Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 130
  |   Categories: Public Works News

Section of Northeast Independence Avenue Set to Close Monday, November 3

Section of Northeast Independence Avenue Set to Close Monday, November 3

A section of Northeast Independence Avenue between Northeast Orchard and Southeast Second streets is set to close on Monday, November 3, for approximately three weeks. The hard closure is between Southeast Second Street and 209 NE Independence Avenue. The detour route includes Northeast Orchard Street, Northeast Grand Avenue, and Southeast Second Street.

This sewer work is associated with the West Prairie Lee Sewer Capacity Study, Upgrade and Construction project. This project consists of improvements to the West Prairie Lee Interceptor to address existing and future sewer capacity constraints. All work is weather permitting and schedules are subject to change.

Print

Latest News

Public Invited to Comment on Douglas Street Improvements

Public Invited to Comment on Douglas Street Improvements

The City of Lee’s Summit is hosting a public meeting from 5:30 to 7:30 p.m. on Wed., April 19, in the Strother Conference Room on the first floor of City Hall, 220 SE Green St., Lee's Summit, Mo. 64063, to discuss infrastructure improvements for the Douglas Street corridor from Chipman Road to 2nd Street. The meeting will allow the public to view conceptual plans and exhibits and provide feedback.

City Crews Prepared for Possible Refreeze

City Crews Prepared for Possible Refreeze

The City’s crews prepared trucks and will be called in as needed tonight, Thurs., March 16, and overnight into Fri., March 17, due to the potential for a refreeze. Rain may change over to snow/sleet, and temperatures are expected to drop. High winds should dry out pavements; however, crews will be called in as needed to apply salt treatment in case any wet pavement refreezes. Drivers should be aware of the potential for refreeze especially on elevated surfaces...
City Crews Preparing for Snow This Weekend

City Crews Preparing for Snow This Weekend

The City’s crews are preparing for snow on Sat., Jan. 21, and overnight into Sun., Jan. 22. Crews are scheduled to report at 7 p.m. on Saturday to treat streets as needed and will continue to work overnight into Sunday. Snow accumulations for the Lee’s Summit area may be around one half inch, and the main concerns will be snow overwhelming pavements Saturday night and a re-freeze Sunday morning when temperatures drop below freezing. READ MORE -->

City Crews Preparing for Chance of Snow Thurs., Jan. 19

City Crews Preparing for Chance of Snow Thurs., Jan. 19

The City’s crews are preparing for a chance of snow which is expected to arrive in the early morning hours on Thurs., Jan. 19. A small crew will report at 3 a.m. on Thursday to treat streets with salt as needed. Air and pavement temperatures are expected to bottom out around freezing and slick streets are possible. Drivers should use caution during the Thursday morning commute, especially on elevated surfaces such as bridges and overpasses. The City will...
Section of NE Scruggs Road Set to Close Jan. 17

Section of NE Scruggs Road Set to Close Jan. 17

Update: Due to weather, the section of NE Scruggs from NW Todd George to NE Bristol Drive closed for force main repairs, will remain closed until March 10, weather permitting. A section of NE Scruggs Road from NE Todd George Road to NE Bristol Drive is set to close to through traffic on Tuesday, January 17, and will remain closed for approximately six weeks, weather permitting. The road closure is necessary so a contractor for Lee’s Summit Water...
First333537Last