Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 2808
  |   Categories: Public Works News

REVISED MoDOT Update: Closures on MO 291 and U.S. 50 in Lee's Summit for bridge replacement operations Now - November 2026

The following information is shared from the Missouri Department of Transportation (MoDOT) and is related to the 291 North and US Route 50 Interchange project. https://www.modot.org/node/94913

Project: Missouri Route 291 North and U.S. Route 50 Interchange Improvements in Jackson

JACKSON COUNTY – The Missouri Department of Transportation will conduct various closures and traffic modifications on Missouri Route 291 and U.S. MO 50 for bridge replacement operations. All work is weather permitting. See below for traffic modifications (all times listed are approximate):

Additional dates and modifications added

Friday, Aug. 14 - Saturday Aug. 15 between 7:00am-3:00pm

  • Various lane closures on north and southbound MO 291 from SE Oldham to North of Bayberry.

Tuesday, Aug. 18 at 9:00am

  • Place traffic on the new Blue Parkway east and west of MO 291.

Tuesday, Aug. 18 at 12:00pm until Friday, Nov. 13 at 5:00pm

  • Close southbound MO 291 from Blue Parkway to the south side of U.S. 50. Motorists are encouraged to utilize Blue Parkway to Todd George.

Added: Wed., Aug. 19 7:00 p.m. until Thu., Aug. 20 6:00 a.m.

  • Close the right lane on WB U.S. 50 from west of Todd George to MO 291.

Added: Thu., Aug. 20 between 9:00 a.m. and 12:00 p.m.

  • Close the ramp from MO 291 to WB U.S. 50.

Added: Thu., Aug. 20 between 12:00 p.m. and 4:00 p.m.

  • Close the ramp from MO 291 to EB U.S. 50.

Added: Thu., Aug. 20 at 8:00 p.m. until Fri., Aug. 21 at 6:00 a.m.

  • Close the right lane on EB U.S. 50 from MO 291 south (Jefferson St) to MO 291 and close the EB off ramp to MO 291.

Added 8/25/26: (TODAY) Tuesday, August 25 at 9:00 a.m. - 3:00 p.m.

  • Close the right lane on NB 291 from SE Oldham to South of Blue Parkway.
  • Close the right lane on SB 291 from Bayberry to 50 Highway.

Added 8/25/26: The Missouri Department of Transportation will CLOSE the ramp from MO 291 to westbound U.S. 50 in Lee’s Summit for bridge project operations beginning tomorrow, Aug. 26 between 9 a.m. and 3 p.m. All work is weather permitting.

Fri., Sep. 11 at 10:00 a.m. until Fri., Nov. 13 at 5:00 p.m.

  • Close NB MO 291 from the south side of U.S. 50 to the north side of U.S. 50.

Fri., Sep. 11 at 3:00 p.m.

  • Open WB U.S. 50 to MO 291 (Right Turn Movement Only).

Fri., Sep. 11 between 8:00 p.m. and 10:00 p.m.

  • Close the right lane on WB U.S. 50 from west of Todd George to west of MO 291.
  • Close the left lane on EB U.S. 50 west of MO 291 to east of MO 291.

 

Tues. Sept. 8, at 4:00 a.m. until Fri. Nov. 13 at 5:00 p.m.

  • Close NB 291 from Oldham to Blue Parkway
  • Close SB 291 from Blue Parkway to Oldham

Tues. Sept. 8 at 4:00 a.m. until Mon. Sept. 14 at 5:00 p.m.

  • Close the Right Lane EB U.S. 50 from Jefferson to NB MO 291
  • Close ramp from EB U.S. 50 to NB MO 291
  • Close the acceleration lane on the ramp from MO 291 to EB U.S. 50 (barrier wall removal)
  • Close the acceleration lane on the ramp from MO 291 to WB U.S. 50 (barrier wall removal)

Mon. Sept. 14  from 9:00 a.m.- 3:00 p.m.

  • Various intermittent lane closures EB/WB U.S. 50 for striping operations

Fri., Sept. 11 at 10:00 p.m. until Mon., Sept. 14 at 6:00 a.m. REVISED: Mon. Sept. 14 at 10:00 p.m. until Mon. Sept. 21 at 6:00 a.m.

Bridge demo traffic modifications:

  • Close the left lane on WB U.S. 50 west of Todd George to the WB U.S. 50 off ramp. Traffic will be diverted to go up and over the ramp back to U.S. 50.
  • Close the left lane on EB U.S. 50 west of MO 291 to the MO 291 off ramp. Traffic will be diverted to go up and over the ramp back to U.S. 50.

Mon. Sept. 21 at 3:00 p.m. until Fri. Nov. 13 at 5:00 p.m.

  • Various lane closures on EB/WB U.S. 50 at MO 291. The off ramps to MO 291 will be limited to right turns only.

This is part of a larger project at MO 291N and U.S. 50, which includes bridge replacement, road realignment, and ADA improvements from SE 7th Terrace to SE Oldham Parkway in Lee’s Summit with a completion date of January 2027. To learn more about the project visit: Missouri Route 291 North and U.S. Route 50 Interchange Improvements in Jackson | Missouri Department of Transportation

Motorists are reminded to slow down and pay attention while driving in work zones. Not all work zones look alike. Work zones can also be short-term, temporary lane closures to make quick repairs or remove debris form the roadway.

For more information about MoDOT news, projects or events, please visit our website at www.modot.org.kansascity. For instant updates, follow MoDOT_KC on X, or share posts and comments on our Facebook at www.facebook.com/MoDOT.KansasCity/. MoDOT Kansas City maintains more than 7,000 miles of state roadway in nine counties. Sign up online for workzone updates or call 888-ASK-MODOT.

Print

Latest News

Section of Southeast Second Street Set to Close Monday, October 7

Section of Southeast Second Street Set to Close Monday, October 7

Section of Southeast Second Street Set to Close Monday, October 7
UPDATE 10/28/24: Southeast Second Street is now open. UPDATE 10/17/24: Southeast Second Street from Southeast Green Street to Southeast Grand Avenue is now expected to remain closed until approximately Friday, October 25, for additional curb work. A section of Southeast Second Street from Southeast Green Street to Southeast Grand Avenue is set to close on Monday, Oct. 7, until approximately Friday, Oct. 18. The detour route includes Southeast Grand Avenue,...
Upcoming Traffic Changes for the Green Street Project

Upcoming Traffic Changes for the Green Street Project

Upcoming Traffic Changes for the Green Street Project
The Southeast Green Street entrance into the Lee’s Summit City Hall parking lot and garage is expected to reopen this afternoon Thursday, Sept. 26, and will remain open through the weekend for the Oktoberfest event. The Southeast Green Street entrance will close again on Monday, Sept. 30, and access to the City Hall parking lot and garage will once again be from the alley off of Southeast Second Street until approximately the end of November. Also beginning...
Section of Southwest Market Street Closed

Section of Southwest Market Street Closed

Section of Southwest Market Street Closed

A section of Southwest Market Street between Southwest First and Second streets is closed. Length of closure is unknown at this time but currently permitted through Nov. 8. The closure is necessary for installation of utilities and to restore the street. This work is development related for the Ellis Glen project.

 

Section of Northeast Hagan Road Set to Close Wednesday, Sept. 25

Section of Northeast Hagan Road Set to Close Wednesday, Sept. 25

Section of Northeast Hagan Road Set to Close Wednesday, Sept. 25
A section of Northeast Hagan Road at Northeast Maguire Boulevard is set to close on Wednesday, September 25, for approximately three weeks. Northeast Maguire Boulevard is also closed to through traffic between Northeast Independence Avenue and Northeast Hagan Road. The closures are necessary for water main work associated with the Hangar 2 project at the Lee’s Summit Municipal Airport. The detour routes include Northeast Jones Industrial Drive and Northeast...
Section of Southeast Shenandoah Drive Set to Close Monday, Sept. 23

Section of Southeast Shenandoah Drive Set to Close Monday, Sept. 23

Section of Southeast Shenandoah Drive Set to Close Monday, Sept. 23

A section of Southeast Shenandoah Drive from Southeast Cumberland Drive to Southeast Ashton Drive is set to close on Monday, Sept. 23, for approximately one week. The detour route includes Southeast Cumberland Drive, Southeast Blue Parkway, and Southeast Battery Drive.

 

First323436Last