Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 4626

Fire Causes Extensive Damage to Home in Lee's Summit

Fire Causes Extensive Damage to Home in Lee's Summit

A structure fire on Thursday, October 2, 2025, caused extensive damage to a home in the 100 block of NE Maple Street. The Lee's Summit Fire Department responded at 5:14 p.m. after multiple people driving by reported smoke coming from the roof vents of the residence. The occupant of the home also called 911 to report the fire.

Upon arrival, firefighters observed smoke and flames visible from the back and roof of the single-story house. All occupants were safe outside, both required medical assessment.

Firefighters entered the building and were bringing the fire under control in the living area and rear of the house. However, the flames had spread to the attic, compromising the roof structure and forcing crews to transition to an exterior attack. After the fire was brought under control, crews re-entered the home for an extensive overhaul. Multiple remodels and additions created hidden spaces within the structure, making firefighting efforts difficult. The incident was under control by 6:54 p.m.

One occupant was taken by ambulance to a local hospital, and their condition is currently unknown. Additionally, one firefighter was transported to the hospital, treated, and later released.

The fire resulted in extensive damage to the house. The cause is currently under investigation.

Print

Latest News

Volunteers Needed for Stream Team Cleanup

Volunteers Needed for Stream Team Cleanup

Volunteers Needed for Stream Team Cleanup
The City of Lee’s Summit is looking for volunteers to participate in a Stream Team Cleanup on October 8. Volunteers will help remove litter and debris from a Prairie Lee tributary from 10 a.m. - noon at Upper Banner Park, 520 NE Noeleen Lane. “Protecting our natural resources is a priority and this is a small way to invest in the community,” Environmentalist Specialist Kara Taylor said. “Stream Team cleanup events are an opportunity to not...
Section of NW O’Brien Road Set to Close Sept. 26

Section of NW O’Brien Road Set to Close Sept. 26

Section of NW O’Brien Road Set to Close Sept. 26
Update: This section of NW O'Brien Road is now open. Update: This section of NW O'Brien Road will remain closed until Saturday, Oct. 22, weather permitting. A section of NW O’Brien Road from NW Village Drive to NW Transition is set to close on Monday, Sept. 26, and will remain closed until Oct. 17, weather permitting. This closure is pending the re-opening of NW Chipman Road under the U.S. Route 50 bridges. The work is necessary to perform...
Update: Closure Postponed

Update: Closure Postponed

Update: Closure Postponed

Section of NW O'Brien Road Set for Daily Closures Beginning Sept. 13

Update: This closure is postponed until Chipman Road is opened at U.S. Route 50. Until Chipman Road is open in that location, a work zone is set to be in place on NW O’Brien Road west of NW Ward Road that allows two-way traffic and includes a lane shift. The section of NW O’Brien Road west of NW Ward Road is set to close daily once Chipman Road is open at U.S. Route 50. More details to follow. A section of NW O’Brien Road west of NW Ward...
Section of SE Hamblen Road Set to Close Sept. 9-12

Section of SE Hamblen Road Set to Close Sept. 9-12

Section of SE Hamblen Road Set to Close Sept. 9-12
A section of SE Hamblen Road north of SE Bailey Road is set to close at 7 p.m. on Friday, Sept. 9, and will remain closed until 5:30 a.m. on Monday, Sept. 12, weather permitting. This closure is necessary for the removal and replacement of stormwater pipes that cross SE Hamblen Road. The detour route is SE Bailey Road, SE Century Drive, and SE Oldham Parkway. This work is part of the Browning Street Extension Project, which will extend the current Browning Street...
Public Hearing for Pryor Road Improvements Set for July 20

Public Hearing for Pryor Road Improvements Set for July 20

Public Hearing for Pryor Road Improvements Set for July 20

The City of Lee’s Summit will host a public hearing to discuss the right-of-way stage design for Pryor Road from Longview Road to Hook Road on July 20 from 4:30 to 6:30 p.m. at Fire Station No. 7, 2150 SW Scherer Rd.

First454648