Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 829
  |   Categories: Public Works News

REVISED MoDOT Update: Closures on MO 291 and U.S. 50 in Lee's Summit for bridge replacement operations Now - November 2026

The following information is shared from the Missouri Department of Transportation (MoDOT) and is related to the 291 North and US Route 50 Interchange project. https://www.modot.org/node/94913

Projects: Missouri Route 291 North and U.S. Route 50 Interchange Improvements in Jackson

JACKSON COUNTY – The Missouri Department of Transportation will conduct various closures and traffic modifications on Missouri Route 291 and U.S. MO 50 for bridge replacement operations. All work is weather permitting. See below for traffic modifications:

(Additional dates and modifications added)

Friday, Aug. 14 - Saturday Aug. 15 between 7:00am-3:00pm

  • Various lane closures on north and southbound MO 291 from SE Oldham to North of Bayberry.

Tuesday, Aug. 18 at 9:00am

  • Place traffic on the new Blue Parkway east and west of MO 291.

Tuesday, Aug. 18 at 12:00pm until Friday, Nov. 13 at 5:00pm

  • Close southbound MO 291 from Blue Parkway to the south side of U.S. 50. Motorists are encouraged to utilize Blue Parkway to Todd George.

Added: Wed., Aug. 19 7:00 p.m. until Thu., Aug. 20 6:00 a.m.

  • Close the right lane on WB U.S. 50 from west of Todd George to MO 291.

Added: Thu., Aug. 20 between 9:00 a.m. and 12:00 p.m.

  • Close the ramp from MO 291 to WB U.S. 50.

Added: Thu., Aug. 20 between 12:00 p.m. and 4:00 p.m.

  • Close the ramp from MO 291 to EB U.S. 50.

Added: Thu., Aug. 20 at 8:00 p.m. until Fri., Aug. 21 at 6:00 a.m.

  • Close the right lane on EB U.S. 50 from MO 291 south (Jefferson St) to MO 291 and close the EB off ramp to MO 291.

Fri., Sep. 11 at 10:00 a.m. until Fri., Nov. 13 at 5:00 p.m.

  • Close NB MO 291 from the south side of U.S. 50 to the north side of U.S. 50.

Fri., Sep. 11 at 3:00 p.m.

  • Open WB U.S. 50 to MO 291 (Right Turn Movement Only).

Fri., Sep. 11 between 8:00 p.m. and 10:00 p.m.

  • Close the right lane on WB U.S. 50 from west of Todd George to west of MO 291.
  • Close the left lane on EB U.S. 50 west of MO 291 to east of MO 291.

Fri., Sept. 11 at 10:00 p.m. until Mon., Sept. 14 at 6:00 a.m.

Bridge demo traffic modifications:

  • Close the left lane on WB U.S. 50 west of Todd George to the WB U.S. 50 off ramp. Traffic will be diverted to go up and over the ramp back to U.S. 50.
  • Close the left lane on EB U.S. 50 west of MO 291 to the MO 291 off ramp. Traffic will be diverted to go up and over the ramp back to U.S. 50.

This is part of a larger project at MO 291N and U.S. 50, which includes bridge replacement, road realignment, and ADA improvements from SE 7th Terrace to SE Oldham Parkway in Lee’s Summit with a completion date of January 2027. To learn more about the project visit: Missouri Route 291 North and U.S. Route 50 Interchange Improvements in Jackson | Missouri Department of Transportation

Motorists are reminded to slow down and pay attention while driving in work zones. Not all work zones look alike. Work zones can also be short-term, temporary lane closures to make quick repairs or remove debris form the roadway.

For more information about MoDOT news, projects or events, please visit our website at www.modot.org.kansascity. For instant updates, follow MoDOT_KC on X, or share posts and comments on our Facebook at www.facebook.com/MoDOT.KansasCity/. MoDOT Kansas City maintains more than 7,000 miles of state roadway in nine counties. Sign up online for workzone updates or call 888-ASK-MODOT.

Print

Latest News

Southeast Eastridge and Southeast Wilson Streets Closed

Southeast Eastridge and Southeast Wilson Streets Closed

Southeast Eastridge and Southeast Wilson Streets Closed

Update 1/14/26: Southeast Eastridge and Southeast Wilson streets are now open.
Southeast Eastridge and Southeast Wilson streets are closed through the end of next week. Grand Avenue is back open.

Intersection of Southeast Third Street and Southeast Greystone Drive Set to Close Daily Beginning Dec. 10

Intersection of Southeast Third Street and Southeast Greystone Drive Set to Close Daily Beginning Dec. 10

Intersection of Southeast Third Street and Southeast Greystone Drive Set to Close Daily Beginning Dec. 10

The intersection of Southeast Third Street and Southeast Greystone Drive is set to close daily from 7 a.m. to 6 p.m. beginning Wednesday, December 10, and lasting until December 24. The detour route includes Southeast Todd George Parkway, Northeast Langsford Road, Southeast Keystone Drive, and Southeast Flagstone Drive. READ MORE -->

City Crews Completed Snow Operations

City Crews Completed Snow Operations

The City’s crews completed snow operations overnight. Temperatures above freezing will continue to help with additional melting throughout the day.

City Crews Set to Continue Plowing and Treating Residential Streets

City Crews Set to Continue Plowing and Treating Residential Streets

The City’s crews are set to continue plowing and treating residential streets tonight and overnight into tomorrow, Wednesday, Dec. 3. The sun and warmer temperatures today helped ice and snow to melt, and pavement temperatures should remain above freezing until after midnight; however, streets are expected to refreeze as temperatures drop overnight. Drivers should use caution during the Wednesday morning commute, especially on elevated surfaces such as bridges...
City Crews Plowing and Treating Residential Streets Today, Tuesday, Dec. 2

City Crews Plowing and Treating Residential Streets Today, Tuesday, Dec. 2

The City’s crews are plowing and treating residential streets today, Tuesday, Dec. 2. Overnight they completed secondary streets, and made another pass on primary streets due to refreezing and slickness. Crews will continue working on residential streets until all are plowed and treated. READ MORE -->

First101214Last