Search Press Releases

Press Release Archive

Press Releases

  |   Views: 7311
  |   Categories: Public Works Press Releases

Colbern Road Safety Improvement Work Begins September 5

Colbern Road Safety Improvement Work Begins September 5

The City of Lee’s Summit announced that work on the Colbern Road Improvements Project begins Sept. 5. The project will improve the safety and flow of traffic on Northwest Colbern Road between Northeast Douglas Street and Missouri Route 350 and will require that section of road to be closed to through traffic until spring 2025.  

The first phase of construction will require a complete closure of Northwest Colbern Road from approximately Missouri Route 350 through the roundabout at Northwest Blue Parkway. This phase includes the reconstruction of the roundabout and realignment of Northwest Blue Parkway from the roundabout to the frontage road along Unity Village. This closure will continue through spring 2024, weather permitting. Detours will be put in place and signage will mark the detour route. Once this phase is complete, Northwest Colbern Road from Missouri Route 350 through the roundabout will reopen. Northwest Colbern Road from Missouri Route 350 to Northeast Douglas Street will remain closed to through traffic until spring 2025.

“With a cost of $30 million, the Colbern Road Improvements Project is the largest capital improvement project in the history of Lee’s Summit. It is a huge transportation improvement for vehicular, freight, bicycle, and pedestrian capacity and safety and supports our City’s long-term community growth,” said Lee’s Summit Mayor Bill Baird. “In addition to funding from the 2017 Capital Improvement Sales Tax and water and sewer funds, we were fortunate to receive grant funding for this project from the federal Surface Transportation Program and the Governor’s Transportation Cost-Share Program. This project was one of 20 transportation projects across the state selected to receive funding from the Governor’s Transportation Cost-Share Program based in part on its economic impact and public benefit.”

The Colbern Road Improvements Project will widen Northwest Colbern Road to four lanes with turn lanes, sidewalks, shared-use paths, curbs and gutters, street lighting and bridge replacement over the Union Pacific Railroad, including bicycle and pedestrian accommodations. These improvements will not only improve the safety of the road but will accommodate future traffic projections. 

For more information about the project, contact Public Works at 969.1800 or publicworks@cityofls.net.

Print

Latest Press Releases

Bedroom Fire Causes Extensive Damage
Bedroom Fire Causes Extensive Damage

Bedroom Fire Causes Extensive Damage

On Tuesday, May 9, 2023, at 4:42 pm, the Lee’s Summit Fire Department responded to a structure fire in the 400 Block of SE Weiss Circle. The occupant called 911 and reported a fire in the upstairs bedroom. The occupant was evacuating the house.  When the fire department arrived, light smoke was coming from the two-story, single-family residence. The occupant and pet were safe outside. Firefighters entered the house to heavy smoke conditions and...
Director of Water Utilities Receives American Water Works Association Award
Director of Water Utilities Receives American Water Works Association Award

Director of Water Utilities Receives American Water Works Association Award

The City of Lee’s Summit is pleased to announce Mark Schaufler, director of Water Utilities, recently received the 2023 Missouri Section American Water Works Association Donald R. Boyd Water Utility Manager Award. This distinguished award recognizes exceptional managerial abilities with a community water supply. Schaufler has been a part of Water Utilities for nearly 30 years, 20 of which are in his current role as director. During his tenure, Schaufler...
Hotel Reoccupied After a Small Fire
Hotel Reoccupied After a Small Fire

Hotel Reoccupied After a Small Fire

On Monday, April 24, 2023, at 6:15 p.m., the Lee’s Summit Fire Department initially responded to an automatic fire alarm at the Quality Inn, 1020 SE Blue Parkway. The incident was upgraded to a structure fire when someone with the business reported smoke on the third floor. Nothing was visible outside the three-story, 63-room hotel when the fire department arrived. The alarms were sounding, and the guests were evacuating the building. Staff reported smoke...
City of Lee’s Summit to Host Sweep the Summit on April 22
City of Lee’s Summit to Host Sweep the Summit on April 22

City of Lee’s Summit to Host Sweep the Summit on April 22

In conjunction with Earth Day, the City of Lee’s Summit is launching Sweep the Summit on Saturday, April 22, a biannual event to address ongoing litter issues, encourage recycling and help keep our city beautiful. Residents, businesses, community groups and students are encouraged to take part in one or all of the four environmental activities planned throughout the City. The events include Street Clean, Stream Team, RecycleFEST and Drug Take-Back...
Six LSFD Personnel Complete Paramedic Training
Six LSFD Personnel Complete Paramedic Training

Six LSFD Personnel Complete Paramedic Training

Six members of the Lee's Summit Fire Department earned their certificate of completion for their paramedic program, which began in October of 2021. Their next step is to complete their practical and written exams, which will allow them to become licensed paramedics in the State of Missouri. Please join us in congratulating Engineer Sandra Hughes, Firefighter Brennan Johnson, Firefighter James Heuer, Firefighter Owen Ellis, Firefighter Cameron Shultz, and...
First212325Last