Search Fire Department News

Fire Department News Archive

Fire Department News

  |   Views: 11793

Lee’s Summit Downtown Market Plaza Groundbreaking Ceremony

Lee’s Summit Downtown Market Plaza Groundbreaking Ceremony

The project team led by the City of Lee’s Summit and LANE4 Property Group is pleased to announce a ceremony for the groundbreaking of the Downtown Market Plaza on Tuesday, Oct. 24 at 4:30 pm. The ceremony will mark the commencement of construction for the highly anticipated, mixed-use project located in Downtown Lee’s Summit across from City Hall at Third and Green streets.

The first phase of the project is expected to be complete in spring 2025 and includes a four-season Farmer’s Market and Event Space, a covered Outdoor Performance Area, and a Streetscaped Pavilion. Future phases are planned to include a freestanding restaurant/entertainment building, a boutique hotel, and urban apartments.

The project embodies the growth and revitalization Downtown Lee’s Summit has sustained over the past decades and will bring to life the City’s vision of a community-centric gathering place within that area.

“I am thrilled to be breaking ground on the next evolution of our cherished downtown district,” said Mayor Bill Baird. “Building on what is already a strong asset for our City, we have boldly reimagined a local and regional destination that will increase accessibility to arts and culture, spur economic activity and foster community and well-being. The unique programming planned for this space on the community’s stage will offer inspiring experiences in our downtown core that will provide even more opportunities for Lee’s Summit residents and visitors to gather and connect.”

The Downtown Market Plaza centers around a dynamic structure that will serve as the permanent home for Lee’s Summit’s long-running Farmer’s Market. Retractable garage-style doors opening to the Outdoor Performance Area will accommodate the Farmer’s Market and other events’ use of both indoor and outdoor space. When the Farmer’s Market is not in session, the building will serve the community as a unique event space for a variety of gatherings.

“In an already thriving area, the bar has been set high to deliver a project that enhances the downtown experience. We believe our team has created something that accomplishes this and ensures that downtown will remain vibrant for generations to come,” said Weston Buckley, LANE4 Partner.

Adjacent to the Farmer’s Market and Event Space, an Outdoor Performance Area with synthetic turf, overhead canopy structure and a mobile stage will give Downtown Lee’s Summit the ability to host live entertainment and other large events throughout the year. During the week, the City will utilize this space for more intimate events. Programming for the area is anticipated to include exercise classes, family-friendly entertainment, yard games and art exhibitions.

Serving as the gateway to the project, the Streetscaped Pavilion will transform Green Street into a lively interactive pedestrian walkway. This park-like environment will include an art walk featuring work from local artists, an immersive kids’ playground, and open community gathering areas. Like the Outdoor Performance Area, the Pavilion will be programmed with regular community-centric events.

Initial phases of the construction process will focus on relocation and improvement of public utilities, including water, stormwater, and sanitary sewer. Next, demolition and site grading will prepare the site for future phases of public and private development. Vertical improvements will follow soon after.

More information on the Downtown Market Plaza, including an immersive flythrough video, can be found at cityofls.net/downtown-market-plaza.

In addition to the City of Lee’s Summit, project team members for the Downtown Market Plaza project include:

  • The Downtown Lee’s Summit Community Improvement District
  • Downtown Lee's Summit Main Street, Inc
  • LANE4 Property Group; Master Developer
  • GLMV Architecture; Master Architect
  • McCownGordon; Construction and Pre-Construction Services
  • Biederman Redevelopment Ventures; District Manager
  • Olsson Engineering; Civil Engineering
  • Olsson Studio; Landscape Architect
  • Collins | Webb Architecture; Architectural Consultant
Print

Latest News

Lightning Strike Damages Home

Lightning Strike Damages Home

On Sunday, July 16, 2023, at 11:48 a.m., the Lee's Summit Fire Department responded to a structure fire in the 400 Block of SW Wintergarden Drive. A neighbor reported lightning hitting the house and starting the roof on fire. They also notified the occupant of the house. When the fire department arrived, the fire was visible from the roof of the single-story, single-family residence. The occupant was safe outside. She reported hearing a loud boom and a light...
Discarded Fireworks Debris Starts Garage Fire

Discarded Fireworks Debris Starts Garage Fire

On Monday, July 3, at 10:57 p.m., the Lee's Summit Fire Department responded to a reported structure fire in the 300 Block of NW Thoreau Circle. The call initially came in as an automatic fire alarm, and when dispatch called the house, the occupants said there was a fire in the garage. When crews arrived, there was a fire in the garage of a two-story single-family residence. All of the occupants were outside. The owner had opened the garage to remove the cars...
Fireworks in Lee's Summit

Fireworks in Lee's Summit

Fireworks in Lee's Summit
Fireworks tents are opening in the area, and people are planning Independence Day celebrations. If your plans include fireworks, remember to use them responsibly and follow local regulations and safety guidelines. As drought conditions worsen in Missouri, put fireworks safety first as we prepare for Independence Day celebrations. Sparks from fireworks can easily ignite grass and natural cover fires and pose a risk to structures. We urge everyone to consider local...
Small Chemical Spill Closes Summit Waves

Small Chemical Spill Closes Summit Waves

Small Chemical Spill Closes Summit Waves
On Saturday, June 10, 2023, at 8:57 a.m., Lee's Summit Fire Department responded to Summit Waves, 120 SW Blue Parkway, for a reported chemical spill. Pool staff reported a leak and chemical smell from the wave pool building.  Crews arrived and evacuated the immediate area. Lee's Summit Fire Department, hazardous materials personnel assessed the area and found that approximately ten to fifteen gallons of muriatic acid from the pool's sanitizing...
Engineer Brad Faulkner

Engineer Brad Faulkner

Engineer Brad Faulkner

With great sadness, we announce the passing of Engineer Brad Faulkner. Brad collapsed at his son’s sporting event on Thursday, and efforts to resuscitate him were unsuccessful. Brad was a 19-year veteran assigned to A-Shift at Fire Station No. 3. Our thoughts and prayers go out to Brad’s family, friends, and his fire department family.

First246Last