Search Press Releases

Press Release Archive

Press Releases

  |   Views: 1006
  |   Categories: Public Works News

REVISED MoDOT Update: Closures on MO 291 and U.S. 50 in Lee's Summit for bridge replacement operations Now - November 2026

The following information is shared from the Missouri Department of Transportation (MoDOT) and is related to the 291 North and US Route 50 Interchange project. https://www.modot.org/node/94913

Projects: Missouri Route 291 North and U.S. Route 50 Interchange Improvements in Jackson

JACKSON COUNTY – The Missouri Department of Transportation will conduct various closures and traffic modifications on Missouri Route 291 and U.S. MO 50 for bridge replacement operations. All work is weather permitting. See below for traffic modifications:

(Additional dates and modifications added)

Friday, Aug. 14 - Saturday Aug. 15 between 7:00am-3:00pm

  • Various lane closures on north and southbound MO 291 from SE Oldham to North of Bayberry.

Tuesday, Aug. 18 at 9:00am

  • Place traffic on the new Blue Parkway east and west of MO 291.

Tuesday, Aug. 18 at 12:00pm until Friday, Nov. 13 at 5:00pm

  • Close southbound MO 291 from Blue Parkway to the south side of U.S. 50. Motorists are encouraged to utilize Blue Parkway to Todd George.

Added: Wed., Aug. 19 7:00 p.m. until Thu., Aug. 20 6:00 a.m.

  • Close the right lane on WB U.S. 50 from west of Todd George to MO 291.

Added: Thu., Aug. 20 between 9:00 a.m. and 12:00 p.m.

  • Close the ramp from MO 291 to WB U.S. 50.

Added: Thu., Aug. 20 between 12:00 p.m. and 4:00 p.m.

  • Close the ramp from MO 291 to EB U.S. 50.

Added: Thu., Aug. 20 at 8:00 p.m. until Fri., Aug. 21 at 6:00 a.m.

  • Close the right lane on EB U.S. 50 from MO 291 south (Jefferson St) to MO 291 and close the EB off ramp to MO 291.

Fri., Sep. 11 at 10:00 a.m. until Fri., Nov. 13 at 5:00 p.m.

  • Close NB MO 291 from the south side of U.S. 50 to the north side of U.S. 50.

Fri., Sep. 11 at 3:00 p.m.

  • Open WB U.S. 50 to MO 291 (Right Turn Movement Only).

Fri., Sep. 11 between 8:00 p.m. and 10:00 p.m.

  • Close the right lane on WB U.S. 50 from west of Todd George to west of MO 291.
  • Close the left lane on EB U.S. 50 west of MO 291 to east of MO 291.

Fri., Sept. 11 at 10:00 p.m. until Mon., Sept. 14 at 6:00 a.m.

Bridge demo traffic modifications:

  • Close the left lane on WB U.S. 50 west of Todd George to the WB U.S. 50 off ramp. Traffic will be diverted to go up and over the ramp back to U.S. 50.
  • Close the left lane on EB U.S. 50 west of MO 291 to the MO 291 off ramp. Traffic will be diverted to go up and over the ramp back to U.S. 50.

This is part of a larger project at MO 291N and U.S. 50, which includes bridge replacement, road realignment, and ADA improvements from SE 7th Terrace to SE Oldham Parkway in Lee’s Summit with a completion date of January 2027. To learn more about the project visit: Missouri Route 291 North and U.S. Route 50 Interchange Improvements in Jackson | Missouri Department of Transportation

Motorists are reminded to slow down and pay attention while driving in work zones. Not all work zones look alike. Work zones can also be short-term, temporary lane closures to make quick repairs or remove debris form the roadway.

For more information about MoDOT news, projects or events, please visit our website at www.modot.org.kansascity. For instant updates, follow MoDOT_KC on X, or share posts and comments on our Facebook at www.facebook.com/MoDOT.KansasCity/. MoDOT Kansas City maintains more than 7,000 miles of state roadway in nine counties. Sign up online for workzone updates or call 888-ASK-MODOT.

Print

Latest Press Releases

Sunday Morning Fire Damages Townhome
Sunday Morning Fire Damages Townhome

Sunday Morning Fire Damages Townhome

On Sunday, September 18, 2022, at 10:26 a.m., the Lee's Summit Fire Department responded to a reported structure fire in the 1900 Block of NE Knollbrook Street. A passerby reported the building was on fire around the air conditioner. When the fire department arrived, smoke and fire was coming from the side of a two-story, four-unit townhome. Several occupants had evacuated the building. Fire crews quickly extinguished the fire on the exterior of the...
Lee’s Summit Water Utilities Releases 2022 Customer Survey Results
Lee’s Summit Water Utilities Releases 2022 Customer Survey Results

Lee’s Summit Water Utilities Releases 2022 Customer Survey Results

Lee’s Summit Water Utilities released the results of the 2022 Customer Survey which shows high overall satisfaction with the quality of water and sewer services.  A total of 629 residents completed the survey which was administered by ETC Institute in the spring of 2022. The Customer Survey was developed to objectively assess customer satisfaction with the delivery of water and sewer services and provide customers with an opportunity to provide...
Lee’s Summit 2022 State of the City on September 7
Lee’s Summit 2022 State of the City on September 7

Lee’s Summit 2022 State of the City on September 7

Lee’s Summit Mayor Bill Baird will deliver the State of the City address on Wednesday, Sept. 7 at The Aspen Room at the Stanley in downtown Lee’s Summit, 308 SE Douglas St. The Lee’s Summit Chamber of Commerce is hosting the luncheon. The event begins at 11 a.m. with the mayor’s address scheduled to start at noon. During the State of the City, Mayor Baird will reflect on his first term, the progress the City has made and how the City will...
First28293032