Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 2319
  |   Categories: Public Works News

Community Notification: Flood Hazard Revisions Along Cedar Creek

The City of Lee’s Summit, Missouri, Public Works Department in accordance with National Flood Insurance Program regulation 65.7(b)(1), hereby gives notice of the City of Lee’s Summit’s intent to revise the flood hazard information, generally located upstream and downstream of SW Ward Road along Cedar Creek. The flood hazard revisions are being proposed as part of Letter of Map Revision (LOMR, Case No. 22-07-0797P) for a completed construction project along Cedar Creek. The City of Lee’s Summit has constructed improvements that replaced the culverts at the stream’s crossing with SW Ward Road.

Specifically, the floodway shall be revised from a point approximately 1,000 feet downstream of SW Ward Road to a point approximately 1,500 feet upstream of SW Ward Road along Cedar Creek. As a result, the floodway widths shall narrow or remain unchanged within the area of revision. In addition, the Base Flood Elevations (1% annual chance water-surface elevations) will increase and decrease. Base Flood Elevations will increase a maximum of 0.3 feet at a point approximately 1,000 feet downstream of Ward Road.  The Special Flood Hazard Area (1% annual chance floodplain) will widen and narrow along Cedar Creek within the area of revision.

Maps and a detailed analysis of the proposed flood hazard revisions can be reviewed at Lee’s Summit City Hall, Public Works Department at 220 SE Green Street, Lee’s Summit, MO 64063. If you have any questions or concerns about the proposed project or its effect on your property, you may contact Karen Quackenbush of the City of Lee’s Summit at 816-969-1800 or PublicWorks@cityofls.net from 11/14/2022 to 12/14/2022.

Print

Latest News

City Crews Plowing and Treating Streets Today, Thurs., March 10

City Crews Plowing and Treating Streets Today, Thurs., March 10

The City’s crews are plowing and treating primary and secondary streets today, Thurs., March 10, as snow falls. Two rounds of snow are expected, with the first round ending this afternoon and the second round starting this evening and ending early Friday, March 11. The Lee’s Summit area is still expected to receive 4-8 inches of snow. Depending on the total snow accumulations, it may take crews 32.5-40 hours to plow and treat all streets after the snow...
City Crews Preparing for Winter Storm

City Crews Preparing for Winter Storm

The City’s crews are preparing for another winter storm set to begin late tonight, Wed., March 9. Crews began applying salt brine to primary streets on Tuesday. Pretreatment with salt brine and rock salt continues today on residential streets, and the remainder of primary and secondary streets. Crews are set to report at 11 p.m. tonight to plow and treat streets as needed, and are scheduled around the clock through Saturday, March 12. Dry snow accumulations...
City Crew Reporting at Midnight to Treat Streets as Needed

City Crew Reporting at Midnight to Treat Streets as Needed

The City has a crew reporting at midnight to monitor the weather and treat streets with salt as needed overnight into Monday, March 7. There is a chance rain will change over to sleet and then snow. While temperatures will likely keep accumulations low, streets may be slick overnight and during the Monday morning commute. Residents should use caution while driving, especially on elevated surfaces such as bridges and overpasses. The City will continue to monitor...
Crews Completed Treating Streets Today, Thurs., Feb. 24

Crews Completed Treating Streets Today, Thurs., Feb. 24

The City’s crews treated primary and secondary streets from 7 a.m. – 3:30 p.m. today, Thurs., Feb. 24, as light snow fell in the area. Crews have completed operations for the day. Flurries are expected to continue into the evening, but it should not impact travel.

City Crews Preparing for Snow Thursday, Feb. 24

City Crews Preparing for Snow Thursday, Feb. 24

The City’s crews are preparing for another round of snow on Thurs., Feb. 24. Crews began pretreatment of residential streets this morning, and will work until 3:30 p.m. today, Wed., Feb. 23. Crews will begin 12 hour shifts at 7 a.m. on Thursday morning to treat and/or plow streets as needed depending on total snow accumulations. Snow is expected to start mid- to late-morning on Thursday and continue into the evening. Crews will focus on primary and secondary...
First182022Last