Community Notification: Flood Hazard Revisions Along Cedar Creek

The City of Lee’s Summit, Missouri, Public Works Department in accordance with National Flood Insurance Program regulation 65.7(b)(1), hereby gives notice of the City of Lee’s Summit’s intent to revise the flood hazard information, generally located upstream and downstream of SW Ward Road along Cedar Creek. The flood hazard revisions are being proposed as part of Letter of Map Revision (LOMR, Case No. 22-07-0797P) for a completed construction project along Cedar Creek. The City of Lee’s Summit has constructed improvements that replaced the culverts at the stream’s crossing with SW Ward Road.

Specifically, the floodway shall be revised from a point approximately 1,000 feet downstream of SW Ward Road to a point approximately 1,500 feet upstream of SW Ward Road along Cedar Creek. As a result, the floodway widths shall narrow or remain unchanged within the area of revision. In addition, the Base Flood Elevations (1% annual chance water-surface elevations) will increase and decrease. Base Flood Elevations will increase a maximum of 0.3 feet at a point approximately 1,000 feet downstream of Ward Road.  The Special Flood Hazard Area (1% annual chance floodplain) will widen and narrow along Cedar Creek within the area of revision.

Maps and a detailed analysis of the proposed flood hazard revisions can be reviewed at Lee’s Summit City Hall, Public Works Department at 220 SE Green Street, Lee’s Summit, MO 64063. If you have any questions or concerns about the proposed project or its effect on your property, you may contact Karen Quackenbush of the City of Lee’s Summit at 816-969-1800 or PublicWorks@cityofls.net from 11/14/2022 to 12/14/2022.

Print

Latest News

Section of Northeast County Park Road Closed for Concrete Restoration

Section of Northeast County Park Road Closed for Concrete Restoration

Section of Northeast County Park Road Closed for Concrete Restoration

A utility contractor closed a section of Northeast County Park Road at Northeast Colbern Road for concrete restoration. Work started today, and is permitted through Aug. 15. A detour route is posted and includes Northeast Colbern Road, Northeast Bren Mar Road, and Northeast Lake Shore Drive. This section of Northeast County Park Road is owned by Jackson County.

Southwest Raintree Parkway Spillway Bridge Set to Close Monday, August 25

Southwest Raintree Parkway Spillway Bridge Set to Close Monday, August 25

Southwest Raintree Parkway Spillway Bridge Set to Close Monday, August 25
Update as of 12/5/25: The Southwest Raintree Parkway spillway bridge is now open. The sidewalk remains closed and some lane drops are possible through next week. The contractor expects all work to be completed by the end of next week. The Southwest Raintree Parkway spillway bridge is set to close on Monday, Aug. 25, and will remain closed for approximately four months. Southwest Raintree Parkway will be closed between Southwest Tiller Court and Southwest Green Teal....
Northwest Chipman Road is Open

Northwest Chipman Road is Open

Northwest Chipman Road is Open

Northwest Chipman Road between View High Drive and Northwest Bent Tree Drive opened earlier today, Friday, Aug. 1. The contractor will continue to work to complete restoration and punch list items.

Lee’s Summit to Celebrate the Chipman Road Improvements Project Completion

Lee’s Summit to Celebrate the Chipman Road Improvements Project Completion

Lee’s Summit to Celebrate the Chipman Road Improvements Project Completion
The City of Lee's Summit will celebrate the completion of the Chipman Road Improvements project with a ribbon-cutting ceremony on Aug. 1 at 10 a.m. The event will be held on the east side of the pedestrian bridge on Chipman Road. The Chipman Road Improvements project, which began construction in July 2023, enhances the corridor that serves as a key transportation route for residents and businesses. The completed upgrades include the connection of...
Repairs to Roundabout at Southwest Arborwalk Boulevard and Southwest Arboridge Drive Set to Begin Week of July 28

Repairs to Roundabout at Southwest Arborwalk Boulevard and Southwest Arboridge Drive Set to Begin Week of July 28

Repairs to Roundabout at Southwest Arborwalk Boulevard and Southwest Arboridge Drive Set to Begin Week of July 28

Repairs to the roundabout at Southwest Arborwalk Boulevard and Southwest Arboridge Drive are set to begin the week of July 28. A section of Southwest Arborwalk Boulevard between Southwest Arbormist Drive and Southwest Arboridge Drive will be closed, and sections of both Southwest Arborwalk Boulevard and Southwest Arboridge Drive will be closed to thru traffic. Signed detours will be in place.  READ MORE -->