Public Works Fees

Temporary Traffic Control Permit No charge. Permit is required for temporary traffic control.
Blasting Permit $150.00 per blasting application
Decorative Sign Post Where an existing pole is being replaced that meets the current standards, the fee is 100% total material and labor cost (est. $130.00)  Where an existing pole is being replaced that does not meet current standards, the fee is the cost difference between the standard   pole and decorative pole (est. $35.00)
Design and Construction Manual $50.00 per hard copy
  $5.00 per CD
Right-of-Way Permit $80 per unit