Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 2324
  |   Categories: Public Works News

Community Notification: Flood Hazard Revisions Along Cedar Creek

The City of Lee’s Summit, Missouri, Public Works Department in accordance with National Flood Insurance Program regulation 65.7(b)(1), hereby gives notice of the City of Lee’s Summit’s intent to revise the flood hazard information, generally located upstream and downstream of SW Ward Road along Cedar Creek. The flood hazard revisions are being proposed as part of Letter of Map Revision (LOMR, Case No. 22-07-0797P) for a completed construction project along Cedar Creek. The City of Lee’s Summit has constructed improvements that replaced the culverts at the stream’s crossing with SW Ward Road.

Specifically, the floodway shall be revised from a point approximately 1,000 feet downstream of SW Ward Road to a point approximately 1,500 feet upstream of SW Ward Road along Cedar Creek. As a result, the floodway widths shall narrow or remain unchanged within the area of revision. In addition, the Base Flood Elevations (1% annual chance water-surface elevations) will increase and decrease. Base Flood Elevations will increase a maximum of 0.3 feet at a point approximately 1,000 feet downstream of Ward Road.  The Special Flood Hazard Area (1% annual chance floodplain) will widen and narrow along Cedar Creek within the area of revision.

Maps and a detailed analysis of the proposed flood hazard revisions can be reviewed at Lee’s Summit City Hall, Public Works Department at 220 SE Green Street, Lee’s Summit, MO 64063. If you have any questions or concerns about the proposed project or its effect on your property, you may contact Karen Quackenbush of the City of Lee’s Summit at 816-969-1800 or PublicWorks@cityofls.net from 11/14/2022 to 12/14/2022.

Print

Latest News

City Crews Preparing for Snow on Mon., Dec. 19

City Crews Preparing for Snow on Mon., Dec. 19

The City's crews are preparing for snow to begin around 6 a.m. on Mon., Dec. 19. Crews are expected to report at 9 p.m. tonight, Sun., Dec. 18, to begin pre-treatment with salt, and treatment will continue throughout the event as needed. Temperatures are expected to be below freezing when the snow starts, and the Monday morning commute may be slick. Residents are encouraged to use caution while driving especially on elevated surfaces such as...
City Crews Preparing for Snow Mon., Nov. 14, and Overnight Into Tues., Nov. 15

City Crews Preparing for Snow Mon., Nov. 14, and Overnight Into Tues., Nov. 15

The City’s crews are preparing equipment and pre-treating hot spot areas such as major intersections and bridges with rock salt today, Mon. Nov. 14, in anticipation of snow later tonight and overnight into Tues., Nov. 15. Crews are currently on standby and will be called in as necessary overnight based on the forecast and conditions. Precipitation is expected to start as light rain changing over to snow. Pavement temperatures will hover around freezing, and...
City Crews Preparing for Winter Weather Season

City Crews Preparing for Winter Weather Season

The City of Lee’s Summit will hold a snow dry run from 7 a.m. to 3:30 p.m. today, Wed., Nov. 9, to allow crews to prepare for the upcoming 2022-2023 winter weather season. City crews will be testing equipment and software, and driving snow routes with plows and salt spreaders installed on trucks. The purpose of the dry run is to ensure all equipment and software is working properly and that drivers are familiar with snow routes, which is critical to the...
Section of SW Murray Road Set to Close Nov. 14

Section of SW Murray Road Set to Close Nov. 14

Section of SW Murray Road Set to Close Nov. 14
A section of SW Murray Road near SW 1st Street is set to close on Monday, Nov. 14, and will remain closed until the evening of Friday, Nov. 18, weather permitting. The road closure is necessary to perform water main replacement work as part of the FY22 Water Main Rehabilitation project. The detour route is SW 3rd Street and Oldham Parkway.  The FY22 Water Main Rehabilitation project helps with continued efforts to maintain and strengthen the water...
Curb Replacement on Section of NW Chipman Road

Curb Replacement on Section of NW Chipman Road

Preparations began this week for curb replacement on a section of NW Chipman Road from U.S. Route 50 to the railroad bridge just east of NW Donovan Road. Curb removal is expected to start on Mon., Nov. 7, with pours and restoration to follow as well as sidewalk ramp replacement in several locations. The work is expected to take approximately three weeks, weather permitting. While there will be lane closures during this work, both eastbound and westbound NW Chipman...
First141618Last