Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 3839
  |   Categories: Public Works News

Community Notification: Flood Hazard Revisions Along Cedar Creek

The City of Lee’s Summit, Missouri, Public Works Department in accordance with National Flood Insurance Program regulation 65.7(b)(1), hereby gives notice of the City of Lee’s Summit’s intent to revise the flood hazard information, generally located upstream and downstream of SW Ward Road along Cedar Creek. The flood hazard revisions are being proposed as part of Letter of Map Revision (LOMR, Case No. 22-07-0797P) for a completed construction project along Cedar Creek. The City of Lee’s Summit has constructed improvements that replaced the culverts at the stream’s crossing with SW Ward Road.

Specifically, the floodway shall be revised from a point approximately 1,000 feet downstream of SW Ward Road to a point approximately 1,500 feet upstream of SW Ward Road along Cedar Creek. As a result, the floodway widths shall narrow or remain unchanged within the area of revision. In addition, the Base Flood Elevations (1% annual chance water-surface elevations) will increase and decrease. Base Flood Elevations will increase a maximum of 0.3 feet at a point approximately 1,000 feet downstream of Ward Road.  The Special Flood Hazard Area (1% annual chance floodplain) will widen and narrow along Cedar Creek within the area of revision.

Maps and a detailed analysis of the proposed flood hazard revisions can be reviewed at Lee’s Summit City Hall, Public Works Department at 220 SE Green Street, Lee’s Summit, MO 64063. If you have any questions or concerns about the proposed project or its effect on your property, you may contact Karen Quackenbush of the City of Lee’s Summit at 816-969-1800 or PublicWorks@cityofls.net from 11/14/2022 to 12/14/2022.

Print

Latest News

Public Invited to Comment on Scherer Road/Parkway Alignment

Public Invited to Comment on Scherer Road/Parkway Alignment

The City of Lee’s Summit is hosting a public meeting from 5 to 7 p.m. on Wednesday, March 19, in the Media Center Room A138 at Hawthorn Hill Elementary School, 2801 SW Pryor Road, Lee’s Summit, MO 64082, to discuss the Alignment Study of Scherer Road/Parkway. The meeting will allow the public to view conceptual exhibits, ask questions, provide feedback, and gain insights into the timeline, scope, and impact on the community. The meeting is an open house...
City Crews Completed Snow Operations Today, Wednesday, March 5

City Crews Completed Snow Operations Today, Wednesday, March 5

The City’s crews completed snow operations at 3:30 p.m. today, Wednesday, March 5. Crews treated primary and secondary streets today until warming pavement temperatures and sunshine melted ice and snow from streets.

City Crews Treating Primary Streets this Morning

City Crews Treating Primary Streets this Morning

The City’s crews are treating primary streets this morning, Wednesday, March 5. Streets were slushy overnight but froze quickly earlier this morning. Crews will move into secondary streets if necessary, and will continue treating streets until pavement temperatures rise above freezing and melting occurs. Drivers should use caution especially on elevated surfaces such as bridges and overpasses.

 

City Crews Preparing for Possible Blizzard Conditions Overnight

City Crews Preparing for Possible Blizzard Conditions Overnight

The City's crews are scheduled to report at 10 p.m. tonight, Tuesday, March 4, to treat primary and secondary streets. Blizzard conditions are possible overnight due to the forecast for heavy snow and high winds. Snow accumulations should remain low as pavement temperatures are expected to remain above freezing until approximately 3 a.m., but streets will become slick. 
READ MORE -->

 

City Crews Completed Plowing and Treating Residential Streets Today, Thursday, February 20

City Crews Completed Plowing and Treating Residential Streets Today, Thursday, February 20

The City’s crews completed plowing and treating residential streets this afternoon, Thursday, February 20. The sun helped with some melting today, but refreezing is likely overnight into tomorrow, Friday, February 21. Cold temperatures continue to limit the effectiveness of salt and snow remains packed to pavements even after being plowed and treated. Sunshine and warmer temperatures over the weekend will help with additional melting.  

First81012Last