Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 2804
  |   Categories: Public Works News

REVISED MoDOT Update: Closures on MO 291 and U.S. 50 in Lee's Summit for bridge replacement operations Now - November 2026

The following information is shared from the Missouri Department of Transportation (MoDOT) and is related to the 291 North and US Route 50 Interchange project. https://www.modot.org/node/94913

Project: Missouri Route 291 North and U.S. Route 50 Interchange Improvements in Jackson

JACKSON COUNTY – The Missouri Department of Transportation will conduct various closures and traffic modifications on Missouri Route 291 and U.S. MO 50 for bridge replacement operations. All work is weather permitting. See below for traffic modifications (all times listed are approximate):

Additional dates and modifications added

Friday, Aug. 14 - Saturday Aug. 15 between 7:00am-3:00pm

  • Various lane closures on north and southbound MO 291 from SE Oldham to North of Bayberry.

Tuesday, Aug. 18 at 9:00am

  • Place traffic on the new Blue Parkway east and west of MO 291.

Tuesday, Aug. 18 at 12:00pm until Friday, Nov. 13 at 5:00pm

  • Close southbound MO 291 from Blue Parkway to the south side of U.S. 50. Motorists are encouraged to utilize Blue Parkway to Todd George.

Added: Wed., Aug. 19 7:00 p.m. until Thu., Aug. 20 6:00 a.m.

  • Close the right lane on WB U.S. 50 from west of Todd George to MO 291.

Added: Thu., Aug. 20 between 9:00 a.m. and 12:00 p.m.

  • Close the ramp from MO 291 to WB U.S. 50.

Added: Thu., Aug. 20 between 12:00 p.m. and 4:00 p.m.

  • Close the ramp from MO 291 to EB U.S. 50.

Added: Thu., Aug. 20 at 8:00 p.m. until Fri., Aug. 21 at 6:00 a.m.

  • Close the right lane on EB U.S. 50 from MO 291 south (Jefferson St) to MO 291 and close the EB off ramp to MO 291.

Added 8/25/26: (TODAY) Tuesday, August 25 at 9:00 a.m. - 3:00 p.m.

  • Close the right lane on NB 291 from SE Oldham to South of Blue Parkway.
  • Close the right lane on SB 291 from Bayberry to 50 Highway.

Added 8/25/26: The Missouri Department of Transportation will CLOSE the ramp from MO 291 to westbound U.S. 50 in Lee’s Summit for bridge project operations beginning tomorrow, Aug. 26 between 9 a.m. and 3 p.m. All work is weather permitting.

Fri., Sep. 11 at 10:00 a.m. until Fri., Nov. 13 at 5:00 p.m.

  • Close NB MO 291 from the south side of U.S. 50 to the north side of U.S. 50.

Fri., Sep. 11 at 3:00 p.m.

  • Open WB U.S. 50 to MO 291 (Right Turn Movement Only).

Fri., Sep. 11 between 8:00 p.m. and 10:00 p.m.

  • Close the right lane on WB U.S. 50 from west of Todd George to west of MO 291.
  • Close the left lane on EB U.S. 50 west of MO 291 to east of MO 291.

 

Tues. Sept. 8, at 4:00 a.m. until Fri. Nov. 13 at 5:00 p.m.

  • Close NB 291 from Oldham to Blue Parkway
  • Close SB 291 from Blue Parkway to Oldham

Tues. Sept. 8 at 4:00 a.m. until Mon. Sept. 14 at 5:00 p.m.

  • Close the Right Lane EB U.S. 50 from Jefferson to NB MO 291
  • Close ramp from EB U.S. 50 to NB MO 291
  • Close the acceleration lane on the ramp from MO 291 to EB U.S. 50 (barrier wall removal)
  • Close the acceleration lane on the ramp from MO 291 to WB U.S. 50 (barrier wall removal)

Mon. Sept. 14  from 9:00 a.m.- 3:00 p.m.

  • Various intermittent lane closures EB/WB U.S. 50 for striping operations

Fri., Sept. 11 at 10:00 p.m. until Mon., Sept. 14 at 6:00 a.m. REVISED: Mon. Sept. 14 at 10:00 p.m. until Mon. Sept. 21 at 6:00 a.m.

Bridge demo traffic modifications:

  • Close the left lane on WB U.S. 50 west of Todd George to the WB U.S. 50 off ramp. Traffic will be diverted to go up and over the ramp back to U.S. 50.
  • Close the left lane on EB U.S. 50 west of MO 291 to the MO 291 off ramp. Traffic will be diverted to go up and over the ramp back to U.S. 50.

Mon. Sept. 21 at 3:00 p.m. until Fri. Nov. 13 at 5:00 p.m.

  • Various lane closures on EB/WB U.S. 50 at MO 291. The off ramps to MO 291 will be limited to right turns only.

This is part of a larger project at MO 291N and U.S. 50, which includes bridge replacement, road realignment, and ADA improvements from SE 7th Terrace to SE Oldham Parkway in Lee’s Summit with a completion date of January 2027. To learn more about the project visit: Missouri Route 291 North and U.S. Route 50 Interchange Improvements in Jackson | Missouri Department of Transportation

Motorists are reminded to slow down and pay attention while driving in work zones. Not all work zones look alike. Work zones can also be short-term, temporary lane closures to make quick repairs or remove debris form the roadway.

For more information about MoDOT news, projects or events, please visit our website at www.modot.org.kansascity. For instant updates, follow MoDOT_KC on X, or share posts and comments on our Facebook at www.facebook.com/MoDOT.KansasCity/. MoDOT Kansas City maintains more than 7,000 miles of state roadway in nine counties. Sign up online for workzone updates or call 888-ASK-MODOT.

Print

Latest News

Surface Seal Set to Begin this Friday, June 6

Surface Seal Set to Begin this Friday, June 6

Surface seal operations in Lee’s Summit are expected to begin on Friday, June 6, and will last for approximately one month, weather permitting. New this year, the City of Lee’s Summit’s contractor Vance Brothers will provide the latest schedule and surface seal information on their website: https://www.vancebrothers.com/project-schedules/. If a street is not completed as scheduled due to weather, mechanical delays, or READ MORE -->
Section of Southbound Northeast Douglas Street Set to Close June 3-4

Section of Southbound Northeast Douglas Street Set to Close June 3-4

Section of Southbound Northeast Douglas Street Set to Close June 3-4

A section of southbound Northeast Douglas Street between Northeast Orchard and Northeast Elm streets is set to close on Tuesday, June 3. Work is permitted through Wednesday, June 4. Detour routes include Northeast Orchard Street, Northeast Green Street, and Northeast Maple Street, or Northeast Orchard Street, Northeast Main Street, and Northeast Maple Street.

Section of Northeast Maybrook Road Closed for Emergency Bridge Repairs

Section of Northeast Maybrook Road Closed for Emergency Bridge Repairs

Section of Northeast Maybrook Road Closed for Emergency Bridge Repairs

Update 6/18/25: The Maybrook Rd Bridge is now open.
A section of Northeast Maybrook Road between Northeast Anderson Drive and Northeast Saint Andrews Circle is closed for emergency repairs to the wooden bridge. The duration of the closure is unknown at this time. Traffic is encouraged to use Northeast Anderson Drive as a detour route.

 

Section of Eastbound Southwest Second Street Set to Close Monday, May 19

Section of Eastbound Southwest Second Street Set to Close Monday, May 19

Section of Eastbound Southwest Second Street Set to Close Monday, May 19

A section of eastbound Southwest Second Street between Southwest Jefferson and Southwest Market streets is set to close on Monday, May 19, and will remain closed for approximately two weeks, weather permitting. Westbound Southwest Second Street will remain open. READ MORE -->

 

Southwest Sampson Road Bridge Replacement Set to Begin Wednesday, May 14

Southwest Sampson Road Bridge Replacement Set to Begin Wednesday, May 14

Southwest Sampson Road Bridge Replacement Set to Begin Wednesday, May 14
Update 10/21/25: Southwest Sampson Road is now open. Bridge replacement over Mouse Creek on Southwest Sampson Road between Southwest Scherer and Southwest Hook roads is set to begin on Wednesday, May 14, and will last until approximately mid-October 2025. Southwest Sampson Road between Southwest Scherer and Southwest Hook roads will remain closed to thru traffic during this phase two work as part of the Sampson Road Stormwater Improvements project. READ MORE...
First192123Last