Capital Project Status

Search Projects

Status: In Construction   |   Estimated Construction: 2/1/2021 - 12/1/2021   |  
Categories: Water Utilities-Sewer   |  

Small Sewer Main Replacement Program

Project Description:
Twenty sewer segments are located as follows: Line 47024 is approximately 288 feet long located east of NW Ward Road and north of NW Maple Street. Line 75392 is approximately 658 feet long located between NW 1st and SW 2nd Street and between SW Monroe Street and SW Madison Street. Line 47018 is approximately 90 feet long located between NW Lakeview Boulevard and NW 1st Street. Line 46859 is approximately 290 feet long located north of NE Maggie Street and west of NE Meadow Lane. Line 50952 is approximately 300 feet long located north of NE Maggie Street and east of NE Meadow Lane. Line 53537 is at least 300 feet long located east of NE Beacon Avenue between NE Orchard Street and NE Forest Avenue. Line 53525 is approximately 320 feet long located northeast of where NE Beacon Avenue and NE Johnson Street connect. Line 47202 is approximately 188 feet long located along the west side of NE Eastridge Street and south of NE Short Street. Line 44054 is approximately 300 feet long located between SE 3rd Terrace and SE Morningside Drive and east of Independence Avenue. Line 53529 is approximately 300 feet long located between SE Morningside Drive and SE 4th Street and east of Independence Avenue. Line 75534 is approximately 157 feet long located under NE Langsford Road at the intersection of SE Ridgeview Drive. Line 48894 is approximately 750 feet long located north of SW Lea Drive and between SW Ward Road and SW William Street. Line 48999 is approximately 250 feet long located south of SW Oldham Road and west of SW Lea Drive. Line 53443 is approximately 140 feet long located under SW 4th Terrace and west of SW Walnut Street running northeast between the yards of 600 and 604 SW 4th Terrace. Line 49106 is approximately 72 feet long located under SW 4th Terrace and west of SW Walnut Street. Line 49100 is approximately 189 feet long located north of SW Blue Parkway and west of SW Walnut Street. Line 75585 is approximately 100 feet long located that crosses SE 9th Street west of SE Miller Street. Line 53155 is approximately 153 feet long located along the west side of SE Miller Street and north of SE 9th Street. Line 47576 is approximately 220 feet long and crosses SE Miller Street north of SE 9th Street and continues east into the backyards of properties on Miller Street. Line 47577 is approximately 310 feet located along the south side of SE 9th Street beginning near SE Miller Street and ending between SE Miller Street and SE Douglas Street.

Project Rationale:
Sewer segments have been identified that are under the current standard for minimum size and in poor condition. These lines well be replaced to bring them up to standard and reduce inflow and infiltration and potential for blockage.

Current Project Status:
Weidenmann is the contractor.  Work is progressing and about 75% of the sites are complete.

Project Contact:
Steve Proudfit 816-969-1800

Projected Funding: $2,000,000