Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 13968
  |   Categories: Fire Department Press Releases

Fireworks in Lee's Summit

Fireworks in Lee's Summit

Fireworks tents are opening in the area, and people are planning Independence Day celebrations. If your plans include fireworks, remember to use them responsibly and follow local regulations and safety guidelines. As drought conditions worsen in Missouri, put fireworks safety first as we prepare for Independence Day celebrations. Sparks from fireworks can easily ignite grass and natural cover fires and pose a risk to structures. We urge everyone to consider local conditions and use extreme caution if using consumer fireworks. 

In the City of Lee's Summit, residents with a 2023 Fireworks Permit may discharge approved fireworks on July 2 and 3 from 10 a.m. to 11 p.m. and July 4 from 10 a.m. to midnight. Fireworks permits are free and available at City Hall, any approved fireworks tents in Lee's Summit, or on the City's website.

The City's ordinance allows the possession and use of approved consumer fireworks (1.4G) within the city limits. Consumer fireworks not allowed include rockets on a stick (bottle rockets), missiles with fins or rudders for aerodynamic flight, roman candles, and parachutes that suspend illuminated materials. Although not a firework, the use of sky lanterns is also prohibited. Fireworks sold at the 17 approved not-for-profit tents are legal for use in Lee's Summit.

Legal does not mean fireworks are safe; remember, fireworks are explosives capable of doing great harm when misused! Before shooting fireworks:

  1. Make sure you have plenty of space.  Follow local regulations on where you can use fireworks.
  2. Avoid areas of dry vegetation or other combustible materials, have a water hose or bucket available in case of a small fire, and dispose of sparkler wires.
  3. Keep small children and pets out of the immediate area.
  4. Only hold a lit firework in your hand if designed to be. 
  5. Never run while holding a sparkler.
  6. Light one device at a time, and never try to relight a firework.
  7. Never use fireworks under the influence of drugs or alcohol.
  8. Safely dispose of waste material. Soak down debris and keep it separate from the regular trash. 
  9. Wear eye protection.

The safest way to celebrate the holiday is to visit one of the many professional fireworks displays in the area, such as Legacy Blast at Legacy Park on July 3.

The most frequent fireworks complaints are the mess left behind by people who don't clean up afterward, discharge onto property other than their own, and fireworks after hours. Be courteous of neighbors that may have different enthusiasm about celebrating the holiday and clean up your mess!

For questions about the fireworks, contact the Lee's Summit Fire Department at (816) 969-1300. To report the misuse or illegal fireworks, contact the Lee's Summit Police Department at (816) 969-7390.

Print

Latest News

Section of SW Lakeview Blvd Set for Daily Closures Beginning Sept. 20

Section of SW Lakeview Blvd Set for Daily Closures Beginning Sept. 20

Section of SW Lakeview Blvd Set for Daily Closures Beginning Sept. 20
Update: This closure has been extended through Jan. 19, 2024. Daily closures approved from 9 a.m. - 4 p.m. A section of SW Lakeview Boulevard between SW 2nd Street and SW 3rd Street is set to close to through traffic daily from 9 a.m. to 3:30 p.m. beginning Wed., Sept. 20. These daily closures are expected to last for approximately one month. A contractor will be replacing a gas main as part of private utility work. Local access will be provided for residents. The...
Public Hearing for M291 North Interchange at US 50 Highway Improvements Project Set for Oct. 3

Public Hearing for M291 North Interchange at US 50 Highway Improvements Project Set for Oct. 3

Online Public Hearing Also Offered Oct. 3 Through Oct. 17

The City of Lee’s Summit, in partnership with the Missouri Department of Transportation (MoDOT), will host an in-person public hearing to discuss the design for the M291 North Interchange at US 50 Highway Improvements Project on Tuesday, October 3, 2023, from 4:30 to 7 p.m. in the City Council Chambers at City Hall, 220 SE Green Street in Lee’s Summit, Mo. The public will have an opportunity to view project plans and exhibits and provide feedback. There...
Colbern Road Safety Improvement Work Begins September 5

Colbern Road Safety Improvement Work Begins September 5

Colbern Road Safety Improvement Work Begins September 5
The City of Lee’s Summit announced that work on the Colbern Road Improvements Project begins Sept. 5. The project will improve the safety and flow of traffic on Northwest Colbern Road between Northeast Douglas Street and Missouri Route 350 and will require that section of road to be closed to through traffic until spring 2025.   The first phase of construction will require a complete closure of Northwest Colbern Road from approximately Missouri Route...
NW Chipman Road Improvements Project Traffic Changes Set for Sept. 5

NW Chipman Road Improvements Project Traffic Changes Set for Sept. 5

NW Chipman Road Improvements Project Traffic Changes Set for Sept. 5

NW Ashurst Drive Connection Set to Open and NW Edgewood Drive Set to Close

Construction on the NW Chipman Road Improvements project is progressing and the new connection of NW Ashurst Drive to View High Drive is set to open on Tuesday, Sept. 5. After NW Ashurst Drive opens, NW Edgewood Drive will close until December 2023. Traffic typically using NW Edgewood Drive to NW Chipman Road will detour on NW Ashurst Drive to View High Drive.

 

Sections of NW Colbern Road and NW Blue Parkway Set to Close Sept. 5

Sections of NW Colbern Road and NW Blue Parkway Set to Close Sept. 5

Sections of NW Colbern Road and NW Blue Parkway Set to Close Sept. 5
A section of NW Colbern Road from approximately Missouri Route 350 to NE Douglas Street is set to close to through traffic on Tuesday, Sept. 5, and will remain closed until spring 2025, weather permitting. NW Blue Parkway from Interstate 470 to the roundabout at NW Colbern Road is also set to close to through traffic on Tuesday, Sept. 5, and will remain closed until spring 2024, weather permitting. The closures are necessary for construction as part of the Colbern...
First404244Last