FY24 Water Main Cathodic Protection Status: In Design | Estimated Construction: 7/15/2024 - 2/28/2025 | Categories: Water Utilities-Water | Updated: 02/27/2024 Project Consists of installing cathodic protection in the form of sacrificial anodes on a portion of the water system which is showing signs of corrosion to slow the loss of the wall on the metallic water lines.
Water Main Rehabilitation FY22 Status: In Construction | Estimated Construction: 5/13/2024 - 7/11/2025 | Categories: Water Utilities-Water | Updated: 02/28/2024 Rehabilitation of Water Mains throughout the City that have reached an unacceptable break history.