Surface Seal Program Status: Annual Program | Estimated Construction: 7/10/2023 - 11/20/2023 | Categories: Street and Storm Water Programs | Updated: 04/03/2024 Surface Seal Program The summer 2024 surface seal program has been awarded construction anticipated mid-april to the first pat of May. Surface Sealing is a surface treatment designed to extend the life of existing pavements by filling surface cracks and voids, sealing weather tight, and adding texture and uniform appearance to the street. Surface Sealing uses a pre-mixed slurry of rock, polymer asphalt binders, cement, and filler materials to seal the entire roadway at a depth of...
Ward Road & Persels Road Intersection Improvements Status: In Design | Estimated Construction: 3/3/2025 - 10/31/2025 | Categories: Bridges, Streets & Signals | Updated: 02/28/2024 This project is the installation of a permanent traffic signal to replace the temporary span wire traffic signal at the intersection of Ward Road and Persels Road. The project will include relocation of Persels Road, north intersection at Ward Road, to align with Persels Road, south intersection at Ward Road; addressing the operational and safety issues related to the existing offset intersections. The project will also include left-turn lanes along Ward Road at...
Ward Road Improvements - NW O'Brien Road to NW Blue Parkway Status: In Design | Estimated Construction: 11/4/2024 - 8/1/2025 | Categories: Bridges, Streets & Signals | Updated: 02/28/2024 This project will improve Ward Road from NW O’Brien to Blue Parkway. The project includes, but is not limited to, paving, sidewalks, curb and enclosed storm drains, street lighting and other livable street components.
Water Main Rehabilitation FY22 Status: In Construction | Estimated Construction: 5/13/2024 - 7/11/2025 | Categories: Water Utilities-Water | Updated: 02/28/2024 Rehabilitation of Water Mains throughout the City that have reached an unacceptable break history.