REVISED MoDOT Update: Closures on MO 291 and U.S. 50 in Lee's Summit for bridge replacement operations Now - November 2026

The following information is shared from the Missouri Department of Transportation (MoDOT) and is related to the 291 North and US Route 50 Interchange project. https://www.modot.org/node/94913

Projects: Missouri Route 291 North and U.S. Route 50 Interchange Improvements in Jackson

JACKSON COUNTY – The Missouri Department of Transportation will conduct various closures and traffic modifications on Missouri Route 291 and U.S. MO 50 for bridge replacement operations. All work is weather permitting. See below for traffic modifications:

(Additional dates and modifications added)

Friday, Aug. 14 - Saturday Aug. 15 between 7:00am-3:00pm

  • Various lane closures on north and southbound MO 291 from SE Oldham to North of Bayberry.

Tuesday, Aug. 18 at 9:00am

  • Place traffic on the new Blue Parkway east and west of MO 291.

Tuesday, Aug. 18 at 12:00pm until Friday, Nov. 13 at 5:00pm

  • Close southbound MO 291 from Blue Parkway to the south side of U.S. 50. Motorists are encouraged to utilize Blue Parkway to Todd George.

Added: Wed., Aug. 19 7:00 p.m. until Thu., Aug. 20 6:00 a.m.

  • Close the right lane on WB U.S. 50 from west of Todd George to MO 291.

Added: Thu., Aug. 20 between 9:00 a.m. and 12:00 p.m.

  • Close the ramp from MO 291 to WB U.S. 50.

Added: Thu., Aug. 20 between 12:00 p.m. and 4:00 p.m.

  • Close the ramp from MO 291 to EB U.S. 50.

Added: Thu., Aug. 20 at 8:00 p.m. until Fri., Aug. 21 at 6:00 a.m.

  • Close the right lane on EB U.S. 50 from MO 291 south (Jefferson St) to MO 291 and close the EB off ramp to MO 291.

Fri., Sep. 11 at 10:00 a.m. until Fri., Nov. 13 at 5:00 p.m.

  • Close NB MO 291 from the south side of U.S. 50 to the north side of U.S. 50.

Fri., Sep. 11 at 3:00 p.m.

  • Open WB U.S. 50 to MO 291 (Right Turn Movement Only).

Fri., Sep. 11 between 8:00 p.m. and 10:00 p.m.

  • Close the right lane on WB U.S. 50 from west of Todd George to west of MO 291.
  • Close the left lane on EB U.S. 50 west of MO 291 to east of MO 291.

Fri., Sept. 11 at 10:00 p.m. until Mon., Sept. 14 at 6:00 a.m.

Bridge demo traffic modifications:

  • Close the left lane on WB U.S. 50 west of Todd George to the WB U.S. 50 off ramp. Traffic will be diverted to go up and over the ramp back to U.S. 50.
  • Close the left lane on EB U.S. 50 west of MO 291 to the MO 291 off ramp. Traffic will be diverted to go up and over the ramp back to U.S. 50.

This is part of a larger project at MO 291N and U.S. 50, which includes bridge replacement, road realignment, and ADA improvements from SE 7th Terrace to SE Oldham Parkway in Lee’s Summit with a completion date of January 2027. To learn more about the project visit: Missouri Route 291 North and U.S. Route 50 Interchange Improvements in Jackson | Missouri Department of Transportation

Motorists are reminded to slow down and pay attention while driving in work zones. Not all work zones look alike. Work zones can also be short-term, temporary lane closures to make quick repairs or remove debris form the roadway.

For more information about MoDOT news, projects or events, please visit our website at www.modot.org.kansascity. For instant updates, follow MoDOT_KC on X, or share posts and comments on our Facebook at www.facebook.com/MoDOT.KansasCity/. MoDOT Kansas City maintains more than 7,000 miles of state roadway in nine counties. Sign up online for workzone updates or call 888-ASK-MODOT.

Print

Latest News

City Crews Preparing for Winter Weather Season with Snow Dry Run Today, Wednesday, Nov. 5

City Crews Preparing for Winter Weather Season with Snow Dry Run Today, Wednesday, Nov. 5

The City of Lee’s Summit is holding a snow dry run from 7 a.m. to 3:30 p.m. today, Wednesday, Nov. 5, to allow crews to prepare for the upcoming 2025-2026 winter weather season. The annual snow dry run was scheduled in advance and is not in response to any forecast. The purpose of the snow dry run is to ensure all equipment and software are working properly and that drivers are familiar with snow routes, which is critical to the City’s snow and ice...
Section of Northeast Independence Avenue Set to Close Monday, November 3

Section of Northeast Independence Avenue Set to Close Monday, November 3

Section of Northeast Independence Avenue Set to Close Monday, November 3
Update 12/5/25: This section of Northeast Independence Avenue had reopened, but will close again on Tuesday and Wednesday (Dec. 9-10) of next week for pavement work. A section of Northeast Independence Avenue between Northeast Orchard and Southeast Second streets is set to close on Monday, November 3, for approximately five weeks (extended from three weeks). The hard closure is between Southeast Second Street and 209 NE Independence Avenue. The detour route...
Sections of Southeast Douglas and Southeast First Streets Set to Close Daily Beginning Monday, October 27

Sections of Southeast Douglas and Southeast First Streets Set to Close Daily Beginning Monday, October 27

Sections of Southeast Douglas and Southeast First Streets Set to Close Daily Beginning Monday, October 27

Sections of Southeast Douglas and Southeast First streets are set to close daily from 9 a.m. to 4 p.m. beginning Monday, October 27, for utility work at the intersection. Work is permitted through November 7. The hard closures are on the south side of the intersection in the southbound lane of Southeast Douglas Street, and in the eastbound lane of Southeast First Street on either side of its intersection with Southeast Douglas Street.

Utility Work Along Southeast Second Street

Utility Work Along Southeast Second Street

Utility Work Along Southeast Second Street
A utility contractor is completing work along the south side of Southeast Second Street between Southeast Main Street and the alley behind the City Hall parking garage which will require the closure of sidewalk and two alleys, and the closure of Southeast Douglas Street at Southeast Second Street. Work will take place daily from 9 a.m. to 4 p.m. and is permitted from now until November 26. As a condition of permit approval, operations along Southeast Second Street...
Section of Southeast Fourth Street Set to Close Monday, Oct. 27 (postponed from Oct. 23)

Section of Southeast Fourth Street Set to Close Monday, Oct. 27 (postponed from Oct. 23)

Section of Southeast Fourth Street Set to Close Monday, Oct. 27 (postponed from Oct. 23)

Update: Southeast Fourth Street is open to traffic as of 11/14/25.

A section of Southeast Fourth Street between Southeast Timbercreek Lane and Southeast Todd George Parkway is set to close on Monday, Oct. 27, until Monday, Nov. 17 (postponed and extended due to weather and utility conflicts from Monday, Oct. 23, through Monday, Nov. 3). The detour route includes Southeast Timbercreek Lane, Southeast Winburn Trail, and Southeast Todd George Parkway.

First121416Last