Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 3824
  |   Categories: Public Works News

Community Notification: Flood Hazard Revisions Along Cedar Creek

The City of Lee’s Summit, Missouri, Public Works Department in accordance with National Flood Insurance Program regulation 65.7(b)(1), hereby gives notice of the City of Lee’s Summit’s intent to revise the flood hazard information, generally located upstream and downstream of SW Ward Road along Cedar Creek. The flood hazard revisions are being proposed as part of Letter of Map Revision (LOMR, Case No. 22-07-0797P) for a completed construction project along Cedar Creek. The City of Lee’s Summit has constructed improvements that replaced the culverts at the stream’s crossing with SW Ward Road.

Specifically, the floodway shall be revised from a point approximately 1,000 feet downstream of SW Ward Road to a point approximately 1,500 feet upstream of SW Ward Road along Cedar Creek. As a result, the floodway widths shall narrow or remain unchanged within the area of revision. In addition, the Base Flood Elevations (1% annual chance water-surface elevations) will increase and decrease. Base Flood Elevations will increase a maximum of 0.3 feet at a point approximately 1,000 feet downstream of Ward Road.  The Special Flood Hazard Area (1% annual chance floodplain) will widen and narrow along Cedar Creek within the area of revision.

Maps and a detailed analysis of the proposed flood hazard revisions can be reviewed at Lee’s Summit City Hall, Public Works Department at 220 SE Green Street, Lee’s Summit, MO 64063. If you have any questions or concerns about the proposed project or its effect on your property, you may contact Karen Quackenbush of the City of Lee’s Summit at 816-969-1800 or PublicWorks@cityofls.net from 11/14/2022 to 12/14/2022.

Print

Latest News

Sections of Southeast Douglas and Southeast Ninth Streets Closed

Sections of Southeast Douglas and Southeast Ninth Streets Closed

Sections of Southeast Douglas and Southeast Ninth Streets Closed

A section of Southeast Douglas Street between Southeast Ninth Street and Southeast Blue Parkway closed on Monday, October 6, and will remain closed until Oct. 31 (extended from Oct. 17). A section of Southeast Ninth Street is also closed, and there is no access to Southeast Ninth Street from Southeast Douglas Street. READ MORE -->

 

Burgandy Lane and Northeast Whitestone Drive Closed at Northeast Colbern Road

Burgandy Lane and Northeast Whitestone Drive Closed at Northeast Colbern Road

Burgandy Lane and Northeast Whitestone Drive Closed at Northeast Colbern Road

Burgandy Lane and Northeast Whitestone Drive are closed at Northeast Colbern Road, for gas main work along Northeast Colbern Road. Work is permitted through October 10. The detour routes include Northeast Todd George Parkway, Northeast Bronze Drive, Northeast Jade Street, and Northeast Burgandy Lane.

 

Arnold Hall Parking Lot Closure Set for Wed., Sept. 24

Arnold Hall Parking Lot Closure Set for Wed., Sept. 24

Arnold Hall Parking Lot Closure Set for Wed., Sept. 24
The north end of the parking lot at 121 SE Third Street, commonly referred to as the Arnold Hall parking lot, is set to close at 6 a.m. on Wednesday, September 24. It will be closed for approximately three days and is expected to reopen by the end of the business day Friday, September 26. The closure is necessary so a contractor can address settlement of pavers in the parking lot. Barricades will be placed in the locations marked with red lines on the...
Southwest Scherer Lane Set to Close Monday, Sept. 22

Southwest Scherer Lane Set to Close Monday, Sept. 22

Southwest Scherer Lane Set to Close Monday, Sept. 22

Southwest Scherer Lane between Southwest Scherer Road/East 129th Street and Southwest Scherer Parkway/Highgrove Road is set to close on Monday, September 22, for approximately one week for water main installation. The detour route includes Southwest Scherer Parkway/Highgrove Road, Southeast Raytown Road, and Southwest Scherer Road/East 129th Street.

Section of Southbound Northeast Douglas Street Closed Daily

Section of Southbound Northeast Douglas Street Closed Daily

Section of Southbound Northeast Douglas Street Closed Daily

A section of southbound Northeast Douglas Street between Northeast Ash and Northeast Elm streets is closed daily 9 a.m. to 4 p.m. for gas main installation by a contractor. The work will then move north one block and southbound Northeast Douglas Street will be closed daily between Northeast Forest Avenue and Northeast Ash Street. Work is permitted through Oct. 6.

 

135Last