NE Noeleen Lane Stormwater Status: In Design | Estimated Construction: 7/8/2024 - 11/1/2024 | Categories: Storm Water | Updated: 02/28/2024 Projects include adding inlets, stormwater pipe, new curb and gutter, and abandoning water mains due to failed public infrastructure or lack of public infrastructure at the north end of Noeleen Lane.
Olive and Orchard (Local Road reconstruction and Stormwater) Status: In Design | Estimated Construction: 9/2/2024 - 7/1/2025 | Categories: Storm Water | Updated: 02/27/2024 This project will reconstruct Orchard from Olive to Douglas, reconstruct Olive from Orchard to Chipman, and install stormwater infrastructure in the area. Olive and Orchard are mapped as a bike/ped route in the City’s Greenway Master Plan to provide a safe connection to Chipman Road at a signalized intersection. The streets will be rebuilt as improved urban streets with curb, gutter, sidewalks, enclosed stormwater systems, and pavement to accommodate mixed,...
Stormwater - East Fork of Little Blue, Vista Del Verde Status: In Design | Estimated Construction: 8/5/2024 - 5/9/2025 | Categories: Storm Water | Updated: 02/28/2024 The East Fork of the Little Blue River has had several locations within the watershed that structural flooding has occurred. A good knowledge of the watershed will enable an engineer to better understand the best way to control the flooding. Funding for this program is through the 2017 CIP Sales Tax Fund.
Stormwater - SE Todd George Pkwy and SE 3rd St Status: In Design | Estimated Construction: 2/3/2025 - 11/7/2025 | Categories: Storm Water | Updated: 02/28/2024 The East Fork of the Little Blue River has had several locations within the watershed that structural flooding has occurred. A good knowledge of the watershed will enable an engineer to better understand the best way to control the flooding. Funding for this program is through the 2017 CIP Sales Tax Fund.
Stormwater Infrastructure Improvements, 3 Sites, 2017 Sales Tax Status: In Design | Estimated Construction: 11/4/2024 - 7/31/2025 | Categories: Storm Water | Updated: 02/28/2024 This program will upgrade and/or improve the existing City stormwater system to relieve structural flooding for 3 locations within the City. Funding for this program is through the 2017 CIP Sales Tax Fund.