Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 2720
  |   Categories: Public Works News

Section of NW O’Brien Road Set to Close Sept. 26

Section of NW O’Brien Road Set to Close Sept. 26

Update: This section of NW O'Brien Road is now open.

Update: This section of NW O'Brien Road will remain closed until Saturday, Oct. 22, weather permitting.

A section of NW O’Brien Road from NW Village Drive to NW Transition is set to close on Monday, Sept. 26, and will remain closed until Oct. 17, weather permitting. This closure is pending the re-opening of NW Chipman Road under the U.S. Route 50 bridges. The work is necessary to perform water main replacement work as part of the FY22 Water Main Rehabilitation project.

The detour route is NW Ward Road, NW Chipman Road, and NW Murray Road.

The FY22 Water Main Rehabilitation project helps with continued efforts to maintain and strengthen the water distribution system. For more information about the work or the project, contact the City’s Public Works Department at publicworks@cityofls.net or 816-969-1800.

Print

Latest News

City Crews Preparing for Snow This Weekend

City Crews Preparing for Snow This Weekend

The City’s crews are preparing for snow on Sat., Jan. 21, and overnight into Sun., Jan. 22. Crews are scheduled to report at 7 p.m. on Saturday to treat streets as needed and will continue to work overnight into Sunday. Snow accumulations for the Lee’s Summit area may be around one half inch, and the main concerns will be snow overwhelming pavements Saturday night and a re-freeze Sunday morning when temperatures drop below freezing. READ MORE -->

City Crews Preparing for Chance of Snow Thurs., Jan. 19

City Crews Preparing for Chance of Snow Thurs., Jan. 19

The City’s crews are preparing for a chance of snow which is expected to arrive in the early morning hours on Thurs., Jan. 19. A small crew will report at 3 a.m. on Thursday to treat streets with salt as needed. Air and pavement temperatures are expected to bottom out around freezing and slick streets are possible. Drivers should use caution during the Thursday morning commute, especially on elevated surfaces such as bridges and overpasses. The City will...
Section of NE Scruggs Road Set to Close Jan. 17

Section of NE Scruggs Road Set to Close Jan. 17

Update: Due to weather, the section of NE Scruggs from NW Todd George to NE Bristol Drive closed for force main repairs, will remain closed until March 10, weather permitting. A section of NE Scruggs Road from NE Todd George Road to NE Bristol Drive is set to close to through traffic on Tuesday, January 17, and will remain closed for approximately six weeks, weather permitting. The road closure is necessary so a contractor for Lee’s Summit Water...
City Crews Preparing for Chance of Snow Thurs., Jan. 12

City Crews Preparing for Chance of Snow Thurs., Jan. 12

The City’s crews are preparing for a quick moving storm with a chance of snow which is expected to arrive in the early morning hours on Thurs., Jan. 12. A small crew will report at 3 a.m. on Thursday to treat streets with salt as needed. Pavement temperatures are expected to remain at or near freezing which may cause slushy conditions. Drivers should use caution during the Thursday morning commute, especially on elevated surfaces such as bridges and...
City Crews Prepared for Chance of Wintry Mix Sat., Jan. 7

City Crews Prepared for Chance of Wintry Mix Sat., Jan. 7

The City’s crews prepared trucks and equipment due to the chance of a wintry mix of precipitation on Sat., Jan. 7. The current forecast shows air and pavement temperatures should remain above freezing; however, the City will continue to monitor the weather and will call out crews as needed for response.

 

First121416Last