Home button
Site map button
Assessibility logo
Email button
FAQ button
Font Size
Small font
Medium font
Large font
816 969-1900
HighlightsContact UsConnect With Us...


Lee's Summit Water Utilities is dedicated to providing reliable water and sanitary sewer services responsibly and efficiently for the health and safety of our community with exceptional customer service, integrity and pride. 


Community Sewer Rehabilitation

Did you know there are nearly 500 miles of public sewer mains underneath the City of Lee’s Summit? In addition to inspecting and cleaning these lines every day, Lee’s Summit Water Utilities is currently rehabilitating several miles of sewer lines in most need of repair through a process which essentially installs a pipe within a pipe and is specifically designed for minimal impact and disruption to neighborhoods and customers.

The sewer rehabilitation project reduces blockages caused by roots and debris and the infiltration of groundwater in the public main, which reduces surcharges, overflows and backups. 

For more information about this process, call 816-969-1900



Pay your bill online with Utility Link 

The new secure bill payment system is now available. To register with Utility Link, you will need to have your account number and customer number which can be found on your new bill. Once registered, you will  no longer need your account and customer number to access your account as you can log in with your new username and password. Sign up now.


Lee’s Summit Water Utilities invests in City’s unseen, but vital infrastructure

Lee’s Summit is home to more than 600 miles of water mains and 480 miles of sanitary sewer infrastructure – all largely unseen, but vital to the health and safety of our community. There are several projects underway to improve the effectiveness and life-cycle of this infrastructure.

Having trouble accessing Utility Link or registering for Parks activities?

The City recently made changes to the security settings on secured City websites including Utility Link, the online water bill payment system, and the Parks and Recreation web registration system. These changes were required by the Payment Card Industry (PCI) standards, and are vital to protecting the security of customer credit card information.

Temporary Road Closure for Cedar Creek Interceptor Project Construction

SW Forestpark Boulevard between SW Third Street and SW Waterfall Drive in Lee’s Summit, Mo., is temporarily closed beginning Tuesday, July 21, and is anticipated to remain closed until late September 2015, weather depending. Alternate access is available via SW Longview Road. The temporary closure is necessary for sewer line construction as part of the improvements to the Cedar Creek sanitary sewer interceptor

The 2015 Lee’s Summit Water Quality Report now available online

Monitoring results for the previous year as well as important information and tips about your water services are now available in the 2015 Lee’s Summit Water Quality Report.





Page 1 of 7First   Previous   [1]  2  3  4  5  6  7  Next   Last