Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 4626

Fire Causes Extensive Damage to Home in Lee's Summit

Fire Causes Extensive Damage to Home in Lee's Summit

A structure fire on Thursday, October 2, 2025, caused extensive damage to a home in the 100 block of NE Maple Street. The Lee's Summit Fire Department responded at 5:14 p.m. after multiple people driving by reported smoke coming from the roof vents of the residence. The occupant of the home also called 911 to report the fire.

Upon arrival, firefighters observed smoke and flames visible from the back and roof of the single-story house. All occupants were safe outside, both required medical assessment.

Firefighters entered the building and were bringing the fire under control in the living area and rear of the house. However, the flames had spread to the attic, compromising the roof structure and forcing crews to transition to an exterior attack. After the fire was brought under control, crews re-entered the home for an extensive overhaul. Multiple remodels and additions created hidden spaces within the structure, making firefighting efforts difficult. The incident was under control by 6:54 p.m.

One occupant was taken by ambulance to a local hospital, and their condition is currently unknown. Additionally, one firefighter was transported to the hospital, treated, and later released.

The fire resulted in extensive damage to the house. The cause is currently under investigation.

Print

Latest News

Curb Replacement on Section of NW Chipman Road

Curb Replacement on Section of NW Chipman Road

Preparations began this week for curb replacement on a section of NW Chipman Road from U.S. Route 50 to the railroad bridge just east of NW Donovan Road. Curb removal is expected to start on Mon., Nov. 7, with pours and restoration to follow as well as sidewalk ramp replacement in several locations. The work is expected to take approximately three weeks, weather permitting. While there will be lane closures during this work, both eastbound and westbound NW Chipman...
Community Notification: Flood Hazard Revisions Along Cedar Creek

Community Notification: Flood Hazard Revisions Along Cedar Creek

The City of Lee’s Summit, Missouri, Public Works Department in accordance with National Flood Insurance Program regulation 65.7(b)(1), hereby gives notice of the City of Lee’s Summit’s intent to revise the flood hazard information, generally located upstream and downstream of SW Ward Road along Cedar Creek. The flood hazard revisions are being proposed as part of Letter of Map Revision (LOMR, Case No. 22-07-0797P) for a completed construction...
Surface Seal Work Set to Begin on SE 2nd Street

Surface Seal Work Set to Begin on SE 2nd Street

Update: The contractor working on SE 2nd Street had an equipment failure earlier today, Tuesday, Nov. 1, and stopped work; however, work is tentatively expected to take place again from 9 a.m. – 4 p.m. tomorrow, Wed., Nov. 2. In order to complete surface sealing along SE 2nd Street at intersections, there will be short-term closures of Jefferson, Market, SE Main, Douglas and Green crossing SE 2nd Street. Eastbound and westbound traffic will be maintained...
Section of SW Jefferson Street Also Closed for SW 3rd Street Utility Work

Section of SW Jefferson Street Also Closed for SW 3rd Street Utility Work

Section of SW Jefferson Street Also Closed for SW 3rd Street Utility Work
Update: Phase two of the SW 3rd Street utility work is now expected to start on Mon., Oct. 17, with the closure of both eastbound and westbound through traffic on SW 3rd Street from SW Blue Parkway to SW Jefferson Street. The section of SW Jefferson Street from SW 3rd Street to SW 2nd Street is expected to be back open by noon on Mon., Oct. 17. During phase one of the utility work on SW 3rd Street which started today, a section of SW Jefferson Street from SW...
Section of SW 3rd Street Set to Close to Through Traffic Oct. 10

Section of SW 3rd Street Set to Close to Through Traffic Oct. 10

Section of SW 3rd Street Set to Close to Through Traffic Oct. 10
Update 2/28/23: Both eastbound and westbound lanes of SW 3rd Street from SW Blue Parkway to SW Jefferson Street are now open to through traffic. Utility work continues primarily in the center/middle lane as the crew is still proofing the pipe and pulling cables through the duct bank. This work is anticipated to be complete in two weeks, weather permitting. A section of SW 3rd Street from SW Blue Parkway to SW Jefferson Street is set to close to through...
First454749Last