Search Fire Department News

Fire Department News Archive

Fire Department News

  |   Views: 5397
  |   Categories: Fire Department Press Releases

Groundbreaking Events for Lee’s Summit Fire Stations No. 4 & 5

Groundbreaking Events for Lee’s Summit Fire Stations No. 4 & 5

The City of Lee’s Summit and the Lee’s Summit Fire Department will host groundbreaking ceremonies on Oct. 27 at 2 p.m. for the new Fire Station No. 4, and Nov. 3 at 2 p.m. for the new Fire Station No. 5. The ceremonies are open to the public and will be held at the new Fire Station No. 4 location, 5031 NE Lakewood Way, and the new Fire Station No. 5 located at 801 SW Lemans Lane.

Site work will begin in the next few weeks and construction of the 12,100-square-foot identical stations will start once site work is substantially complete. The new fire stations will have three apparatus bays, a decontamination area and separate sleeping quarters.

“We are grateful for the investment our City and residents have made in its fire and emergency services,” Fire Chief Mike Snider said. “Firefighters face unique risks in their jobs that can have a significant impact on their health and wellness. With these new fire stations, we are able to address occupational stress and incorporate health measures such as decontamination areas. The stations’ design is focused on emotional well-being with abundant natural lighting and separate spaces for casual gatherings and personal time. Recognizing that sleep quality directly affects firefighter health, sleeping quarters have been designed to promote sleep and reduce environmental disturbances. All of these measures will not only improve the health and safety of our firefighters but have a positive effect on the delivery of services.”

The replacement of Stations No. 4 and 5 were approved by voters as part of the August 2019 no tax increase bond initiative providing $10.5 million for land acquisitions, architect and contractor fees, and construction. When completed in late 2023, the fire stations will provide modern facilities to support firefighters and meet the future needs of the citizens of Lee’s Summit.

Print

Latest News

Lightning Strike Probable Cause of Structure Fire

Lightning Strike Probable Cause of Structure Fire

Lightning Strike Probable Cause of Structure Fire
On Sunday, July 30, 2023, at 10:00 p.m., the Lee's Summit Fire Department responded to a structure fire in the 2500 Block of NW Clifford Road. The caller reported a fire from the roof of a detached shop. When crews arrived, the roof of the one-and-a-half-story detached shop with an upstairs apartment was engulfed in flames and was beginning to collapse. The owner confirmed that the shop was unoccupied, and no one lived in the apartment. Crews extinguished the...
Lightning Strike Damages Home

Lightning Strike Damages Home

On Sunday, July 16, 2023, at 11:48 a.m., the Lee's Summit Fire Department responded to a structure fire in the 400 Block of SW Wintergarden Drive. A neighbor reported lightning hitting the house and starting the roof on fire. They also notified the occupant of the house. When the fire department arrived, the fire was visible from the roof of the single-story, single-family residence. The occupant was safe outside. She reported hearing a loud boom and a light...
Discarded Fireworks Debris Starts Garage Fire

Discarded Fireworks Debris Starts Garage Fire

On Monday, July 3, at 10:57 p.m., the Lee's Summit Fire Department responded to a reported structure fire in the 300 Block of NW Thoreau Circle. The call initially came in as an automatic fire alarm, and when dispatch called the house, the occupants said there was a fire in the garage. When crews arrived, there was a fire in the garage of a two-story single-family residence. All of the occupants were outside. The owner had opened the garage to remove the cars...
Fireworks in Lee's Summit

Fireworks in Lee's Summit

Fireworks in Lee's Summit
Fireworks tents are opening in the area, and people are planning Independence Day celebrations. If your plans include fireworks, remember to use them responsibly and follow local regulations and safety guidelines. As drought conditions worsen in Missouri, put fireworks safety first as we prepare for Independence Day celebrations. Sparks from fireworks can easily ignite grass and natural cover fires and pose a risk to structures. We urge everyone to consider local...
Small Chemical Spill Closes Summit Waves

Small Chemical Spill Closes Summit Waves

Small Chemical Spill Closes Summit Waves
On Saturday, June 10, 2023, at 8:57 a.m., Lee's Summit Fire Department responded to Summit Waves, 120 SW Blue Parkway, for a reported chemical spill. Pool staff reported a leak and chemical smell from the wave pool building.  Crews arrived and evacuated the immediate area. Lee's Summit Fire Department, hazardous materials personnel assessed the area and found that approximately ten to fifteen gallons of muriatic acid from the pool's sanitizing...
First357Last