Search Press Releases

Press Release Archive

Press Releases

  |   Views: 2107
  |   Categories: Public Works News

Community Notification: Flood Hazard Revisions Along Cedar Creek

The City of Lee’s Summit, Missouri, Public Works Department in accordance with National Flood Insurance Program regulation 65.7(b)(1), hereby gives notice of the City of Lee’s Summit’s intent to revise the flood hazard information, generally located upstream and downstream of SW Ward Road along Cedar Creek. The flood hazard revisions are being proposed as part of Letter of Map Revision (LOMR, Case No. 22-07-0797P) for a completed construction project along Cedar Creek. The City of Lee’s Summit has constructed improvements that replaced the culverts at the stream’s crossing with SW Ward Road.

Specifically, the floodway shall be revised from a point approximately 1,000 feet downstream of SW Ward Road to a point approximately 1,500 feet upstream of SW Ward Road along Cedar Creek. As a result, the floodway widths shall narrow or remain unchanged within the area of revision. In addition, the Base Flood Elevations (1% annual chance water-surface elevations) will increase and decrease. Base Flood Elevations will increase a maximum of 0.3 feet at a point approximately 1,000 feet downstream of Ward Road.  The Special Flood Hazard Area (1% annual chance floodplain) will widen and narrow along Cedar Creek within the area of revision.

Maps and a detailed analysis of the proposed flood hazard revisions can be reviewed at Lee’s Summit City Hall, Public Works Department at 220 SE Green Street, Lee’s Summit, MO 64063. If you have any questions or concerns about the proposed project or its effect on your property, you may contact Karen Quackenbush of the City of Lee’s Summit at 816-969-1800 or PublicWorks@cityofls.net from 11/14/2022 to 12/14/2022.

Print

Latest Press Releases

The Addition of Adult Changing Tables at LSPR
The Addition of Adult Changing Tables at LSPR

The Addition of Adult Changing Tables at LSPR

Addressing a Universal Need: While public restrooms typically accommodate the diaper-changing needs of young children, there is growing recognition for inclusive facilities that can accommodate adults as well. Individuals who care for loved ones with disabilities often face limitations in venturing out due to concerns about accessible changing tables. Eitass Grant Supports Inclusion: Eitass awarded Lee's Summit Parks and Recreation (LSPR) a grant to...
City of Lee’s Summit to Host Stream Team and RecycleFEST
City of Lee’s Summit to Host Stream Team and RecycleFEST

City of Lee’s Summit to Host Stream Team and RecycleFEST

To celebrate Earth Month, the City of Lee’s Summit is hosting Stream Team and RecycleFEST to address litter in our waterways and support recycling. Stream Team will take place on April 20 from 10 a.m. to noon at Langsford Park, 1709 SE Langsford Road, and RecycleFEST will be held on April 27 from 9 a.m. to noon at the Maintenance Facility, 1971 SE Hamblen Road. The Stream Team protects local stream-side habitats by removing litter and debris from...
Groundbreaking Ceremony for Lee’s Summit Municipal Airport Hangar 2
Groundbreaking Ceremony for Lee’s Summit Municipal Airport Hangar 2

Groundbreaking Ceremony for Lee’s Summit Municipal Airport Hangar 2

The City of Lee’s Summit will hold a groundbreaking ceremony on April 18 at 1:30 p.m. to mark the start of a $16.8 million project to construct a new hangar at the Lee’s Summit Municipal Airport. The ceremony is open to the public and will take place at the airport’s east apron located at 2740 NE Hagan Road. The project includes infrastructure development and a 50,000 square foot state-of-the-art hangar with 30,000 square feet dedicated to...
City of Lee’s Summit Fire Station No. 4 To Be Unveiled on April 4
City of Lee’s Summit Fire Station No. 4 To Be Unveiled on April 4

City of Lee’s Summit Fire Station No. 4 To Be Unveiled on April 4

The City of Lee’s Summit and the Lee’s Summit Fire Department will host an Open House on April 4 at 11 a.m. to mark the opening of the new Fire Station No. 4 located at 5301 NE Lakewood Way. The public is invited to join elected and fire service officials to celebrate with a fire hose uncoupling ceremony and tours of the new station.   Fire Station No. 4 replaces the station on Woods Chapel Road built in 1977. The 12,100-square-foot facility...
City of Lee’s Summit Hosting Career Fair & Expo on March 27
City of Lee’s Summit Hosting Career Fair & Expo on March 27

City of Lee’s Summit Hosting Career Fair & Expo on March 27

The City of Lee’s Summit will host a Career Fair & Expo from 2 to 6 p.m., Mar. 27 at the Gamber Community Center, 4 SE Independence Ave. Job seekers will find outstanding job opportunities with the City of Lee’s Summit in several departments. The event is free and open to the public. The City offers meaningful work that positively impacts the safety and quality of life for our residents. Professionals representing Development Services, Parks and...
1345Last