Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 2092
  |   Categories: Public Works News

Public Invited to Comment on Douglas Street Improvements

The City of Lee’s Summit is hosting a public meeting from 5:30 to 7:30 p.m. on Wed., April 19, in the Strother Conference Room on the first floor of City Hall, 220 SE Green St., Lee's Summit, Mo. 64063, to discuss infrastructure improvements for the Douglas Street corridor from Chipman Road to 2nd Street. The meeting will allow the public to view conceptual plans and exhibits and provide feedback.

The meeting is an open house style format and the public can come and go as schedules allow. City staff as well as representatives from consulting engineering firm Kimley-Horn will be available for questions.

The project is designed to enhance safety and improve connectivity, resulting in an inviting gateway corridor into downtown Lee’s Summit. The project will re-construct the existing infrastructure that has been deteriorated over the long life of the pavement. Douglas Street would remain a two-lane roadway with improved pavement, curb, storm drainage and waterline infrastructure as well as modified access management, such as driveway adjustments and consolidations. The project would also add a sidewalk on the west side of Douglas Street, multi-use path on the east side of Douglas Street, street lighting and would relocate utilities.

In addition to the meeting on April 19, the plans and exhibits will be available online and public comments may be submitted at the meeting or online from April 19, until May 7. The website to provide comments will be posted soon.

Construction is expected to start in the spring of 2025. Voters approved this project in 2017 with the passage of the capital improvement sales tax continuation. The ½-cent capital improvement sales tax funds road, transportation-related and stormwater projects.

Print

Latest News

City Crews Preparing for Snow This Weekend

City Crews Preparing for Snow This Weekend

The City’s crews are preparing for snow on Sat., Jan. 21, and overnight into Sun., Jan. 22. Crews are scheduled to report at 7 p.m. on Saturday to treat streets as needed and will continue to work overnight into Sunday. Snow accumulations for the Lee’s Summit area may be around one half inch, and the main concerns will be snow overwhelming pavements Saturday night and a re-freeze Sunday morning when temperatures drop below freezing. READ MORE -->

City Crews Preparing for Chance of Snow Thurs., Jan. 19

City Crews Preparing for Chance of Snow Thurs., Jan. 19

The City’s crews are preparing for a chance of snow which is expected to arrive in the early morning hours on Thurs., Jan. 19. A small crew will report at 3 a.m. on Thursday to treat streets with salt as needed. Air and pavement temperatures are expected to bottom out around freezing and slick streets are possible. Drivers should use caution during the Thursday morning commute, especially on elevated surfaces such as bridges and overpasses. The City will...
Section of NE Scruggs Road Set to Close Jan. 17

Section of NE Scruggs Road Set to Close Jan. 17

Update: Due to weather, the section of NE Scruggs from NW Todd George to NE Bristol Drive closed for force main repairs, will remain closed until March 10, weather permitting. A section of NE Scruggs Road from NE Todd George Road to NE Bristol Drive is set to close to through traffic on Tuesday, January 17, and will remain closed for approximately six weeks, weather permitting. The road closure is necessary so a contractor for Lee’s Summit Water...
City Crews Preparing for Chance of Snow Thurs., Jan. 12

City Crews Preparing for Chance of Snow Thurs., Jan. 12

The City’s crews are preparing for a quick moving storm with a chance of snow which is expected to arrive in the early morning hours on Thurs., Jan. 12. A small crew will report at 3 a.m. on Thursday to treat streets with salt as needed. Pavement temperatures are expected to remain at or near freezing which may cause slushy conditions. Drivers should use caution during the Thursday morning commute, especially on elevated surfaces such as bridges and...
City Crews Prepared for Chance of Wintry Mix Sat., Jan. 7

City Crews Prepared for Chance of Wintry Mix Sat., Jan. 7

The City’s crews prepared trucks and equipment due to the chance of a wintry mix of precipitation on Sat., Jan. 7. The current forecast shows air and pavement temperatures should remain above freezing; however, the City will continue to monitor the weather and will call out crews as needed for response.

 

First121416Last