|
Effective July 1, 2022 |
Effective July 1, 2023 |
Temporary Traffic Control Permit |
$60 - sidewalk, parking, or lane closure(s); or $100 land/road closure(s) with detour and/or special terms/conditions
|
$60 - sidewalk, parking, or lane closure(s); or $100 land/road closure(s) with detour and/or special terms/conditions |
Decorative Sign Post |
Where an existing pole is being replaced that meets the current standards, the fee is 100% total material and labor cost (est. $130.00) Where an existing pole is being replaced that does not meet current standards, the fee is the cost difference between the standard pole and decorative pole (est. $35.00) |
Where an existing pole is being replaced that meets the current standards, the fee is 100% total material and labor cost (est. $130.00) Where an existing pole is being replaced that does not meet current standards, the fee is the cost difference between the standard pole and decorative pole (est. $35.00) |
Design and Construction Manual |
$50.00 per hard copy |
N/A - available online to the Public |
|
$5.00 per CD |
N/A - available online to the Public |
Right-of-Way Permit |
$85.00 per unit* |
$85.00 per unit* |
|
*A unit is defined as one block or 660 feet of continuous linear boring/ excavation; or, a temporary obstruction |
*A unit is defined as one block or 660 feet of continuous linear boring/ excavation; or, a temporary obstruction |
Additional Right-of-Way Fees |
$80.00 per street cut; $80.00 per street crossing |
$80.00 per street cut; $80.00 per street crossing |