Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 2792
  |   Categories: Public Works News

REVISED MoDOT Update: Closures on MO 291 and U.S. 50 in Lee's Summit for bridge replacement operations Now - November 2026

The following information is shared from the Missouri Department of Transportation (MoDOT) and is related to the 291 North and US Route 50 Interchange project. https://www.modot.org/node/94913

Project: Missouri Route 291 North and U.S. Route 50 Interchange Improvements in Jackson

JACKSON COUNTY – The Missouri Department of Transportation will conduct various closures and traffic modifications on Missouri Route 291 and U.S. MO 50 for bridge replacement operations. All work is weather permitting. See below for traffic modifications (all times listed are approximate):

Additional dates and modifications added

Friday, Aug. 14 - Saturday Aug. 15 between 7:00am-3:00pm

  • Various lane closures on north and southbound MO 291 from SE Oldham to North of Bayberry.

Tuesday, Aug. 18 at 9:00am

  • Place traffic on the new Blue Parkway east and west of MO 291.

Tuesday, Aug. 18 at 12:00pm until Friday, Nov. 13 at 5:00pm

  • Close southbound MO 291 from Blue Parkway to the south side of U.S. 50. Motorists are encouraged to utilize Blue Parkway to Todd George.

Added: Wed., Aug. 19 7:00 p.m. until Thu., Aug. 20 6:00 a.m.

  • Close the right lane on WB U.S. 50 from west of Todd George to MO 291.

Added: Thu., Aug. 20 between 9:00 a.m. and 12:00 p.m.

  • Close the ramp from MO 291 to WB U.S. 50.

Added: Thu., Aug. 20 between 12:00 p.m. and 4:00 p.m.

  • Close the ramp from MO 291 to EB U.S. 50.

Added: Thu., Aug. 20 at 8:00 p.m. until Fri., Aug. 21 at 6:00 a.m.

  • Close the right lane on EB U.S. 50 from MO 291 south (Jefferson St) to MO 291 and close the EB off ramp to MO 291.

Added 8/25/26: (TODAY) Tuesday, August 25 at 9:00 a.m. - 3:00 p.m.

  • Close the right lane on NB 291 from SE Oldham to South of Blue Parkway.
  • Close the right lane on SB 291 from Bayberry to 50 Highway.

Added 8/25/26: The Missouri Department of Transportation will CLOSE the ramp from MO 291 to westbound U.S. 50 in Lee’s Summit for bridge project operations beginning tomorrow, Aug. 26 between 9 a.m. and 3 p.m. All work is weather permitting.

Fri., Sep. 11 at 10:00 a.m. until Fri., Nov. 13 at 5:00 p.m.

  • Close NB MO 291 from the south side of U.S. 50 to the north side of U.S. 50.

Fri., Sep. 11 at 3:00 p.m.

  • Open WB U.S. 50 to MO 291 (Right Turn Movement Only).

Fri., Sep. 11 between 8:00 p.m. and 10:00 p.m.

  • Close the right lane on WB U.S. 50 from west of Todd George to west of MO 291.
  • Close the left lane on EB U.S. 50 west of MO 291 to east of MO 291.

 

Tues. Sept. 8, at 4:00 a.m. until Fri. Nov. 13 at 5:00 p.m.

  • Close NB 291 from Oldham to Blue Parkway
  • Close SB 291 from Blue Parkway to Oldham

Tues. Sept. 8 at 4:00 a.m. until Mon. Sept. 14 at 5:00 p.m.

  • Close the Right Lane EB U.S. 50 from Jefferson to NB MO 291
  • Close ramp from EB U.S. 50 to NB MO 291
  • Close the acceleration lane on the ramp from MO 291 to EB U.S. 50 (barrier wall removal)
  • Close the acceleration lane on the ramp from MO 291 to WB U.S. 50 (barrier wall removal)

Mon. Sept. 14  from 9:00 a.m.- 3:00 p.m.

  • Various intermittent lane closures EB/WB U.S. 50 for striping operations

Fri., Sept. 11 at 10:00 p.m. until Mon., Sept. 14 at 6:00 a.m. REVISED: Mon. Sept. 14 at 10:00 p.m. until Mon. Sept. 21 at 6:00 a.m.

Bridge demo traffic modifications:

  • Close the left lane on WB U.S. 50 west of Todd George to the WB U.S. 50 off ramp. Traffic will be diverted to go up and over the ramp back to U.S. 50.
  • Close the left lane on EB U.S. 50 west of MO 291 to the MO 291 off ramp. Traffic will be diverted to go up and over the ramp back to U.S. 50.

Mon. Sept. 21 at 3:00 p.m. until Fri. Nov. 13 at 5:00 p.m.

  • Various lane closures on EB/WB U.S. 50 at MO 291. The off ramps to MO 291 will be limited to right turns only.

This is part of a larger project at MO 291N and U.S. 50, which includes bridge replacement, road realignment, and ADA improvements from SE 7th Terrace to SE Oldham Parkway in Lee’s Summit with a completion date of January 2027. To learn more about the project visit: Missouri Route 291 North and U.S. Route 50 Interchange Improvements in Jackson | Missouri Department of Transportation

Motorists are reminded to slow down and pay attention while driving in work zones. Not all work zones look alike. Work zones can also be short-term, temporary lane closures to make quick repairs or remove debris form the roadway.

For more information about MoDOT news, projects or events, please visit our website at www.modot.org.kansascity. For instant updates, follow MoDOT_KC on X, or share posts and comments on our Facebook at www.facebook.com/MoDOT.KansasCity/. MoDOT Kansas City maintains more than 7,000 miles of state roadway in nine counties. Sign up online for workzone updates or call 888-ASK-MODOT.

Print

Latest News

Section of SW Sampson Road Set for Daily Closure Beginning March 4

Section of SW Sampson Road Set for Daily Closure Beginning March 4

Section of SW Sampson Road Set for Daily Closure Beginning March 4
Update: This SW Sampson Road closure has been rescheduled to the week of March 11. Work is weather dependent and subject to change. A section of SW Sampson Road between SW Hook Road/E 139th Street and SW Scherer Road is set to close to through traffic daily from 9 a.m. to 4 p.m. beginning March 4, and lasting for approximately two days. Work is weather dependent and subject to change; permit is approved for the entire week March 4-8. The full closure will...
Section of SW Arboridge Drive Closed

Section of SW Arboridge Drive Closed

Section of SW Arboridge Drive Closed
Update: the section of SW Arboridge Drive north of M150 Hwy will remain closed through approximately mid-March. A section of SW Arboridge Drive north of M150 Hwy is closed for approximately two weeks. The detour route is M150 Hwy, SW Arborlake Dr, and SW Arborwalk Blvd. The work is development related, and the closure is necessary for the installation of sanitary and stormwater facilities. Work is weather permitting and subject to change.
Full Closure of Section of NE Rice Road on Wed., Feb. 14

Full Closure of Section of NE Rice Road on Wed., Feb. 14

Full Closure of Section of NE Rice Road on Wed., Feb. 14
As an update to the stormwater work along NE Rice Road, there will be a full closure of both the northbound and southbound sections of NE Rice Road between 301 NE Rice Rd and 401 NE Rice Rd from approximately 7 a.m. to 4 p.m. on Wed., Feb. 14. Detour routes remain NE Langsford Road, M291 Hwy, and NE Columbus Street.  
Daily Closures of Section of SE Third Street Set to Begin Wed., Feb. 14

Daily Closures of Section of SE Third Street Set to Begin Wed., Feb. 14

Daily Closures of Section of SE Third Street Set to Begin Wed., Feb. 14

A section of SE Third Street between SE Douglas and SE Green streets as well as nearby alleys are set to close from 9 a.m. to 4 p.m. daily beginning Wed., Feb. 14. The closures will start on the south side and then switch to the north side and will last for approximately one month. The closures will affect traffic, parking and alley access on the side of the street in which the contractor is working.

 

 

Closures of SW Hollywood Dr. & SW Summitcrest Dr. Set for Mon., Feb. 5

Closures of SW Hollywood Dr. & SW Summitcrest Dr. Set for Mon., Feb. 5

Closures of SW Hollywood Dr. & SW Summitcrest Dr. Set for Mon., Feb. 5

SW Hollywood Drive north of M150 Hwy and SW Summitcrest Drive between SW Hollywood Drive and SW Market Street are set to close on Monday, Feb. 5, for approximately one week. Detour routes include SW Kenbrige Xing, SW Market Street, and SW Cheddington Drive. The closures are for utility work associated with development activity. Work is weather permitting and subject to change.

 

First384042Last