Search Public Works News

Public Works News Archive

Tags

Public Works News

  |   Views: 6352
  |   Categories: Public Works News

***UPDATE As of 1/31/20, NW Pryor Road is Expected to Open Sometime the Week of Feb. 3***Section of NW Pryor Road to Remain Closed Until Late Jan. 2020

***UPDATE As of 1/31/20, NW Pryor Road is Expected to Open Sometime the Week of Feb. 3***Section of NW Pryor Road to Remain Closed Until Late Jan. 2020

***UPDATE As of 1/31/20, NW Pryor Road is expected to open sometime the week of Feb. 3. The opening has been delayed due to weather.***
The section of NW Pryor Road from NW Quarry Park Road to Bannister Road is now anticipated to remain closed until late January 2020. The work has taken longer than expected due to the amount of rock found during excavation for the water line installation. The posted detour remains the same.

For more information, contact the City's Public Works Department at 969-1800.

Print

Latest News

Public Hearing for Pryor Road Improvements Set for July 20

Public Hearing for Pryor Road Improvements Set for July 20

Public Hearing for Pryor Road Improvements Set for July 20

The City of Lee’s Summit will host a public hearing to discuss the right-of-way stage design for Pryor Road from Longview Road to Hook Road on July 20 from 4:30 to 6:30 p.m. at Fire Station No. 7, 2150 SW Scherer Rd.

Closures for Sections of SW 2nd Street from SW Lakeview Boulevard to SW Blue Parkway

Closures for Sections of SW 2nd Street from SW Lakeview Boulevard to SW Blue Parkway

Closures are expected daily for sections of SW 2nd Street from SW Lakeview Boulevard to SW Blue Parkway until approximately July 1, weather permitting. The first closure began May 23, for the section of SW 2nd Street from SW Lakeview Boulevard to SW Noel Street. This closure is scheduled daily from 9 a.m. – 4 p.m.  Following completion of the work in that location, and tentatively set to begin June 23, a closure is expected for the section of SW 2nd...
Northbound Traffic Only on NW Main Street from NW Chipman Road to NW Commerce Drive Beginning March 28

Northbound Traffic Only on NW Main Street from NW Chipman Road to NW Commerce Drive Beginning March 28

Northbound Traffic Only on NW Main Street from NW Chipman Road to NW Commerce Drive Beginning March 28
A section of NW Main Street from NW Chipman Road to NW Commerce Drive is set to close to southbound traffic beginning Monday, March 28, weather permitting, and will be open for northbound traffic only until August 2022. This change in traffic is to facilitate the reconstruction of NW Main Street with a new concrete curb and gutter road and sidewalks. Access to the businesses along NW Main Street will be maintained at all times. The contractor...
Parking Lot Closure for Arnold Hall Stormwater Project Set for Monday, March 21

Parking Lot Closure for Arnold Hall Stormwater Project Set for Monday, March 21

Parking Lot Closure for Arnold Hall Stormwater Project Set for Monday, March 21
The public parking lot at 121 SE 3rd St. in downtown Lee’s Summit, commonly referred to as the Arnold Hall parking lot, is set to close on Monday, March 21, weather permitting, and is expected to remain closed until June. The closure is necessary for the second phase of stormwater work at the site which includes the excavation and installation of stormwater tanks. The alley off of SE Green Street will be used during construction and will be closed most of...
MoDOT US 50 Bridges over Chipman Road Project

MoDOT US 50 Bridges over Chipman Road Project

The Missouri Department of Transportation (MoDOT) plans to replace the U.S. 50 bridges over Chipman Road in Lee's Summit beginning March 21. These bridges have reached the end of their service life and must be replaced. In addition to the new bridges, sidewalks will be provided on both sides of Chipman Road through the interchange providing new critical connections for pedestrians. All work is weather permitting. 

1345Last