Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 2158
  |   Categories: Public Works News

City Crews Preparing for Winter Weather Season

The City of Lee’s Summit will hold a snow dry run from 7 a.m. to 3:30 p.m. today, Wed., Nov. 9, to allow crews to prepare for the upcoming 2022-2023 winter weather season.

City crews will be testing equipment and software, and driving snow routes with plows and salt spreaders installed on trucks. The purpose of the dry run is to ensure all equipment and software is working properly and that drivers are familiar with snow routes, which is critical to the City’s snow and ice control operations. The annual snow dry run was scheduled in advance and is not in response to any forecast.

Crews will be testing new technology this year with the addition of turn by turn routing. Snow plow drivers will have touchscreen tablets in their trucks to guide them through their assigned routes. The new technology is expected to route trucks more efficiently and reduce the chance of missed streets.

Prior to a typical forecasted snow event, crews will pre-treat all streets within the City. After the first inch of accumulation, City crews will begin plowing and treating primary streets and then secondary streets. Crews will treat all residential streets after primary and secondary streets, and will begin plowing all residentials if more than two inches of accumulating snow has fallen. Crews typically operate 24 hours per day. Depending on snow accumulation totals, it can take from 24-48 hours for crews to complete snow and ice control operations after snow accumulations end.

As a reminder, primary streets are major four-lane or high-volume two-lane streets, such as Pryor Road, Ward Road, Woods Chapel Road, Langsford Road and Longview Road. Secondary streets are defined as minor thoroughfares, and are typically the main streets that go into neighborhoods or subdivisions from the primaries, such as Orchard Street and O'Brien Road. Residential streets are smaller side streets and cul-de-sacs off the secondary streets, such as Willow Way and Madison Street. The Missouri Department of Transportation (MoDOT) is responsible for plowing and treating major highways through Lee’s Summit including I-470, US-50, M-291 and M-150 along with the respective interchanges and most frontage roads.

During snow events, residents can help the snow and ice control process by removing obstacles such as vehicles, basketball hoops and trash cans from streets. We also ask residents to remain patient - crews have more than 1,000 lane miles of streets and cul-de-sacs to plow and treat.

For more information about the City’s snow and ice control program, visit LSsnow.net or contact the Public Works Department at 969-1800 or publicworks@cityofls.net.

Print

Latest News

City Crews Preparing for Snow on Mon., Dec. 19

City Crews Preparing for Snow on Mon., Dec. 19

The City's crews are preparing for snow to begin around 6 a.m. on Mon., Dec. 19. Crews are expected to report at 9 p.m. tonight, Sun., Dec. 18, to begin pre-treatment with salt, and treatment will continue throughout the event as needed. Temperatures are expected to be below freezing when the snow starts, and the Monday morning commute may be slick. Residents are encouraged to use caution while driving especially on elevated surfaces such as...
City Crews Preparing for Snow Mon., Nov. 14, and Overnight Into Tues., Nov. 15

City Crews Preparing for Snow Mon., Nov. 14, and Overnight Into Tues., Nov. 15

The City’s crews are preparing equipment and pre-treating hot spot areas such as major intersections and bridges with rock salt today, Mon. Nov. 14, in anticipation of snow later tonight and overnight into Tues., Nov. 15. Crews are currently on standby and will be called in as necessary overnight based on the forecast and conditions. Precipitation is expected to start as light rain changing over to snow. Pavement temperatures will hover around freezing, and...
City Crews Preparing for Winter Weather Season

City Crews Preparing for Winter Weather Season

The City of Lee’s Summit will hold a snow dry run from 7 a.m. to 3:30 p.m. today, Wed., Nov. 9, to allow crews to prepare for the upcoming 2022-2023 winter weather season. City crews will be testing equipment and software, and driving snow routes with plows and salt spreaders installed on trucks. The purpose of the dry run is to ensure all equipment and software is working properly and that drivers are familiar with snow routes, which is critical to the...
Section of SW Murray Road Set to Close Nov. 14

Section of SW Murray Road Set to Close Nov. 14

Section of SW Murray Road Set to Close Nov. 14
A section of SW Murray Road near SW 1st Street is set to close on Monday, Nov. 14, and will remain closed until the evening of Friday, Nov. 18, weather permitting. The road closure is necessary to perform water main replacement work as part of the FY22 Water Main Rehabilitation project. The detour route is SW 3rd Street and Oldham Parkway.  The FY22 Water Main Rehabilitation project helps with continued efforts to maintain and strengthen the water...
Curb Replacement on Section of NW Chipman Road

Curb Replacement on Section of NW Chipman Road

Preparations began this week for curb replacement on a section of NW Chipman Road from U.S. Route 50 to the railroad bridge just east of NW Donovan Road. Curb removal is expected to start on Mon., Nov. 7, with pours and restoration to follow as well as sidewalk ramp replacement in several locations. The work is expected to take approximately three weeks, weather permitting. While there will be lane closures during this work, both eastbound and westbound NW Chipman...
First141618Last