Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 3839
  |   Categories: Public Works News

Community Notification: Flood Hazard Revisions Along Cedar Creek

The City of Lee’s Summit, Missouri, Public Works Department in accordance with National Flood Insurance Program regulation 65.7(b)(1), hereby gives notice of the City of Lee’s Summit’s intent to revise the flood hazard information, generally located upstream and downstream of SW Ward Road along Cedar Creek. The flood hazard revisions are being proposed as part of Letter of Map Revision (LOMR, Case No. 22-07-0797P) for a completed construction project along Cedar Creek. The City of Lee’s Summit has constructed improvements that replaced the culverts at the stream’s crossing with SW Ward Road.

Specifically, the floodway shall be revised from a point approximately 1,000 feet downstream of SW Ward Road to a point approximately 1,500 feet upstream of SW Ward Road along Cedar Creek. As a result, the floodway widths shall narrow or remain unchanged within the area of revision. In addition, the Base Flood Elevations (1% annual chance water-surface elevations) will increase and decrease. Base Flood Elevations will increase a maximum of 0.3 feet at a point approximately 1,000 feet downstream of Ward Road.  The Special Flood Hazard Area (1% annual chance floodplain) will widen and narrow along Cedar Creek within the area of revision.

Maps and a detailed analysis of the proposed flood hazard revisions can be reviewed at Lee’s Summit City Hall, Public Works Department at 220 SE Green Street, Lee’s Summit, MO 64063. If you have any questions or concerns about the proposed project or its effect on your property, you may contact Karen Quackenbush of the City of Lee’s Summit at 816-969-1800 or PublicWorks@cityofls.net from 11/14/2022 to 12/14/2022.

Print

Latest News

City Crews Set to Continue Plowing and Treating Residential Streets Today, Thursday, February 20

City Crews Set to Continue Plowing and Treating Residential Streets Today, Thursday, February 20

The City’s crews are set to continue plowing and treating residential streets today, Thursday, February 20.

The sun should help with some melting today; however, extremely cold temperatures continue to limit the effectiveness of salt and snow remains packed to pavements even after being plowed and treated. Sunshine and warmer temperatures over the weekend will help with additional melting. 

City Crews Set to Continue Plowing and Treating Residential Streets

City Crews Set to Continue Plowing and Treating Residential Streets

The City's crews are set to continue plowing and treating residential streets tonight and overnight into tomorrow, Thursday, February 20. Crews completed primary and secondary streets earlier today. While the sun helped with some melting today, extremely cold temperatures continue to limit the effectiveness of salt and snow remains packed to pavements even after being plowed and treated. Sunshine and warmer temperatures over the weekend will help with...
City Crews Plowing and Treating Streets Today, Wednesday, February 19

City Crews Plowing and Treating Streets Today, Wednesday, February 19

The City’s crews are plowing and treating streets today, Wednesday, February 19. Crews completed primary streets, are finishing up secondary streets, and will be moving into residential streets later this morning. Extremely cold temperatures are limiting the effectiveness of salt treatments, and streets will remain packed with snow even after being plowed and treated.

Public Invited to Comment on Ward Road Improvements from O’Brien to Chipman Roads

Public Invited to Comment on Ward Road Improvements from O’Brien to Chipman Roads

The City of Lee’s Summit is hosting a public meeting from 4:30 p.m. to 6:30 p.m. on Thursday, Feb. 27, in the Strother Conference Room at City Hall, 220 SE Green St. Lee’s Summit, Mo., to discuss infrastructure improvements for the Ward Road corridor from O’Brien to Chipman roads. The meeting will allow the public to view preliminary plans and exhibits, review tentative schedules for right-of-way acquisition and construction, and provide feedback.
First91113Last