Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 1327
  |   Categories: Public Works News

Public Invited to Comment on Ward Road Improvements from O’Brien to Chipman Roads

The City of Lee’s Summit is hosting a public meeting from 4:30 p.m. to 6:30 p.m. on Thursday, Feb. 27, in the Strother Conference Room at City Hall, 220 SE Green St. Lee’s Summit, Mo., to discuss infrastructure improvements for the Ward Road corridor from O’Brien to Chipman roads. The meeting will allow the public to view preliminary plans and exhibits, review tentative schedules for right-of-way acquisition and construction, and provide feedback.

The Ward Road project improvements include roadway reconstruction to a two-lane section, one in each direction, with bicycle lanes and sidewalk along both sides.  Other improvements include curb and gutter, enclosed storm drainage, intersection improvements, continuous street lighting, new waterline infrastructure, and associated utility relocations.  The City anticipates these improvements will support the City’s Livable Street Policy and Bicycle Transportation Plan.  The project goals are improved safety, operations, and livability.

In addition to the Feb. 27 public meeting, the plans and exhibits will be available online and public comments may be submitted beginning Feb. 27, at https://cityofls.net/ward2. Online public comments will be accepted through March 13, 2025.

Construction is tentatively expected to start in late 2026. This project was approved by voters with the passage of the 2017 capital improvement sales tax initiative. The ½-cent capital improvement sales tax funds road, transportation-related and stormwater projects.

For questions about the project, contact the Public Works Department at publicworks@cityofls.net or 816.969.1800.

Print

Latest News

City Crews Prepared for Possible Refreeze

City Crews Prepared for Possible Refreeze

The City’s crews prepared trucks and will be called in as needed tonight, Thurs., March 16, and overnight into Fri., March 17, due to the potential for a refreeze. Rain may change over to snow/sleet, and temperatures are expected to drop. High winds should dry out pavements; however, crews will be called in as needed to apply salt treatment in case any wet pavement refreezes. Drivers should be aware of the potential for refreeze especially on elevated surfaces...
City Crews Preparing for Snow This Weekend

City Crews Preparing for Snow This Weekend

The City’s crews are preparing for snow on Sat., Jan. 21, and overnight into Sun., Jan. 22. Crews are scheduled to report at 7 p.m. on Saturday to treat streets as needed and will continue to work overnight into Sunday. Snow accumulations for the Lee’s Summit area may be around one half inch, and the main concerns will be snow overwhelming pavements Saturday night and a re-freeze Sunday morning when temperatures drop below freezing. READ MORE -->

City Crews Preparing for Chance of Snow Thurs., Jan. 19

City Crews Preparing for Chance of Snow Thurs., Jan. 19

The City’s crews are preparing for a chance of snow which is expected to arrive in the early morning hours on Thurs., Jan. 19. A small crew will report at 3 a.m. on Thursday to treat streets with salt as needed. Air and pavement temperatures are expected to bottom out around freezing and slick streets are possible. Drivers should use caution during the Thursday morning commute, especially on elevated surfaces such as bridges and overpasses. The City will...
Section of NE Scruggs Road Set to Close Jan. 17

Section of NE Scruggs Road Set to Close Jan. 17

Update: Due to weather, the section of NE Scruggs from NW Todd George to NE Bristol Drive closed for force main repairs, will remain closed until March 10, weather permitting. A section of NE Scruggs Road from NE Todd George Road to NE Bristol Drive is set to close to through traffic on Tuesday, January 17, and will remain closed for approximately six weeks, weather permitting. The road closure is necessary so a contractor for Lee’s Summit Water...
City Crews Preparing for Chance of Snow Thurs., Jan. 12

City Crews Preparing for Chance of Snow Thurs., Jan. 12

The City’s crews are preparing for a quick moving storm with a chance of snow which is expected to arrive in the early morning hours on Thurs., Jan. 12. A small crew will report at 3 a.m. on Thursday to treat streets with salt as needed. Pavement temperatures are expected to remain at or near freezing which may cause slushy conditions. Drivers should use caution during the Thursday morning commute, especially on elevated surfaces such as bridges and...
First333537Last