Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 3673

Legacy Lake Dredging Project

Legacy Lake Dredging Project

 

Lee’s Summit Parks and Recreation is undertaking a major restoration effort at Legacy Lake to protect one of the community’s most important environmental and recreational assets. The Legacy Lake Dredging Project began in November 2025 and is scheduled for completion in May 2026.

Why Legacy Lake Matters

Legacy Lake is a vital resource within Legacy Park, serving both the community and the environment. The 28-acre lake provides essential habitat for a wide variety of wildlife, including fish, turtles, snakes, and migratory birds that rely on the lake as a stopping point during seasonal migrations. It also offers popular recreational opportunities, including fishing, paddleboarding, canoeing, and kayaking.

Beyond recreation, Legacy Lake plays a critical operational role. The lake supplies irrigation water for all sports fields and the amphitheater turf within Legacy Park and serves as a fire-suppression resource for park facilities. The park was intentionally designed so that stormwater runoff from the park and surrounding areas flows back into the lake, creating a self-sustaining system with a total watershed of 2.66 square miles.

Since 2014, the lake has provided approximately 44.6 million gallons of irrigation water annually at no cost, resulting in an estimated $370,000 in yearly savings. Over the lake’s 23-year lifespan, this has amounted to more than $8 million in total savings for the department.

The Need for Dredging

In 2019, an engineering survey revealed that approximately 50,000 cubic yards of sediment had accumulated on the lake bottom. This sediment buildup reduced the lake’s average depth by at least three feet and decreased its water capacity by approximately 30 percent.

The reduced water volume has significantly impacted irrigation operations, requiring Lee’s Summit Parks and Recreation to implement a “drought irrigation plan” for the past three years. While minimum water levels for fire suppression have been maintained, they remain at risk. In addition, the sediment buildup has negatively affected the lake’s ecological health. Shallower water allows invasive aquatic plants to establish, altering oxygen levels and contributing to algae growth along the shoreline.

The only long-term solution to restore the lake’s depth, capacity, and overall health is dredging.

Engineering and Project Planning

To address the issue, LSPR partnered with HDR, an engineering firm, to complete a Preliminary Engineering Report evaluating dredging options and costs. HDR recommended the use of a hydraulic dredge, which removes sediment while maintaining lake water levels and pumps the material to a settling pond.

HDR completed a bathymetric survey to determine the amount of sediment that must be removed to restore the lake to its original depth. Additional topographic and geotechnical surveys were conducted at the proposed settling pond site east of the amphitheater, including soil borings to a depth of 12–15 feet. No rock or subsurface conditions were identified that would hinder construction, and environmental reviews confirmed that the project would have no impact on bat habitats. The budget determined for this project is $1.8 million.

Dredging Process and Timeline

The Legacy Lake dredging project is being completed in several phases:

  • Development and construction of the sediment settling pond

  • Installation of silt transfer and water return pipes

  • Dredging of the lake

  • Removal of transfer piping

  • Sediment dehydration period

  • Rough grading of the disposal area

  • Final grading and seeding

Long-Term Benefits

Dredging Legacy Lake will restore its original depth and water capacity, improving irrigation reliability, protecting fire suppression reserves, and enhancing overall water quality. The project will also improve habitat conditions for aquatic life and reduce algae growth, helping ensure the lake remains a healthy, attractive, and functional centerpiece of Legacy Park.

Lee’s Summit Parks and Recreation is committed to the long-term stewardship of Legacy Lake. This investment will ensure the lake continues to serve the community, the environment, and park operations for decades to come.

Print

Latest News

City Crews Preparing for Potential Freezing Rain Tonight

City Crews Preparing for Potential Freezing Rain Tonight

The City's crews are preparing for potential freezing rain tonight, Saturday, Jan. 11, and overnight into Sunday, Jan. 12. Crews have been working throughout today to finish a second round of residential streets as well as additional clean-up, and are expected to continue working overnight into tomorrow; however, they will return to treating primary streets as necessary if freezing rain occurs. While there is salt on streets from the past week, streets...
City Crews Continue Second Round of Plowing and Treating Residential Streets

City Crews Continue Second Round of Plowing and Treating Residential Streets

The City’s crews are continuing a second round of plowing and treating residential streets today, Friday, January 10, and will be plowing and treating primary streets again as needed due to the additional snow overnight. Sunshine, salt and traffic has broken up the snow and ice pack after the first round of plowing and treating, and there are slushy conditions on many residential streets. This second round of plowing and treating will attempt to clean up the...
City Crews Continue to Plow and Treat Streets

City Crews Continue to Plow and Treat Streets

The City’s crews have been working for several days to dig out after one of the largest snow storms on record. Crews were completing residential streets this morning, and are working to widen lanes and turn lanes on primary and secondary streets. Due to the amount of snow and cold temperatures, crews will begin working through residential streets for a second time to attempt to clean up snow left behind after streets were plowed and treated. With more snow in...
City Crews Set to Continue Plowing and Treating Residential Streets

City Crews Set to Continue Plowing and Treating Residential Streets

The City's crews are set to continue plowing and treating residential streets today, Wednesday, Jan. 8, and overnight into Thursday, Jan. 9. Crews are 47% complete with residential streets, and 71% complete overall. Snow and ice will remain packed to pavements due to cold temperatures, but sunshine should help with melting. Crews are expected to continue working on clean up on Friday, Jan. 10.

City Crews Set to Continue Plowing and Treating Residential Streets Overnight into Wednesday, Jan. 8

City Crews Set to Continue Plowing and Treating Residential Streets Overnight into Wednesday, Jan. 8

The City’s crews plowed and treated residential streets today, Tuesday, Jan. 7, and are set to continue plowing and treating residential streets overnight into Wednesday, Jan. 8. Crews are 21% complete with residential streets, and 56% complete overall.  Parked vehicles on streets are slowing progress. Residents can help the snow control process by moving vehicles and other obstructions from streets.  

First222426Last