Pryor Road - Hook Rd to Longview Rd Status: In Design | Estimated Construction: 11/4/2024 - 10/31/2025 | Categories: Bridges, Streets & Signals | Updated: 02/27/2024 This project is the first of two phases to complete committed improvements to Pryor Road from M-150 Highway to Longview Road. This first phase project will widen Pryor Road as a four lane facility with turn lanes, sidewalk, shared-use path, curb, and street lighting from Hook Road to Longview Road. The project will also include permanent traffic signal installations at the Hook Road and Scherer Road intersections along Pryor Road, with interconnect to the traffic...
Pryor Road (Phase 2) - M150 Hwy to Hook Rd Status: In Design | Estimated Construction: 9/1/2025 - 11/6/2026 | Categories: Bridges, Streets & Signals | Updated: 02/27/2024 This project is the second of two phases to complete committed improvements to Pryor Road from M-150 Highway to Longview Road. This second phase of the project will widen Pryor Road as a four-lane facility with turn lanes, sidewalk, shared-use path, curb, and street lighting from M-150 Highway to Hook Road.
Sidewalk Improvements Status: In Design | Estimated Construction: 10/1/2024 - 5/2/2025 | Categories: Bridges, Streets & Signals | Updated: 02/27/2024 This project is to complete sidewalk gaps throughout the City. The project schedule indicated below may be accelerated should funding be available.
South Prairie Lee Interceptor Sewer Upgrades Status: In Construction | Estimated Construction: 5/6/2024 - 2/14/2025 | Categories: Water Utilities-Sewer | Updated: 02/27/2024 Project Description: Upgrade of specific sections of the South Prairie Lee interceptor sewer in support of development of the land at the top of the drainage basin.
Stormwater - East Fork of Little Blue, Vista Del Verde Status: In Design | Estimated Construction: 8/5/2024 - 5/9/2025 | Categories: Storm Water | Updated: 02/28/2024 The East Fork of the Little Blue River has had several locations within the watershed that structural flooding has occurred. A good knowledge of the watershed will enable an engineer to better understand the best way to control the flooding. Funding for this program is through the 2017 CIP Sales Tax Fund.
Stormwater - SE Todd George Pkwy and SE 3rd St Status: In Design | Estimated Construction: 2/3/2025 - 11/7/2025 | Categories: Storm Water | Updated: 02/28/2024 The East Fork of the Little Blue River has had several locations within the watershed that structural flooding has occurred. A good knowledge of the watershed will enable an engineer to better understand the best way to control the flooding. Funding for this program is through the 2017 CIP Sales Tax Fund.
Stormwater Infrastructure Improvements, 3 Sites, 2017 Sales Tax Status: In Design | Estimated Construction: 11/4/2024 - 7/31/2025 | Categories: Storm Water | Updated: 02/28/2024 This program will upgrade and/or improve the existing City stormwater system to relieve structural flooding for 3 locations within the City. Funding for this program is through the 2017 CIP Sales Tax Fund.
Surface Seal Program Status: Annual Program | Estimated Construction: 7/10/2023 - 11/20/2023 | Categories: Street and Storm Water Programs | Updated: 05/21/2024 Surface Seal Program The summer 2024 surface seal program has been awarded construction anticipated mid-June. Surface Sealing is a surface treatment designed to extend the life of existing pavements by filling surface cracks and voids, sealing weather tight, and adding texture and uniform appearance to the street. Surface Sealing uses a pre-mixed slurry of rock, polymer asphalt binders, cement, and filler materials to seal the entire roadway at a depth of approximately 1/4...
Ward Road & Persels Road Intersection Improvements Status: In Design | Estimated Construction: 3/3/2025 - 10/31/2025 | Categories: Bridges, Streets & Signals | Updated: 02/28/2024 This project is the installation of a permanent traffic signal to replace the temporary span wire traffic signal at the intersection of Ward Road and Persels Road. The project will include relocation of Persels Road, north intersection at Ward Road, to align with Persels Road, south intersection at Ward Road; addressing the operational and safety issues related to the existing offset intersections. The project will also include left-turn lanes along Ward Road at...
Ward Road Improvements - NW O'Brien Road to NW Blue Parkway Status: In Design | Estimated Construction: 11/4/2024 - 8/1/2025 | Categories: Bridges, Streets & Signals | Updated: 02/28/2024 This project will improve Ward Road from NW O’Brien to Blue Parkway. The project includes, but is not limited to, paving, sidewalks, curb and enclosed storm drains, street lighting and other livable street components.