Search Press Releases

Press Release Archive

Press Releases

  |   Views: 1884

August No-Tax-Increase Bond Issue to Fund Public Safety Improvements

On Aug. 6, 2019, Lee’s Summit voters will be asked to consider a $19,475,000 no-tax-increase bond question to fund various public safety initiatives. The general obligation bonds would fund the construction of two new fire stations and purchase of fire apparatus; police body-worn cameras and in-car audio and video recording systems; Police/Court facility renovations; and network infrastructure.

This ballot question would not raise taxes, but authorizes the City to reissue debt at the current debt levy to address capital needs. The current property tax levy is $1.51540 per $100 of assessed value. Of that, the debt service is $0.4697 per $100 of assessed value, which the City has maintained since 2007.

Approval of the ballot question would provide funding to purchase an additional fire apparatus, build a new Fire Station No. 4 and a new Fire Station No. 5. Fire Station No. 4, located at 404 NE Woods Chapel Rd., was built in 1976. Fire Station No. 5, located at 3650 SW Windemere Dr., was built in 1980. Both stations have reached capacity and are unable to expand at their current locations. The stations lack separate sleeping quarters, bathroom facilities and locker rooms for men and women; a decontamination area, which minimizes exposure hazards; and space for proper training.

The bond issue would also fund security and operational improvements at the Police/Court facility as well as body-worn cameras and a new in-car video system. The Police Department currently has four body-worn cameras in use and its in-car video system is outdated. Approval of the ballot question would fund 140 body-worn cameras for all patrol officers and 42 in-car audio and video systems, increasing transparency and meeting new technological needs. Today, courts and prosecutors rely on video and audio technology to improve evidentiary outcomes. The building renovations would enhance security and public access, improve operational efficiency and provide separate lockers and restrooms for men and women.

The City currently uses aerial fiber to connect several facilities, including Police Headquarters, City Hall, Animal Control and Public Works Operations. These network infrastructure improvements would bury existing fiber optic cable, lowering the risk of downed limbs severing network connections, and improve communication with the new fire stations and Police Headquarters. New buried fiber optic cable would be provided to other public safety related facilities, including Fire Station No. 2, and Harris Park Community Center and Longview Community Center, which serve as shelters during times of emergency need.

Print

Theme picker

Latest Press Releases

Lee’s Summit Fire Department to Hold Recruitment Open House
Lee’s Summit Fire Department to Hold Recruitment Open House

Lee’s Summit Fire Department to Hold Recruitment Open House

The Lee’s Summit Fire Department is holding a Recruitment Open House for qualified candidates interested in a career as a firefighter/paramedic. The open house is scheduled for Feb. 15, from 10 a.m. to 3 p.m. at Fire Headquarters, 207 SE Douglas St. During the event, personnel will be on hand to provide insight into the position, culture and benefits. Attendees will have an opportunity to tour the fire station and fill out applications on site.   Among...
Business Destroyed by Fire
Business Destroyed by Fire

Business Destroyed by Fire

LEE’S SUMMIT, MO— On Sunday, February 09, 2020 at 2:25 a.m. the Lee’s Summit Fire Department responded to a reported structure fire at 611 SW 3rd Street. A police officer in the area discovered the fire in the building occupied by Shining Light Music. When the fire department arrived, the two-story building was well involved in fire. Due to the amount of involvement and partial collapse of the structure, crews attacked the fire from a defensive...
Lee’s Summit Encourages the Community to Spread Kindness
Lee’s Summit Encourages the Community to Spread Kindness

Lee’s Summit Encourages the Community to Spread Kindness

The City of Lee’s Summit’s Human Relations Commission is encouraging community members to perform random and purposeful acts of kindness during a weeklong campaign known as “Take Time to Be Kind.” The campaign runs Feb. 10 through Feb. 16. These small gestures – such as telling someone how much they mean to you or performing chores around the house – are easy ways to spread kindness and make a positive change in the community....
Electrical Failure Sparks Crawl Space Fire

Electrical Failure Sparks Crawl Space Fire

  LEE’S SUMMIT, MO— On Friday, January 17, 2020, at 4:09 a.m. , the Lee’s Summit Fire Department responded to a reported structure fire in the 400 Block of SW Mission Road. The caller reported the house was filling with smoke and the smoke alarms were sounding. The source of the smoke was unknown. When the fire department arrived, nothing was visible from the one-story, single family residence. Firefighters entered the smoke filled house...
Lee's Summit Fire Department Pumper Rolls Onto Its Side On Icy Street
Lee's Summit Fire Department Pumper Rolls Onto Its Side On Icy Street

Lee's Summit Fire Department Pumper Rolls Onto Its Side On Icy Street

On Friday, January 17 at approximately 5:10 a.m., Pumper 5 was traveling southbound on SW Ward Road near SW Stuart Road, when it encountered icy road conditions and rolled onto its side. There were no injuries to the crew and no other vehicles involved. There is significant damage to the vehicle. Pumper 5 was returning to Station 5 on M-150 Highway after providing coverage at another station that was out fighting a structure fire. The Lee’s Summit...
1345Last