Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 1449
  |   Categories: Public Works News

City’s Crews Completed Plowing & Treating Streets on Mon., March 4

City crews completed plowing and treating streets at 9:05 a.m. on Mon., March 4. Residents can call 969-1870 until 5 p.m. on Mon., March 4, if they believe their street was missed or if they need to report damage such as a plowed yard or downed mailbox.

Although cold temperatures continue to limit the effectiveness of salt, abundant sunshine today is helping to melt snow pack from streets. Crews plan to continue to spot-check streets and clean-up areas where melting of snow pack is occurring. After the sun goes down, melted snow will re-freeze and residents should continue to use caution while traveling.

Print

Latest News

Scherer Road Closed Between Pryor and Ward Roads

Scherer Road Closed Between Pryor and Ward Roads

Scherer Road Closed Between Pryor and Ward Roads

Scherer Road between Pryor and Ward Roads is closed until further notice due to a roadway collapse. Crews are on site to evaluate and initiate repairs. It is unknown at this time when the roadway will reopen.

 

Temporary Closure of Northbound SW Ward Road between SW Scherer Road and SW Winthrop Drive Due to Signal Damage

Temporary Closure of Northbound SW Ward Road between SW Scherer Road and SW Winthrop Drive Due to Signal Damage

On Friday, Aug. 18, the traffic signal at SW Ward Road and SW Scherer Road was severely damaged. Northbound SW Ward Road has been temporarily closed between SW Scherer Road and SW Winthrop Drive. The northbound closure will remain in place until the site is safely secured and either temporary restoration of the traffic signal or temporary two-way stop control can be established. 

Jefferson Street Open to Two-Way Traffic

Jefferson Street Open to Two-Way Traffic

Jefferson Street from Stuart Road to Persels Road is now open to two-way traffic. Final work such as sidewalk, ADA ramps, restoration and punch list items will continue. Although open, this section of roadway will remain a work zone and motorists and pedestrians are encouraged to continue to use caution. All work on the project is expected to be complete by Sept. 3, 2017, weather permitting.

Todd George Parkway Lane Closure Switch Set for Thursday, July 20

Todd George Parkway Lane Closure Switch Set for Thursday, July 20

Todd George Parkway Lane Closure Switch Set for Thursday, July 20

Northbound Lane to Re-Open; Southbound Lane to Close

A lane closure switch for Todd George Parkway from Colbern Road to Woods Chapel Road is set to begin Thursday, July 20. The northbound lane of Todd George Parkway will re-open, while the southbound lane will temporarily close for approximately six weeks, weather permitting. The detour route is Woods Chapel Road to I-470 south to Colbern Road. The section of Strother Road from the I-470 exit ramp east to Todd George Parkway will also temporarily close for...
First111214