Arnold Hall Stormwater Status: In Construction | Estimated Construction: 7/1/2021 - 5/16/2022 | Categories: Storm Water | Updated: 02/02/2022 Stormwater system improvements for downtown area around Arnold Hall.
FY21 Stormwater Projects Status: In Construction | Estimated Construction: 10/5/2020 - 10/1/2022 | Categories: Storm Water | Updated: 02/02/2022 Projects indentified as part of 2007 bond issue. Projects have been award to 4 engineering firms. Designs expected to take 1 to 2 years based on complexity of projects with construction throughout 2021.
Stormwater - East Fork of Little Blue, Vista Del Verde Status: In Design | Estimated Construction: 3/1/2024 - 11/1/2024 | Categories: Storm Water | Updated: 02/02/2022 The East Fork of the Little Blue River has had several locations within the watershed that structural flooding has occurred. A good knowledge of the watershed will enable an engineer to better understand the best way to control the flooding. Funding for this program is through the 2017 CIP Sales Tax Fund.
Stormwater - SE Todd George Pkwy and SE 3rd St Status: In Design | Estimated Construction: 3/1/2024 - 11/1/2024 | Categories: Storm Water | Updated: 02/02/2022 The East Fork of the Little Blue River has had several locations within the watershed that structural flooding has occurred. A good knowledge of the watershed will enable an engineer to better understand the best way to control the flooding. Funding for this program is through the 2017 CIP Sales Tax Fund.
Stormwater Infrastructure Improvements, 4 Sites, 2017 Sales Tax Status: In Design | Estimated Construction: 7/5/2022 - 12/7/2022 | Categories: Storm Water | Updated: 02/02/2022 This program will upgrade and/or improve the existing City stormwater system to relieve structural flooding for 4 locations within the City. Funding for this program is through the 2017 CIP Sales Tax Fund.