Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 829
  |   Categories: Public Works News

REVISED MoDOT Update: Closures on MO 291 and U.S. 50 in Lee's Summit for bridge replacement operations Now - November 2026

The following information is shared from the Missouri Department of Transportation (MoDOT) and is related to the 291 North and US Route 50 Interchange project. https://www.modot.org/node/94913

Projects: Missouri Route 291 North and U.S. Route 50 Interchange Improvements in Jackson

JACKSON COUNTY – The Missouri Department of Transportation will conduct various closures and traffic modifications on Missouri Route 291 and U.S. MO 50 for bridge replacement operations. All work is weather permitting. See below for traffic modifications:

(Additional dates and modifications added)

Friday, Aug. 14 - Saturday Aug. 15 between 7:00am-3:00pm

  • Various lane closures on north and southbound MO 291 from SE Oldham to North of Bayberry.

Tuesday, Aug. 18 at 9:00am

  • Place traffic on the new Blue Parkway east and west of MO 291.

Tuesday, Aug. 18 at 12:00pm until Friday, Nov. 13 at 5:00pm

  • Close southbound MO 291 from Blue Parkway to the south side of U.S. 50. Motorists are encouraged to utilize Blue Parkway to Todd George.

Added: Wed., Aug. 19 7:00 p.m. until Thu., Aug. 20 6:00 a.m.

  • Close the right lane on WB U.S. 50 from west of Todd George to MO 291.

Added: Thu., Aug. 20 between 9:00 a.m. and 12:00 p.m.

  • Close the ramp from MO 291 to WB U.S. 50.

Added: Thu., Aug. 20 between 12:00 p.m. and 4:00 p.m.

  • Close the ramp from MO 291 to EB U.S. 50.

Added: Thu., Aug. 20 at 8:00 p.m. until Fri., Aug. 21 at 6:00 a.m.

  • Close the right lane on EB U.S. 50 from MO 291 south (Jefferson St) to MO 291 and close the EB off ramp to MO 291.

Fri., Sep. 11 at 10:00 a.m. until Fri., Nov. 13 at 5:00 p.m.

  • Close NB MO 291 from the south side of U.S. 50 to the north side of U.S. 50.

Fri., Sep. 11 at 3:00 p.m.

  • Open WB U.S. 50 to MO 291 (Right Turn Movement Only).

Fri., Sep. 11 between 8:00 p.m. and 10:00 p.m.

  • Close the right lane on WB U.S. 50 from west of Todd George to west of MO 291.
  • Close the left lane on EB U.S. 50 west of MO 291 to east of MO 291.

Fri., Sept. 11 at 10:00 p.m. until Mon., Sept. 14 at 6:00 a.m.

Bridge demo traffic modifications:

  • Close the left lane on WB U.S. 50 west of Todd George to the WB U.S. 50 off ramp. Traffic will be diverted to go up and over the ramp back to U.S. 50.
  • Close the left lane on EB U.S. 50 west of MO 291 to the MO 291 off ramp. Traffic will be diverted to go up and over the ramp back to U.S. 50.

This is part of a larger project at MO 291N and U.S. 50, which includes bridge replacement, road realignment, and ADA improvements from SE 7th Terrace to SE Oldham Parkway in Lee’s Summit with a completion date of January 2027. To learn more about the project visit: Missouri Route 291 North and U.S. Route 50 Interchange Improvements in Jackson | Missouri Department of Transportation

Motorists are reminded to slow down and pay attention while driving in work zones. Not all work zones look alike. Work zones can also be short-term, temporary lane closures to make quick repairs or remove debris form the roadway.

For more information about MoDOT news, projects or events, please visit our website at www.modot.org.kansascity. For instant updates, follow MoDOT_KC on X, or share posts and comments on our Facebook at www.facebook.com/MoDOT.KansasCity/. MoDOT Kansas City maintains more than 7,000 miles of state roadway in nine counties. Sign up online for workzone updates or call 888-ASK-MODOT.

Print

Latest News

City Crews Prepared to Respond as Needed to Snow Monday, Jan. 15

City Crews Prepared to Respond as Needed to Snow Monday, Jan. 15

The City’s crews prepared trucks and equipment to respond as needed today, Monday, Jan. 15, due to the forecast for light snow. Extremely cold weather limits the effectiveness of salt treatments and streets may be slick. Drivers should use caution. The City will continue to monitor the weather and will call out crews as needed for response.   

City Crews Treating Streets as Needed Today, Friday, Jan. 12

City Crews Treating Streets as Needed Today, Friday, Jan. 12

The City’s crews treated all streets with salt overnight into today, Friday, Jan. 12. With light snow expected today, crews will continue to monitor and treat streets as needed. Temperatures have fallen and will remain dangerously cold through the weekend and into next week. Extremely cold temperatures limit the effectiveness of salt, and streets may remain snow packed and slick. Drivers should continue to use caution.

City Crews Pre-Treating Streets Tonight, Thursday, Jan. 11

City Crews Pre-Treating Streets Tonight, Thursday, Jan. 11

The City’s crews are pre-treating streets with salt tonight, Thursday, Jan. 11, in advance of another round of winter weather. Temperatures may fall below freezing earlier than previously expected, and will stay there. Crews may need to treat primary streets again as temperatures drop and streets get slick. Drivers should use caution especially on elevated surfaces such as bridges and overpasses.

City Crews Continue Plowing and Treating Residential Streets Today; Set to Prepare for Next Round of Winter Weather Tonight

City Crews Continue Plowing and Treating Residential Streets Today; Set to Prepare for Next Round of Winter Weather Tonight

The City’s crews continue plowing and treating residential streets today, Thursday, Jan. 11. Crews are 89% complete and now expect to finish this afternoon or early evening. Crews will then be preparing for additional winter weather this evening and overnight into Friday, Jan. 12. Favorable temperatures today are helping with continued melting on streets. The next storm is expected to begin tonight as rain and will change over to ice and snow as temperatures...
City Crews Continue Plowing and Treating Residential Streets

City Crews Continue Plowing and Treating Residential Streets

The City’s crews are plowing and treating residential streets tonight, Wed., Jan. 10, and will continue overnight into Thurs., Jan. 11. Crews have completed approximately 65% of streets and expect to be done by noon Thursday. Some streets will continue to be packed with snow even after being plowed and treated. Some melting occurred throughout the day today, and streets may refreeze as temperatures drop overnight into Thursday. Drivers should continue to use...
First404244Last