Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 970
  |   Categories: Public Works News

City Crews Preparing for Winter Weather Season

The City of Lee’s Summit is holding a snow dry run from 7 a.m. to 3:30 p.m. Tuesday, Oct. 24, to allow crews to prepare for the upcoming 2023-2024 winter weather season.

City crews are testing equipment and software, and driving snow routes with plows and salt spreaders installed on trucks. The purpose of the dry run is to ensure all equipment and software are working properly and that drivers are familiar with snow routes, which is critical to the City’s snow and ice control operations. The annual snow dry run was scheduled in advance and is not in response to any forecast.

Crews are also testing turn-by-turn routing. Snow plow drivers have touchscreen tablets in their trucks to guide them through their assigned routes. This technology routes trucks more efficiently and reduces the chance of missed streets.

Prior to a typical forecasted snow event, crews will pre-treat all streets within the City. After the first inch of accumulation, City crews will begin plowing and treating primary streets followed by secondary streets. Crews will treat all residential streets after primary and secondary streets and will begin plowing all residentials if more than two inches of accumulating snow has fallen. Crews typically operate 24 hours per day. Depending on snow accumulation totals, it can take from 24-48 hours for crews to complete snow and ice control operations after snow accumulations end.

As a reminder, primary streets are major four-lane or high-volume two-lane streets, such as Pryor Road, Ward Road, Woods Chapel Road, Langsford Road and Longview Road. Secondary streets are defined as minor thoroughfares and are typically the main streets that go into neighborhoods or subdivisions from the primaries, such as Orchard Street and O'Brien Road. Residential streets are smaller side streets and cul-de-sacs off of the secondary streets, such as Willow Way and Madison Street. The Missouri Department of Transportation (MoDOT) is responsible for plowing and treating major highways through Lee’s Summit including I-470, US-50, M-291 and M-150 along with the respective interchanges and most frontage roads.

During snow events, residents can help with the snow and ice control process by removing obstacles such as vehicles, basketball hoops and trash cans from streets. We also ask residents to remain patient - crews have more than 1,000 lane miles of streets and cul-de-sacs to plow and treat.

Print

Latest News

City’s Crews Prepared for Winter Weather Early Tuesday, Dec. 29, through Friday, Jan. 1

City’s Crews Prepared for Winter Weather Early Tuesday, Dec. 29, through Friday, Jan. 1

The City has a crew scheduled to report at 3 a.m. on Tuesday, Dec. 29, to monitor and treat roadways as needed for the morning commute. Freezing rain and ice is possible in the early morning hours, and roadways may become slick. Residents should use caution while driving, especially on elevated surfaces such as bridges and overpasses. Crews will treat roadways as necessary throughout the day. With temperatures fluctuating above and below freezing, crews also will be...
Portion of Southeast Green Street to Close Dec. 21

Portion of Southeast Green Street to Close Dec. 21

Portion of Southeast Green Street to Close Dec. 21
***UPDATE*** This closure will be extended until 5 p.m. on Thursday, Dec. 24, to allow sufficient time for a concrete patch to cure before being opened to traffic. Southeast Green Street will be closed to through traffic between Southeast Fifth Street and Southeast Fourth Street from 8 a.m. on Dec. 21 until 5 p.m. on Dec. 23. The closure is necessary for stormwater pipe installation. The detour route is Southeast Fifth Street, to Southeast Douglas Street,...
City Crews Treating Elevated Surfaces with Brine Today, Tuesday, Dec. 8

City Crews Treating Elevated Surfaces with Brine Today, Tuesday, Dec. 8

The City’s crews are treating elevated surfaces with brine this morning Tuesday, Dec. 8. The fog plus low temperatures may create slick conditions on elevated surfaces such as bridges.

Brine is a saltwater solution which helps to prevent ice and other precipitation from bonding to pavement. Roadways and other surfaces treated with brine often have a striped appearance.

Evening and Overnight Closures for Southwest Persels Road

Evening and Overnight Closures for Southwest Persels Road

Evening and Overnight Closures for Southwest Persels Road
***UPDATE*** The closure on Tuesday, Dec. 8, will begin at 6 p.m., and the work on Wed/Thurs Dec. 9-10 has been canceled. Evening and overnight closures are scheduled from Dec. 6 through Dec. 10 for Southwest Persels Road at Southwest Market Street. The roadway will be open to traffic during daytime hours. The construction work is necessary for a water main tie-in as part of the Jefferson Street Improvements project. Previously scheduled work...
City's Crews Prepared for Winter Weather Early Thurs., Dec. 3

City's Crews Prepared for Winter Weather Early Thurs., Dec. 3

***UPDATE*** The forecast has changed and slick conditions are not expected until after 7 a.m. on Thurs., Dec. 3. City crews are now scheduled to report at 7 a.m. and will treat streets as needed. The City has a crew scheduled to report at 3 a.m. on Thursday, Dec. 3, to treat roadways as winter weather enters the Kansas City area. While minor accumulations are expected, roadways may become slick with temperatures at or below freezing. Residents should use caution...
First283032Last