Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 2313
  |   Categories: Public Works News

Community Notification: Flood Hazard Revisions Along Cedar Creek

The City of Lee’s Summit, Missouri, Public Works Department in accordance with National Flood Insurance Program regulation 65.7(b)(1), hereby gives notice of the City of Lee’s Summit’s intent to revise the flood hazard information, generally located upstream and downstream of SW Ward Road along Cedar Creek. The flood hazard revisions are being proposed as part of Letter of Map Revision (LOMR, Case No. 22-07-0797P) for a completed construction project along Cedar Creek. The City of Lee’s Summit has constructed improvements that replaced the culverts at the stream’s crossing with SW Ward Road.

Specifically, the floodway shall be revised from a point approximately 1,000 feet downstream of SW Ward Road to a point approximately 1,500 feet upstream of SW Ward Road along Cedar Creek. As a result, the floodway widths shall narrow or remain unchanged within the area of revision. In addition, the Base Flood Elevations (1% annual chance water-surface elevations) will increase and decrease. Base Flood Elevations will increase a maximum of 0.3 feet at a point approximately 1,000 feet downstream of Ward Road.  The Special Flood Hazard Area (1% annual chance floodplain) will widen and narrow along Cedar Creek within the area of revision.

Maps and a detailed analysis of the proposed flood hazard revisions can be reviewed at Lee’s Summit City Hall, Public Works Department at 220 SE Green Street, Lee’s Summit, MO 64063. If you have any questions or concerns about the proposed project or its effect on your property, you may contact Karen Quackenbush of the City of Lee’s Summit at 816-969-1800 or PublicWorks@cityofls.net from 11/14/2022 to 12/14/2022.

Print

Latest News

City Crews Completed Snow Operations Today, Sun., Nov. 26

City Crews Completed Snow Operations Today, Sun., Nov. 26

The City’s crews completed snow operations mid-morning today, Sunday, Nov. 26. Crews worked overnight into mid-morning treating primary and secondary streets with salt. Melting due to warming pavement temperatures and sun will continue throughout the day. Drivers should watch for areas of refreezing overnight and especially during the Monday morning commute.

City Crews Treating Streets Tonight, Nov. 25

City Crews Treating Streets Tonight, Nov. 25

The City has a small crew working tonight treating primary and secondary streets. Temperatures will hover around freezing which may cause slick conditions. Drivers should use caution, especially on elevated surfaces such as bridges and overpasses. The City will continue to monitor the weather forecast and will update its response as needed.

Section of NW Ward Road Closed

Section of NW Ward Road Closed

Section of NW Ward Road Closed

As of 12/21/23, this section of NW Ward Road is now open.

The southbound section of NW Ward Road between NW Donovan Road and NW Chipman Road is closed until approximately Dec. 1, weather permitting. The southbound detour is NW Donovan Road. The closure is for the addition of turn lanes and other improvements. This is development-related construction work by a private contractor.

Public Meeting for Ward Road Improvements from Blue Parkway to O’Brien Road Set for Dec. 14

Public Meeting for Ward Road Improvements from Blue Parkway to O’Brien Road Set for Dec. 14

Online Public Meeting Also Offered Dec. 14 Through Jan. 14

The City of Lee’s Summit will host an in-person public meeting to discuss the design for the Ward Road Improvements project from Blue Parkway to O’Brien Road from 4:30 – 6:30 p.m. on Thursday, Dec. 14, 2023, in the Strother Conference Room at Lee’s Summit City Hall, 220 SE Green Street Lee’s Summit, Mo. The meeting will be an open house-style format and there will not be a formal presentation; the public can come and go as schedules...
Section of SW 3rd Street Set to Close Mon., Nov. 27

Section of SW 3rd Street Set to Close Mon., Nov. 27

Section of SW 3rd Street Set to Close Mon., Nov. 27
Update: As of 12/21/23, 3rd Street is now open to through traffic. Construction work will be be ongoing over the next several months that will require the contractor to have a single lane drop on westbound 3rd Street (just east of Murray) during working hours, but a minimum of one lane of traffic will be kept open at all times.  No further complete closures are anticipated. A section of SW 3rd Street from SW Pryor Road to SW Ward Road is set to close to...
First81012Last