Search Press Releases

Press Release Archive

Press Releases

  |   Views: 2909
  |   Categories: Public Works News

REVISED MoDOT Update: Closures on MO 291 and U.S. 50 in Lee's Summit for bridge replacement operations Now - November 2026

The following information is shared from the Missouri Department of Transportation (MoDOT) and is related to the 291 North and US Route 50 Interchange project. https://www.modot.org/node/94913

Project: Missouri Route 291 North and U.S. Route 50 Interchange Improvements in Jackson

JACKSON COUNTY – The Missouri Department of Transportation will conduct various closures and traffic modifications on Missouri Route 291 and U.S. MO 50 for bridge replacement operations. All work is weather permitting. See below for traffic modifications (all times listed are approximate):

Additional dates and modifications added

Friday, Aug. 14 - Saturday Aug. 15 between 7:00am-3:00pm

  • Various lane closures on north and southbound MO 291 from SE Oldham to North of Bayberry.

Tuesday, Aug. 18 at 9:00am

  • Place traffic on the new Blue Parkway east and west of MO 291.

Tuesday, Aug. 18 at 12:00pm until Friday, Nov. 13 at 5:00pm

  • Close southbound MO 291 from Blue Parkway to the south side of U.S. 50. Motorists are encouraged to utilize Blue Parkway to Todd George.

Added: Wed., Aug. 19 7:00 p.m. until Thu., Aug. 20 6:00 a.m.

  • Close the right lane on WB U.S. 50 from west of Todd George to MO 291.

Added: Thu., Aug. 20 between 9:00 a.m. and 12:00 p.m.

  • Close the ramp from MO 291 to WB U.S. 50.

Added: Thu., Aug. 20 between 12:00 p.m. and 4:00 p.m.

  • Close the ramp from MO 291 to EB U.S. 50.

Added: Thu., Aug. 20 at 8:00 p.m. until Fri., Aug. 21 at 6:00 a.m.

  • Close the right lane on EB U.S. 50 from MO 291 south (Jefferson St) to MO 291 and close the EB off ramp to MO 291.

Added 8/25/26: (TODAY) Tuesday, August 25 at 9:00 a.m. - 3:00 p.m.

  • Close the right lane on NB 291 from SE Oldham to South of Blue Parkway.
  • Close the right lane on SB 291 from Bayberry to 50 Highway.

Added 8/25/26: The Missouri Department of Transportation will CLOSE the ramp from MO 291 to westbound U.S. 50 in Lee’s Summit for bridge project operations beginning tomorrow, Aug. 26 between 9 a.m. and 3 p.m. All work is weather permitting.

Fri., Sep. 11 at 10:00 a.m. until Fri., Nov. 13 at 5:00 p.m.

  • Close NB MO 291 from the south side of U.S. 50 to the north side of U.S. 50.

Fri., Sep. 11 at 3:00 p.m.

  • Open WB U.S. 50 to MO 291 (Right Turn Movement Only).

Fri., Sep. 11 between 8:00 p.m. and 10:00 p.m.

  • Close the right lane on WB U.S. 50 from west of Todd George to west of MO 291.
  • Close the left lane on EB U.S. 50 west of MO 291 to east of MO 291.

 

Tues. Sept. 8, at 4:00 a.m. until Fri. Nov. 13 at 5:00 p.m.

  • Close NB 291 from Oldham to Blue Parkway
  • Close SB 291 from Blue Parkway to Oldham

Tues. Sept. 8 at 4:00 a.m. until Mon. Sept. 14 at 5:00 p.m.

  • Close the Right Lane EB U.S. 50 from Jefferson to NB MO 291
  • Close ramp from EB U.S. 50 to NB MO 291
  • Close the acceleration lane on the ramp from MO 291 to EB U.S. 50 (barrier wall removal)
  • Close the acceleration lane on the ramp from MO 291 to WB U.S. 50 (barrier wall removal)

Mon. Sept. 14  from 9:00 a.m.- 3:00 p.m.

  • Various intermittent lane closures EB/WB U.S. 50 for striping operations

Fri., Sept. 11 at 10:00 p.m. until Mon., Sept. 14 at 6:00 a.m. REVISED: Mon. Sept. 14 at 10:00 p.m. until Mon. Sept. 21 at 6:00 a.m.

Bridge demo traffic modifications:

  • Close the left lane on WB U.S. 50 west of Todd George to the WB U.S. 50 off ramp. Traffic will be diverted to go up and over the ramp back to U.S. 50.
  • Close the left lane on EB U.S. 50 west of MO 291 to the MO 291 off ramp. Traffic will be diverted to go up and over the ramp back to U.S. 50.

Mon. Sept. 21 at 3:00 p.m. until Fri. Nov. 13 at 5:00 p.m.

  • Various lane closures on EB/WB U.S. 50 at MO 291. The off ramps to MO 291 will be limited to right turns only.

This is part of a larger project at MO 291N and U.S. 50, which includes bridge replacement, road realignment, and ADA improvements from SE 7th Terrace to SE Oldham Parkway in Lee’s Summit with a completion date of January 2027. To learn more about the project visit: Missouri Route 291 North and U.S. Route 50 Interchange Improvements in Jackson | Missouri Department of Transportation

Motorists are reminded to slow down and pay attention while driving in work zones. Not all work zones look alike. Work zones can also be short-term, temporary lane closures to make quick repairs or remove debris form the roadway.

For more information about MoDOT news, projects or events, please visit our website at www.modot.org.kansascity. For instant updates, follow MoDOT_KC on X, or share posts and comments on our Facebook at www.facebook.com/MoDOT.KansasCity/. MoDOT Kansas City maintains more than 7,000 miles of state roadway in nine counties. Sign up online for workzone updates or call 888-ASK-MODOT.

Print

Latest Press Releases

Engineer Brad Faulkner
Engineer Brad Faulkner

Engineer Brad Faulkner

With great sadness, we announce the passing of Engineer Brad Faulkner. Brad collapsed at his son’s sporting event on Thursday, and efforts to resuscitate him were unsuccessful. Brad was a 19-year veteran assigned to A-Shift at Fire Station No. 3. Our thoughts and prayers go out to Brad’s family, friends, and his fire department family.

3 Wheel Bikes Now Available for Rent at LSPR
3 Wheel Bikes Now Available for Rent at LSPR

3 Wheel Bikes Now Available for Rent at LSPR

Lee’s Summit Parks and Recreation would like to announce the purchase of four 3-wheel bikes through a grant funded by Eitas- developmental disabilities services of Jackson County. This purchase allows adults with disabilities, balance impairments, and the senior population to utilize the free bikes reservation program at Lovell and Longview Community Centers. This new amenity will improve the quality of life for many patrons with balance and mobility...
Bedroom Fire Causes Extensive Damage
Bedroom Fire Causes Extensive Damage

Bedroom Fire Causes Extensive Damage

On Tuesday, May 9, 2023, at 4:42 pm, the Lee’s Summit Fire Department responded to a structure fire in the 400 Block of SE Weiss Circle. The occupant called 911 and reported a fire in the upstairs bedroom. The occupant was evacuating the house.  When the fire department arrived, light smoke was coming from the two-story, single-family residence. The occupant and pet were safe outside. Firefighters entered the house to heavy smoke conditions and...
Director of Water Utilities Receives American Water Works Association Award
Director of Water Utilities Receives American Water Works Association Award

Director of Water Utilities Receives American Water Works Association Award

The City of Lee’s Summit is pleased to announce Mark Schaufler, director of Water Utilities, recently received the 2023 Missouri Section American Water Works Association Donald R. Boyd Water Utility Manager Award. This distinguished award recognizes exceptional managerial abilities with a community water supply. Schaufler has been a part of Water Utilities for nearly 30 years, 20 of which are in his current role as director. During his tenure, Schaufler...
Hotel Reoccupied After a Small Fire
Hotel Reoccupied After a Small Fire

Hotel Reoccupied After a Small Fire

On Monday, April 24, 2023, at 6:15 p.m., the Lee’s Summit Fire Department initially responded to an automatic fire alarm at the Quality Inn, 1020 SE Blue Parkway. The incident was upgraded to a structure fire when someone with the business reported smoke on the third floor. Nothing was visible outside the three-story, 63-room hotel when the fire department arrived. The alarms were sounding, and the guests were evacuating the building. Staff reported smoke...
First242628Last