Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 2787
  |   Categories: Public Works News

REVISED MoDOT Update: Closures on MO 291 and U.S. 50 in Lee's Summit for bridge replacement operations Now - November 2026

The following information is shared from the Missouri Department of Transportation (MoDOT) and is related to the 291 North and US Route 50 Interchange project. https://www.modot.org/node/94913

Project: Missouri Route 291 North and U.S. Route 50 Interchange Improvements in Jackson

JACKSON COUNTY – The Missouri Department of Transportation will conduct various closures and traffic modifications on Missouri Route 291 and U.S. MO 50 for bridge replacement operations. All work is weather permitting. See below for traffic modifications (all times listed are approximate):

Additional dates and modifications added

Friday, Aug. 14 - Saturday Aug. 15 between 7:00am-3:00pm

  • Various lane closures on north and southbound MO 291 from SE Oldham to North of Bayberry.

Tuesday, Aug. 18 at 9:00am

  • Place traffic on the new Blue Parkway east and west of MO 291.

Tuesday, Aug. 18 at 12:00pm until Friday, Nov. 13 at 5:00pm

  • Close southbound MO 291 from Blue Parkway to the south side of U.S. 50. Motorists are encouraged to utilize Blue Parkway to Todd George.

Added: Wed., Aug. 19 7:00 p.m. until Thu., Aug. 20 6:00 a.m.

  • Close the right lane on WB U.S. 50 from west of Todd George to MO 291.

Added: Thu., Aug. 20 between 9:00 a.m. and 12:00 p.m.

  • Close the ramp from MO 291 to WB U.S. 50.

Added: Thu., Aug. 20 between 12:00 p.m. and 4:00 p.m.

  • Close the ramp from MO 291 to EB U.S. 50.

Added: Thu., Aug. 20 at 8:00 p.m. until Fri., Aug. 21 at 6:00 a.m.

  • Close the right lane on EB U.S. 50 from MO 291 south (Jefferson St) to MO 291 and close the EB off ramp to MO 291.

Added 8/25/26: (TODAY) Tuesday, August 25 at 9:00 a.m. - 3:00 p.m.

  • Close the right lane on NB 291 from SE Oldham to South of Blue Parkway.
  • Close the right lane on SB 291 from Bayberry to 50 Highway.

Added 8/25/26: The Missouri Department of Transportation will CLOSE the ramp from MO 291 to westbound U.S. 50 in Lee’s Summit for bridge project operations beginning tomorrow, Aug. 26 between 9 a.m. and 3 p.m. All work is weather permitting.

Fri., Sep. 11 at 10:00 a.m. until Fri., Nov. 13 at 5:00 p.m.

  • Close NB MO 291 from the south side of U.S. 50 to the north side of U.S. 50.

Fri., Sep. 11 at 3:00 p.m.

  • Open WB U.S. 50 to MO 291 (Right Turn Movement Only).

Fri., Sep. 11 between 8:00 p.m. and 10:00 p.m.

  • Close the right lane on WB U.S. 50 from west of Todd George to west of MO 291.
  • Close the left lane on EB U.S. 50 west of MO 291 to east of MO 291.

 

Tues. Sept. 8, at 4:00 a.m. until Fri. Nov. 13 at 5:00 p.m.

  • Close NB 291 from Oldham to Blue Parkway
  • Close SB 291 from Blue Parkway to Oldham

Tues. Sept. 8 at 4:00 a.m. until Mon. Sept. 14 at 5:00 p.m.

  • Close the Right Lane EB U.S. 50 from Jefferson to NB MO 291
  • Close ramp from EB U.S. 50 to NB MO 291
  • Close the acceleration lane on the ramp from MO 291 to EB U.S. 50 (barrier wall removal)
  • Close the acceleration lane on the ramp from MO 291 to WB U.S. 50 (barrier wall removal)

Mon. Sept. 14  from 9:00 a.m.- 3:00 p.m.

  • Various intermittent lane closures EB/WB U.S. 50 for striping operations

Fri., Sept. 11 at 10:00 p.m. until Mon., Sept. 14 at 6:00 a.m. REVISED: Mon. Sept. 14 at 10:00 p.m. until Mon. Sept. 21 at 6:00 a.m.

Bridge demo traffic modifications:

  • Close the left lane on WB U.S. 50 west of Todd George to the WB U.S. 50 off ramp. Traffic will be diverted to go up and over the ramp back to U.S. 50.
  • Close the left lane on EB U.S. 50 west of MO 291 to the MO 291 off ramp. Traffic will be diverted to go up and over the ramp back to U.S. 50.

Mon. Sept. 21 at 3:00 p.m. until Fri. Nov. 13 at 5:00 p.m.

  • Various lane closures on EB/WB U.S. 50 at MO 291. The off ramps to MO 291 will be limited to right turns only.

This is part of a larger project at MO 291N and U.S. 50, which includes bridge replacement, road realignment, and ADA improvements from SE 7th Terrace to SE Oldham Parkway in Lee’s Summit with a completion date of January 2027. To learn more about the project visit: Missouri Route 291 North and U.S. Route 50 Interchange Improvements in Jackson | Missouri Department of Transportation

Motorists are reminded to slow down and pay attention while driving in work zones. Not all work zones look alike. Work zones can also be short-term, temporary lane closures to make quick repairs or remove debris form the roadway.

For more information about MoDOT news, projects or events, please visit our website at www.modot.org.kansascity. For instant updates, follow MoDOT_KC on X, or share posts and comments on our Facebook at www.facebook.com/MoDOT.KansasCity/. MoDOT Kansas City maintains more than 7,000 miles of state roadway in nine counties. Sign up online for workzone updates or call 888-ASK-MODOT.

Print

Latest News

Section of Northbound NE Rice Road Set to Close Wed., Jan. 31

Section of Northbound NE Rice Road Set to Close Wed., Jan. 31

Section of Northbound NE Rice Road Set to Close Wed., Jan. 31
A section of northbound NE Rice Road is set to close on Wed., Jan. 31, for approximately two months. The contractor anticipates intermittent daily closures. The closure will be next to the retention pond and is necessary for stormwater pipe repair. The detour route is NE Langsford Road, M291 Hwy, and NE Columbus Street. A southbound closure and detour will be necessary at a later date. Work is weather permitting and schedules are subject to change.  
City Crews Completed Snow Operations Today, Mon., Jan. 22

City Crews Completed Snow Operations Today, Mon., Jan. 22

The City’s crews completed snow operations early afternoon today, Mon., Jan. 22, after pavement temperatures rose above freezing and pavements were mostly wet. Temperatures are expected to remain above freezing for the rest of the week, and any remaining snow and ice pack should continue melting.

City Crews Treating Streets Today, Monday, Jan. 22

City Crews Treating Streets Today, Monday, Jan. 22

The City’s crews are treating streets today, Monday, Jan. 22, after freezing rain impacted the Lee’s Summit area. Additional crews were called in early this morning, and primary streets are completed. Crews are currently working in secondary streets. Streets are slick and drivers should use caution. Pavement temperatures are expected to warm above freezing after 10 a.m.

City Crew Scheduled to Treat Streets as Needed Early Monday, Jan. 22

City Crew Scheduled to Treat Streets as Needed Early Monday, Jan. 22

The City has a crew scheduled to treat streets with salt as needed beginning at 3 a.m. Monday, Jan. 22, due to the forecast for freezing rain. Residual salt remains on streets from treatment the last two weeks; however, streets are still expected to get slick as the temperature falls and freezing rain starts. Drivers should use caution during the Monday morning commute especially on elevated surfaces such as bridges and overpasses. The City will continue to...
City Crews Scheduled to Treat Streets as Needed

City Crews Scheduled to Treat Streets as Needed

The City’s crews are scheduled to report at 7 p.m. to treat streets with salt as needed tonight, Thurs., Jan. 18, and overnight into Fri., Jan. 19. A flash freeze is possible tonight for any wet pavements or surfaces as temperatures fall, and drivers should use caution especially on elevated surfaces such as bridges and overpasses. Accumulation of ¼ inch to 1 inch of snow is expected before midnight. Conditions will be challenging – high winds...
First394143Last