The Water Master Plan provides an evaluation of the existing water infrastructure for Lee's Summit and makes recommendations for water supply and distribution system improvements required to meet existing service needs and future service needs for the next ten years. The current Water Master Plan was submitted on October 24, 2006.
Water Master Plan (PDF 14.86 MB)
Cover Page Table of Contents Executive Summary Introduction Existing System Study Area Planning Criteria - Population Projections - Water Usage - Water Supply Hydraulic Model - Model Calibration - Distribution of Existing Demands - Distribution of Proposed Demands - Criteria Conclusions Recommendations
List of Tables Table 1 - Opinion of Probable Costs Next 10 years Table 2 - Existing Supply Facilities Table 3 - Existing Storage Facilities Table 4 - Existing Pumping Facilities Table 5 - Population and Water Demands (MGD) Table 6 - Fire Flow Criteria Table 7 - Capacity of the Jackson-Cass Transmission System Table 8 - Projected Water Supply Capacity Table 9 - Proposed Projects Table 10 - Recommended Typical Schedule for Water System Projects (Months) List of Figures Figure 1 - Existing System Schematic Figure 2 - Study Area Figure 3 - Water District 14 Land Use Figure 4 - Historical and Projected Maximum Day Demands Figure 5 - Jackson-Cass Transmission System Figure 6 - Projected Demand and Supply (MGD) Figure 7 - Proposed Improvements 2016 Figure 8 - Proposed Improvements Ultimate Buildout Appendices Appendix A - Abbreviations Appendix B - Model Calibration Appendix C - Recommended Improvements Map Ultimate System Appendix D - Compact Disc