Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 906
  |   Categories: Public Works News

Public Invited to Southeast Douglas Street Improvements Public Meeting

The City of Lee’s Summit is hosting a public meeting to discuss the proposed design and infrastructure improvements to the Southeast Douglas Street corridor from Blue Parkway to Fourth Street from 5-7 p.m. on Thursday, July 10, 2025, in the Strother Conference Room at City Hall, 220 SE Green St., Lee’s Summit, Mo. 64063.

The meeting is an open house-style format and there will be no formal presentation, allowing those interested to come and go as schedules allow. This meeting will be attended by City staff and representatives from the project’s engineering design consultant Wilson & Company. Project exhibits will be available for public inspection at the meeting and online at https://cityofls.net/douglas-project. Comments will also be accepted online from July 10-24, and will be made a part of the public meeting record for the project.

Proposed project improvements include: roadway reconstruction with curb and gutter; share the road bicycle facilities; on street parking (one side); continuous sidewalks along each side of the roadway; continuous street lighting; new enclosed storm drainage system; new waterline infrastructure; and associated utility relocations. This transportation project was approved by voters with the passage of the Aprill 2023 no-tax-increase general obligation bond questions to fund critical improvements to Lee’s Summit’s infrastructure and quality of life. 

For more information, contact the Public Works Department at publicworks@cityofls.net or 816.969.1800.

Print

Latest News

City Crews Preparing for Snow on Mon., Dec. 19

City Crews Preparing for Snow on Mon., Dec. 19

The City's crews are preparing for snow to begin around 6 a.m. on Mon., Dec. 19. Crews are expected to report at 9 p.m. tonight, Sun., Dec. 18, to begin pre-treatment with salt, and treatment will continue throughout the event as needed. Temperatures are expected to be below freezing when the snow starts, and the Monday morning commute may be slick. Residents are encouraged to use caution while driving especially on elevated surfaces such as...
City Crews Preparing for Snow Mon., Nov. 14, and Overnight Into Tues., Nov. 15

City Crews Preparing for Snow Mon., Nov. 14, and Overnight Into Tues., Nov. 15

The City’s crews are preparing equipment and pre-treating hot spot areas such as major intersections and bridges with rock salt today, Mon. Nov. 14, in anticipation of snow later tonight and overnight into Tues., Nov. 15. Crews are currently on standby and will be called in as necessary overnight based on the forecast and conditions. Precipitation is expected to start as light rain changing over to snow. Pavement temperatures will hover around freezing, and...
City Crews Preparing for Winter Weather Season

City Crews Preparing for Winter Weather Season

The City of Lee’s Summit will hold a snow dry run from 7 a.m. to 3:30 p.m. today, Wed., Nov. 9, to allow crews to prepare for the upcoming 2022-2023 winter weather season. City crews will be testing equipment and software, and driving snow routes with plows and salt spreaders installed on trucks. The purpose of the dry run is to ensure all equipment and software is working properly and that drivers are familiar with snow routes, which is critical to the...
Section of SW Murray Road Set to Close Nov. 14

Section of SW Murray Road Set to Close Nov. 14

Section of SW Murray Road Set to Close Nov. 14
A section of SW Murray Road near SW 1st Street is set to close on Monday, Nov. 14, and will remain closed until the evening of Friday, Nov. 18, weather permitting. The road closure is necessary to perform water main replacement work as part of the FY22 Water Main Rehabilitation project. The detour route is SW 3rd Street and Oldham Parkway.  The FY22 Water Main Rehabilitation project helps with continued efforts to maintain and strengthen the water...
Curb Replacement on Section of NW Chipman Road

Curb Replacement on Section of NW Chipman Road

Preparations began this week for curb replacement on a section of NW Chipman Road from U.S. Route 50 to the railroad bridge just east of NW Donovan Road. Curb removal is expected to start on Mon., Nov. 7, with pours and restoration to follow as well as sidewalk ramp replacement in several locations. The work is expected to take approximately three weeks, weather permitting. While there will be lane closures during this work, both eastbound and westbound NW Chipman...
First353739Last