Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 5958
  |   Categories: Public Works News

Community Notification: Flood Hazard Revisions Along Cedar Creek

The City of Lee’s Summit, Missouri, Public Works Department in accordance with National Flood Insurance Program regulation 65.7(b)(1), hereby gives notice of the City of Lee’s Summit’s intent to revise the flood hazard information, generally located upstream and downstream of SW Ward Road along Cedar Creek. The flood hazard revisions are being proposed as part of Letter of Map Revision (LOMR, Case No. 22-07-0797P) for a completed construction project along Cedar Creek. The City of Lee’s Summit has constructed improvements that replaced the culverts at the stream’s crossing with SW Ward Road.

Specifically, the floodway shall be revised from a point approximately 1,000 feet downstream of SW Ward Road to a point approximately 1,500 feet upstream of SW Ward Road along Cedar Creek. As a result, the floodway widths shall narrow or remain unchanged within the area of revision. In addition, the Base Flood Elevations (1% annual chance water-surface elevations) will increase and decrease. Base Flood Elevations will increase a maximum of 0.3 feet at a point approximately 1,000 feet downstream of Ward Road.  The Special Flood Hazard Area (1% annual chance floodplain) will widen and narrow along Cedar Creek within the area of revision.

Maps and a detailed analysis of the proposed flood hazard revisions can be reviewed at Lee’s Summit City Hall, Public Works Department at 220 SE Green Street, Lee’s Summit, MO 64063. If you have any questions or concerns about the proposed project or its effect on your property, you may contact Karen Quackenbush of the City of Lee’s Summit at 816-969-1800 or PublicWorks@cityofls.net from 11/14/2022 to 12/14/2022.

Print

Latest News

Various Lane Closures Expected on Northeast Douglas Street Through End of March

Various Lane Closures Expected on Northeast Douglas Street Through End of March

Northeast Douglas Street between Northeast Chipman Road and Southeast Second Street will have various lane closures through the end of March for tree work. Work may start as early as this week, and is expected to take place a block at a time. Some detours may be needed depending on conditions. The work is in preparation for the Northeast Douglas Street Improvements project, which is expected to begin this summer 2026. For more information, contact the Public Works...
Public Meeting for Southeast Douglas Street Improvements Set for March 26

Public Meeting for Southeast Douglas Street Improvements Set for March 26

The City of Lee’s Summit will host an in-person public meeting for the design of the Southeast Douglas Street from Blue Parkway to Fourth Street Improvements project from 4:30 – 6:30 p.m. on Thursday, March 26, 2026, in the Strother Conference Room at Lee’s Summit City Hall, 220 SE Green St., Lee’s Summit, Mo. The meeting will be an open house-style format and there will not be a formal presentation; the public can come and go as schedules...
Section of Southeast Browning Street Set to Close Wednesday, March 11

Section of Southeast Browning Street Set to Close Wednesday, March 11

Section of Southeast Browning Street Set to Close Wednesday, March 11
A section of Southeast Browning Street between Southeast Eighth Street and Southeast Blue Parkway is set to close on Wednesday, March 11, until Monday, March 16. The work is necessary for concrete work as part of the Route 291 north and U.S. 50 Interchange project. The detour route includes Southeast Douglas Street, Southeast Seventh Street, Southeast Green Street, and Southeast Eighth Street.  
Northwest Olive and Northwest Orchard Streets Set to Close to Through Traffic Beginning Monday, March 2

Northwest Olive and Northwest Orchard Streets Set to Close to Through Traffic Beginning Monday, March 2

Northwest Olive and Northwest Orchard Streets Set to Close to Through Traffic Beginning Monday, March 2

Northwest Olive and Northwest Orchards streets are set to close to through traffic beginning, Monday, March 2, until October 2026. Northwest Central Street and Northeast Main Street also will be closed to through traffic. These initial closures are to minimize traffic while crews begin tree clearing and utility work. Local access will be maintained.

1345Last