Search Press Releases

Press Release Archive

Press Releases

  |   Views: 314

Colbern Road Safety Improvement Work Begins September 5

Colbern Road Safety Improvement Work Begins September 5

The City of Lee’s Summit announced that work on the Colbern Road Improvements Project begins Sept. 5. The project will improve the safety and flow of traffic on Northwest Colbern Road between Northeast Douglas Street and Missouri Route 350 and will require that section of road to be closed to through traffic until spring 2025.  

The first phase of construction will require a complete closure of Northwest Colbern Road from approximately Missouri Route 350 through the roundabout at Northwest Blue Parkway. This phase includes the reconstruction of the roundabout and realignment of Northwest Blue Parkway from the roundabout to the frontage road along Unity Village. This closure will continue through spring 2024, weather permitting. Detours will be put in place and signage will mark the detour route. Once this phase is complete, Northwest Colbern Road from Missouri Route 350 through the roundabout will reopen. Northwest Colbern Road from Missouri Route 350 to Northeast Douglas Street will remain closed to through traffic until spring 2025.

“With a cost of $30 million, the Colbern Road Improvements Project is the largest capital improvement project in the history of Lee’s Summit. It is a huge transportation improvement for vehicular, freight, bicycle, and pedestrian capacity and safety and supports our City’s long-term community growth,” said Lee’s Summit Mayor Bill Baird. “In addition to funding from the 2017 Capital Improvement Sales Tax and water and sewer funds, we were fortunate to receive grant funding for this project from the federal Surface Transportation Program and the Governor’s Transportation Cost-Share Program. This project was one of 20 transportation projects across the state selected to receive funding from the Governor’s Transportation Cost-Share Program based in part on its economic impact and public benefit.”

The Colbern Road Improvements Project will widen Northwest Colbern Road to four lanes with turn lanes, sidewalks, shared-use paths, curbs and gutters, street lighting and bridge replacement over the Union Pacific Railroad, including bicycle and pedestrian accommodations. These improvements will not only improve the safety of the road but will accommodate future traffic projections. 

For more information about the project, contact Public Works at 969.1800 or publicworks@cityofls.net.

Print

Latest Press Releases

Ember from Burning Brush Pile Ignites House
Ember from Burning Brush Pile Ignites House

Ember from Burning Brush Pile Ignites House

On Wednesday, September 20, 2023, at 5:03 p.m., the Lee's Summit Fire Department responded to a structure fire in the 1500 Block of SW Highway Lane. A passerby reported smoke and fire from the house's roof with no one around. When the fire department arrived, smoke was visible from the roof of a one-story, single-family vacant residence under renovation. A worker was in the backyard attempting to extinguish a brush pile fire near the house.  The...
Colbern Road Safety Improvement Work Begins September 5
Colbern Road Safety Improvement Work Begins September 5

Colbern Road Safety Improvement Work Begins September 5

The City of Lee’s Summit announced that work on the Colbern Road Improvements Project begins Sept. 5. The project will improve the safety and flow of traffic on Northwest Colbern Road between Northeast Douglas Street and Missouri Route 350 and will require that section of road to be closed to through traffic until spring 2025.   The first phase of construction will require a complete closure of Northwest Colbern Road from approximately Missouri Route...
Friday Evening Fire Damages Home

Friday Evening Fire Damages Home

On Friday, September 1, at 9:23 p.m., the Lee's Summit Fire Department responded to a structure fire in the 1000 Block of SW Whistle Drive. The occupant returned home Friday evening to find smoke coming from the house and called 911. When the fire department arrived, heavy smoke was coming from the garage, and fire was visible inside the two-story, single-family residence. The occupants were safe outside. Firefighters entered the building and knocked down...
2023 Lee’s Summit Water Utilities Customer Survey Results
2023 Lee’s Summit Water Utilities Customer Survey Results

2023 Lee’s Summit Water Utilities Customer Survey Results

Lee’s Summit Water Utilities released results from the 2023 Customer Satisfaction Survey that show customer satisfaction ratings significantly higher than the U.S. and regional averages. The survey is administered by ETC Institute to a random sample of households and provides a snapshot of how customers view the delivery of water and sewer services. Of the 402 respondents, 84% indicated overall satisfaction with the delivery of services, a 2% increase over...
Trailer Fire at Dock of Food Warehouse

Trailer Fire at Dock of Food Warehouse

On Thursday, August 3, at 11:47 p.m., the Lee's Summit Fire Department responded to a structure fire at Performance Food Group (PFG), 290 SE Thompson Drive. Employees coming to work discovered a fire involving a refrigerated semi-trailer parked against the dock door. When crews arrived, the fire had engulfed the box trailer at the dock door of a large food distribution warehouse. A second alarm was requested for additional personnel and equipment. The fire...
1345Last