Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 5600
  |   Categories: Public Works News

Community Notification: Flood Hazard Revisions Along Cedar Creek

The City of Lee’s Summit, Missouri, Public Works Department in accordance with National Flood Insurance Program regulation 65.7(b)(1), hereby gives notice of the City of Lee’s Summit’s intent to revise the flood hazard information, generally located upstream and downstream of SW Ward Road along Cedar Creek. The flood hazard revisions are being proposed as part of Letter of Map Revision (LOMR, Case No. 22-07-0797P) for a completed construction project along Cedar Creek. The City of Lee’s Summit has constructed improvements that replaced the culverts at the stream’s crossing with SW Ward Road.

Specifically, the floodway shall be revised from a point approximately 1,000 feet downstream of SW Ward Road to a point approximately 1,500 feet upstream of SW Ward Road along Cedar Creek. As a result, the floodway widths shall narrow or remain unchanged within the area of revision. In addition, the Base Flood Elevations (1% annual chance water-surface elevations) will increase and decrease. Base Flood Elevations will increase a maximum of 0.3 feet at a point approximately 1,000 feet downstream of Ward Road.  The Special Flood Hazard Area (1% annual chance floodplain) will widen and narrow along Cedar Creek within the area of revision.

Maps and a detailed analysis of the proposed flood hazard revisions can be reviewed at Lee’s Summit City Hall, Public Works Department at 220 SE Green Street, Lee’s Summit, MO 64063. If you have any questions or concerns about the proposed project or its effect on your property, you may contact Karen Quackenbush of the City of Lee’s Summit at 816-969-1800 or PublicWorks@cityofls.net from 11/14/2022 to 12/14/2022.

Print

Latest News

Section of Southeast Flagstone Drive Set to Close Daily Beginning Monday, Jan. 12

Section of Southeast Flagstone Drive Set to Close Daily Beginning Monday, Jan. 12

Section of Southeast Flagstone Drive Set to Close Daily Beginning Monday, Jan. 12

A section of Southeast Flagstone Drive between Southeast Todd George Parkway and Southeast Annette Street is set to close daily from 7 a.m. to 5 p.m. beginning Monday, Jan. 12, through Monday, Feb. 9 (extended from Jan. 19). The detour route includes Southeast Greystone Drive, Southeast Third Street, Southeast Flagstone Drive, Southeast Lana Street and Southeast Fifth Street.

Section of Northeast Rice Road Set to Close Monday, Jan. 12

Section of Northeast Rice Road Set to Close Monday, Jan. 12

Section of Northeast Rice Road Set to Close Monday, Jan. 12

A section of Northeast Rice Road between Northeast Colbern Road and Northeast Mulberry Avenue is set to close Monday, January 12, through Thursday, January 15. The detour route includes Northeast Mulberry Avenue, Northeast Independence Avenue, and Northeast Colbern Road. The closure is necessary to complete water line connections.

Southeast Eastridge and Southeast Wilson Streets Closed

Southeast Eastridge and Southeast Wilson Streets Closed

Southeast Eastridge and Southeast Wilson Streets Closed

Update 1/14/26: Southeast Eastridge and Southeast Wilson streets are now open.
Southeast Eastridge and Southeast Wilson streets are closed through the end of next week. Grand Avenue is back open.

Intersection of Southeast Third Street and Southeast Greystone Drive Set to Close Daily Beginning Dec. 10

Intersection of Southeast Third Street and Southeast Greystone Drive Set to Close Daily Beginning Dec. 10

Intersection of Southeast Third Street and Southeast Greystone Drive Set to Close Daily Beginning Dec. 10

The intersection of Southeast Third Street and Southeast Greystone Drive is set to close daily from 7 a.m. to 6 p.m. beginning Wednesday, December 10, and lasting until December 24. The detour route includes Southeast Todd George Parkway, Northeast Langsford Road, Southeast Keystone Drive, and Southeast Flagstone Drive. READ MORE -->

City Crews Completed Snow Operations

City Crews Completed Snow Operations

The City’s crews completed snow operations overnight. Temperatures above freezing will continue to help with additional melting throughout the day.

First357Last