Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 859
  |   Categories: Public Works News

REVISED MoDOT Update: Closures on MO 291 and U.S. 50 in Lee's Summit for bridge replacement operations Now - November 2026

The following information is shared from the Missouri Department of Transportation (MoDOT) and is related to the 291 North and US Route 50 Interchange project. https://www.modot.org/node/94913

Projects: Missouri Route 291 North and U.S. Route 50 Interchange Improvements in Jackson

JACKSON COUNTY – The Missouri Department of Transportation will conduct various closures and traffic modifications on Missouri Route 291 and U.S. MO 50 for bridge replacement operations. All work is weather permitting. See below for traffic modifications:

(Additional dates and modifications added)

Friday, Aug. 14 - Saturday Aug. 15 between 7:00am-3:00pm

  • Various lane closures on north and southbound MO 291 from SE Oldham to North of Bayberry.

Tuesday, Aug. 18 at 9:00am

  • Place traffic on the new Blue Parkway east and west of MO 291.

Tuesday, Aug. 18 at 12:00pm until Friday, Nov. 13 at 5:00pm

  • Close southbound MO 291 from Blue Parkway to the south side of U.S. 50. Motorists are encouraged to utilize Blue Parkway to Todd George.

Added: Wed., Aug. 19 7:00 p.m. until Thu., Aug. 20 6:00 a.m.

  • Close the right lane on WB U.S. 50 from west of Todd George to MO 291.

Added: Thu., Aug. 20 between 9:00 a.m. and 12:00 p.m.

  • Close the ramp from MO 291 to WB U.S. 50.

Added: Thu., Aug. 20 between 12:00 p.m. and 4:00 p.m.

  • Close the ramp from MO 291 to EB U.S. 50.

Added: Thu., Aug. 20 at 8:00 p.m. until Fri., Aug. 21 at 6:00 a.m.

  • Close the right lane on EB U.S. 50 from MO 291 south (Jefferson St) to MO 291 and close the EB off ramp to MO 291.

Fri., Sep. 11 at 10:00 a.m. until Fri., Nov. 13 at 5:00 p.m.

  • Close NB MO 291 from the south side of U.S. 50 to the north side of U.S. 50.

Fri., Sep. 11 at 3:00 p.m.

  • Open WB U.S. 50 to MO 291 (Right Turn Movement Only).

Fri., Sep. 11 between 8:00 p.m. and 10:00 p.m.

  • Close the right lane on WB U.S. 50 from west of Todd George to west of MO 291.
  • Close the left lane on EB U.S. 50 west of MO 291 to east of MO 291.

Fri., Sept. 11 at 10:00 p.m. until Mon., Sept. 14 at 6:00 a.m.

Bridge demo traffic modifications:

  • Close the left lane on WB U.S. 50 west of Todd George to the WB U.S. 50 off ramp. Traffic will be diverted to go up and over the ramp back to U.S. 50.
  • Close the left lane on EB U.S. 50 west of MO 291 to the MO 291 off ramp. Traffic will be diverted to go up and over the ramp back to U.S. 50.

This is part of a larger project at MO 291N and U.S. 50, which includes bridge replacement, road realignment, and ADA improvements from SE 7th Terrace to SE Oldham Parkway in Lee’s Summit with a completion date of January 2027. To learn more about the project visit: Missouri Route 291 North and U.S. Route 50 Interchange Improvements in Jackson | Missouri Department of Transportation

Motorists are reminded to slow down and pay attention while driving in work zones. Not all work zones look alike. Work zones can also be short-term, temporary lane closures to make quick repairs or remove debris form the roadway.

For more information about MoDOT news, projects or events, please visit our website at www.modot.org.kansascity. For instant updates, follow MoDOT_KC on X, or share posts and comments on our Facebook at www.facebook.com/MoDOT.KansasCity/. MoDOT Kansas City maintains more than 7,000 miles of state roadway in nine counties. Sign up online for workzone updates or call 888-ASK-MODOT.

Print

Latest News

City Crews Set to Continue Plowing Overnight into Monday, Jan. 6

City Crews Set to Continue Plowing Overnight into Monday, Jan. 6

The City’s crews are continuing to plow primary streets tonight, and will continue overnight into Monday, Jan. 6. Conditions are hazardous, and high snowfall rates and winds have been covering streets that have already been plowed. After midnight, the snow and wind will decrease and crews expect to begin plowing and treating all streets. Crews should be working in secondary and residential streets tomorrow, and are scheduled to continue READ MORE...
City Crews Plowing Streets Today, Sunday, Jan. 5

City Crews Plowing Streets Today, Sunday, Jan. 5

The City’s crews are plowing primary streets today, Sunday, Jan. 5. Snowfall rates are high and streets are covered quickly after snow and ice is bladed off, and high winds are creating blizzard conditions. Any travel will be hazardous and drivers are urged to stay home if possible. Crews will likely need to continue working on primary streets into early Monday morning before they are able to start in secondary and residential streets. Snow is expected to...
City Crews Continue Treating Streets

City Crews Continue Treating Streets

The City’s crews pre-treated streets, and will continue treating primary and secondary streets tonight, Saturday, Jan. 4, and overnight into Sunday, Jan. 5. Even streets that have been treated are slick. Drivers are urged to stay home if possible; if travel is necessary, use caution and give crews plenty of room to work. Snow is expected to start early Sunday morning, and crews will plow and treat streets as necessary. The City will continue to monitor the...
City Crews Preparing for Winter Storm

City Crews Preparing for Winter Storm

The City’s crews are preparing for a major winter storm which is expected to start on Saturday, Jan. 4, and will continue overnight into Sunday, Jan. 5. Ice, sleet, heavy snow, high winds, and low temperatures are all expected with this storm. Crews pre-treated secondary and residential streets with salt today, Friday, Jan. 3, and will report at noon on Saturday, Jan. 4, to pre-treat primary streets. Ice and sleet are expected to start on Saturday...
Green Street Project Update: SE Green Street Entrance into City Hall Now Open

Green Street Project Update: SE Green Street Entrance into City Hall Now Open

The Southeast Green Street entrance into the Lee’s Summit City Hall parking lot and garage is now open.

Work on the Green Street project continues, and Southeast Third Street between Southeast Douglas Street and Southeast Grand Avenue remains closed to thru traffic.

Updates to estimated reopening dates are as follows:

READ MORE -->

First283032Last