Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 918
  |   Categories: Public Works News

Public Invited to Southeast Douglas Street Improvements Public Meeting

The City of Lee’s Summit is hosting a public meeting to discuss the proposed design and infrastructure improvements to the Southeast Douglas Street corridor from Blue Parkway to Fourth Street from 5-7 p.m. on Thursday, July 10, 2025, in the Strother Conference Room at City Hall, 220 SE Green St., Lee’s Summit, Mo. 64063.

The meeting is an open house-style format and there will be no formal presentation, allowing those interested to come and go as schedules allow. This meeting will be attended by City staff and representatives from the project’s engineering design consultant Wilson & Company. Project exhibits will be available for public inspection at the meeting and online at https://cityofls.net/douglas-project. Comments will also be accepted online from July 10-24, and will be made a part of the public meeting record for the project.

Proposed project improvements include: roadway reconstruction with curb and gutter; share the road bicycle facilities; on street parking (one side); continuous sidewalks along each side of the roadway; continuous street lighting; new enclosed storm drainage system; new waterline infrastructure; and associated utility relocations. This transportation project was approved by voters with the passage of the Aprill 2023 no-tax-increase general obligation bond questions to fund critical improvements to Lee’s Summit’s infrastructure and quality of life. 

For more information, contact the Public Works Department at publicworks@cityofls.net or 816.969.1800.

Print

Latest News

City Crews Prepared for Snow This Weekend

City Crews Prepared for Snow This Weekend

The City’s crews prepared trucks and equipment due to light snow forecast for tonight, Friday, Jan. 5, and tomorrow, Saturday, Jan. 6. Pavement temperatures are expected to remain at or above freezing which should melt any snow on pavements; however, snow may become heavy at times and could overwhelm pavements. The City will continue to monitor the weather and will call out crews as needed for response. The City’s crews are also preparing for snow...
Section of NW Quarry Park Road Closed

Section of NW Quarry Park Road Closed

Section of NW Quarry Park Road Closed

A section of NW Quarry Park Road west of NW Pryor Road is closed to through traffic for an emergency road repair. The duration of the closure is unknown at this time. Access for emergency vehicles and residents will be provided on NW Valley Garden Drive/Clifford Road and Bannister Road.

City Crews Preparing for Snow Dec. 26-27

City Crews Preparing for Snow Dec. 26-27

The City has a small crew scheduled to report at 2 a.m. Wed., Dec. 27, to monitor conditions and treat streets with salt as needed due to the potential for snow. Temperatures overnight will hover around freezing which may cause slick conditions. Drivers should use caution during the Wednesday morning commute, especially on elevated surfaces such as bridges and overpasses. Snow is also expected today, Tues., Dec. 26, and may be heavy at times; however, pavement...
Joint Public Meeting for Douglas Street Improvements and Olive & Orchard Street and Stormwater Improvements Set for Jan. 18

Joint Public Meeting for Douglas Street Improvements and Olive & Orchard Street and Stormwater Improvements Set for Jan. 18

The City of Lee’s Summit will host an in-person public meeting to discuss the design of both the Douglas Street Improvements project and the Olive & Orchard Street and Stormwater Improvements from 4-6 p.m. on Thursday, Jan. 18, 2024, in the Council Chambers at Lee’s Summit City Hall, 220 SE Green St., Lee’s Summit, Mo. The meeting will be an open house-style format and there will not be a formal presentation; the public can come and go as...
Intersection of SE Wilson & SE Eastridge Closed

Intersection of SE Wilson & SE Eastridge Closed

Intersection of SE Wilson & SE Eastridge Closed
Update: This intersection is expected to remain closed through the end of February, weather permitting. The intersection of SE Wilson and SE Eastridge streets is closed until approximately Jan. 18, 2024, so a contractor can replace stormwater infrastructure as part of the Downtown Market Plaza project. The detour route for SE Eastridge Street is SE 2nd Street, SE Johnson Street and SE 1st Street. The detour route for SE Wilson Street is SE Grand Avenue, SE...
First283032Last