoing litter issues, encourage recycling and keep the City clean. Two environmental cleanups, Street Clean and Stream Team, will be held from 10 a.m. to noon.

Street Clean volunteers will tackle trash and illegal dumping along certain city-owned streets. Participants are asked to meet at the City’s Maintenance Facility, 1971 SE Hamblen Road, to receive street assignments, trash bags and safety vests.

The Stream Team will address stream-side habitats within the City’s parks. During this event, cleanup efforts will concentrate on East Fork Little Blue Creek in Langsford Park. Those wishing to take part should gather at the parking lot on the southwest corner of Langsford and Todd George roads. Trash bags and gloves will be provided. Student and scout community service hours are available.

Both cleanup events are supported by the City’s Public Works Department and require a signed release of liability waiver that can be completed in advance online at CityofLS.net/sweep.

The City will host RecycleFEST from 9 a.m. to noon at the City’s Maintenance Facility, 1971 SE Hamblen Road. RecycleFEST is an opportunity for Lee’s Summit residents to dispose of a variety of items that can be recycled and refurbished, reducing harm to the environment and saving landfill space for free. Items include adult bicycles, cell phones, rechargeable batteries, eyeglasses and crayons. Residents can bring up to four paper grocery bags of documents per household to be shredded and recycled. For a full list of items accepted visit CityofLS.net/RecycleFest.

For more information, contact Public Works at publicworks@cityofls.net or 816-969-1800 or visit CityofLS.net/sweep.

Print

Latest News

Section of SW Murray Road Set to Close Nov. 14

Section of SW Murray Road Set to Close Nov. 14

Section of SW Murray Road Set to Close Nov. 14
A section of SW Murray Road near SW 1st Street is set to close on Monday, Nov. 14, and will remain closed until the evening of Friday, Nov. 18, weather permitting. The road closure is necessary to perform water main replacement work as part of the FY22 Water Main Rehabilitation project. The detour route is SW 3rd Street and Oldham Parkway.  The FY22 Water Main Rehabilitation project helps with continued efforts to maintain and strengthen the water...
Curb Replacement on Section of NW Chipman Road

Curb Replacement on Section of NW Chipman Road

Preparations began this week for curb replacement on a section of NW Chipman Road from U.S. Route 50 to the railroad bridge just east of NW Donovan Road. Curb removal is expected to start on Mon., Nov. 7, with pours and restoration to follow as well as sidewalk ramp replacement in several locations. The work is expected to take approximately three weeks, weather permitting. While there will be lane closures during this work, both eastbound and westbound NW Chipman...
Community Notification: Flood Hazard Revisions Along Cedar Creek

Community Notification: Flood Hazard Revisions Along Cedar Creek

The City of Lee’s Summit, Missouri, Public Works Department in accordance with National Flood Insurance Program regulation 65.7(b)(1), hereby gives notice of the City of Lee’s Summit’s intent to revise the flood hazard information, generally located upstream and downstream of SW Ward Road along Cedar Creek. The flood hazard revisions are being proposed as part of Letter of Map Revision (LOMR, Case No. 22-07-0797P) for a completed construction...
Surface Seal Work Set to Begin on SE 2nd Street

Surface Seal Work Set to Begin on SE 2nd Street

Update: The contractor working on SE 2nd Street had an equipment failure earlier today, Tuesday, Nov. 1, and stopped work; however, work is tentatively expected to take place again from 9 a.m. – 4 p.m. tomorrow, Wed., Nov. 2. In order to complete surface sealing along SE 2nd Street at intersections, there will be short-term closures of Jefferson, Market, SE Main, Douglas and Green crossing SE 2nd Street. Eastbound and westbound traffic will be maintained...
Section of SW Jefferson Street Also Closed for SW 3rd Street Utility Work

Section of SW Jefferson Street Also Closed for SW 3rd Street Utility Work

Section of SW Jefferson Street Also Closed for SW 3rd Street Utility Work
Update: Phase two of the SW 3rd Street utility work is now expected to start on Mon., Oct. 17, with the closure of both eastbound and westbound through traffic on SW 3rd Street from SW Blue Parkway to SW Jefferson Street. The section of SW Jefferson Street from SW 3rd Street to SW 2nd Street is expected to be back open by noon on Mon., Oct. 17. During phase one of the utility work on SW 3rd Street which started today, a section of SW Jefferson Street from SW...
First151719Last