Wastewater Master Plan
November 2006 (Current Version)
The Wastewater Master Plan provides the City of Lee’s Summit a comprehensive plan for the development of its wastewater infrastructure to meet both the short-term and long-term growth of the City.
View or download the full version of the Wastewater Master Plan here:
Wastewater Master Plan (.pdf 90.9MB)
To view or download a particular section, click on the headings below.
COVER PAGE
TABLE OF CONTENTS
EXECUTIVE SUMMARY
1.1 MASTER PLAN PURPOSE AND FINDINGS
1.2 RECOMMENDATIONS
INTRODUCTION
2.1 PURPOSE
2.2 PLANNING PROCESS
2.3 MASTER PLANNING CONSULTANT
2.4 PREVIOUS REPORTS
2.5 ABBREVIATIONS AND ACRONYMS
EXISTING CONDITIONS AND PROJECTIONS
3.1 LAND PLANNING
3.2 LAND USE
3.2.1 EXISTING LAND USE
3.2.2 YEAR 2015 LAND USE
3.2.3 ULTIMATE LAND USE
3.3 DEMOGRAPHIC AND ECONOMIC DATA
3.3.1 POPULATION AND COMMERCIAL USES
3.3.2 ECONOMIC DATA
3.3.3 FORECASTS OF FLOW
EXISTING FACILITIES EVALUATION
4.1 EXISTING COLLECTION AND CONVEYANCE SYSTEM
4.1.1 CITY OWNED
4.1.2 LITTLE BLUE VALLEY SEWER DISTRICT OWNED
4.1.3 MIDDLE BIG CREEK SUB-DISTRICT OWNED
4.2 EXISTING WASTEWATER TREATMENT FACILITIES
4.2.1 LITTLE BLUE VALLEY SEWER DISTRICT
4.3 EVALUATION OF UNSEWERED AREAS
FUTURE FACILITY IMPROVEMENTS
5.1 COLLECTION AND CONVEYANCE SYSTEM
5.1.1 CITY OWNED
5.1.2 LITTLE BLUE VALLEY SEWER DISTRICT OWNED
5.1.3 MIDDLE BIG CREEK-OWNED
5.2 WASTEWATER TREATMENT FACILITIES
5.2.1 CITY-OWNED
5.2.2 LITTLE BLUE VALLEY SEWER DISTRICT-OWNED
5.2.3 MIDDLE BIG CREEK-OWNED
ALTERNATIVE EVALUATIONS
6.1 EVALUATION OF IMPROVEMENTS WITHOUT PRI DEVELOPMENT
6.2 EVALUATION OF CONVEYANCE ALTERNATIVE FOR MAYBROOK, SOUTH AND WEST
PRAIRIE LEE, AND LITTLE CEDAR CREEK WATERSHEDS
COLLECTION SYSTEM SUSTAINABILITY
7.1 COLLECTION SYSTEM IMPROVEMENTS
7.1.1 ESTIMATED REINVESTMENT FOR REPLACEMENT OF AGING SEWERS
7.1.2 I/I REMOVAL
7.1.3 SYSTEM REHABILITATION
7.1.4 RECOMMENDATIONS
7.2 CMOM - CAPACITY, MANAGEMENT, OPERATION AND MAINTENANCE
7.2.1 CAPACITY ASSURANCE
7.2.2 MANAGEMENT
7.2.3 OPERATION AND MAINTENANCE
7.2.4 CMOM AUDIT
7.2.5 RECOMMENDATIONS
7.3 PRIVATE SEWER POLICIES
7.3.1 PRIVATE SECTOR I/I MAGNITUDE
7.3.2 PRIVATE PROPERTY ISSUES
7.3.3 JOHNSON COUNTY, KANSAS, WASTEWATER EXPERIENCE
7.3.4 RECOMMENDATIONS
RECOMMENDED CAPITAL IMPROVEMENTS PLAN
8.1 2015 CAPITAL IMPROVEMENTS
8.2 ULTIMATE CAPITAL IMPROVEMENTS
8.3 ULTIMATE WITHOUT PRI
APPENDIX
9.1 CITY OF LEE'S SUMMIT POPULATION PROJECTION
9.2 CITY OF LEE’S SUMMIT DESIGN CRITERIA; SECTION 6500 – SANITARY SEWER
9.3 EXCESS FLOW HOLD BASIN SIZING METHODOLOGY
9.4 UNSEWERED AREAS – INTERCEPTOR SIZING
9.5 PROPOSED EXCESS FLOW HOLDING BASINS
9.6 DETAILED COST ESTIMATE – 2015 RECOMMENDED CAPITAL IMPROVEMENTS
9.7 DETAILED COST ESTIMATE – ULTIMATE RECOMMENDED CAPITAL IMPROVEMENTS
9.8 DETAILED COST ESTIMATE – ULTIMATE (WITHOUT PRI) RECOMMENDED CAPITAL
IMPROVEMENTS
9.9 CMOM AUDIT
9.10 COMPUTER MODEL SUMMARY
LIST OF FIGURES
FIGURE 1-1 LBVSD PRIORITIZED CAPITAL IMPROVEMENTS
FIGURE 1-2 CITY OF LEE’S SUMMIT PRIORITIZED CAPITAL IMPROVEMENTS
FIGURE 3-1 EXISTING LAND USE
FIGURE 3-2 2015 LAND USE
FIGURE 3-3 ULTIMATE LAND USE
FIGURE 3-4 ULTIMATE LAND USE WITHOUT PRI
FIGURE 3-5 ULTIMATE LAND USE UNITY VILLAGE
FIGURE 4-1 LEE’S SUMMIT WASTEWATER MASTER PLAN - EXISTING COLLECTION AND
CONVEYANCE SYSTEM
FIGURE 4-2 LBVSD WASTEWATER CONVEYANCE SYSTEM
FIGURE 4-3 MIDDLE BIG CREEK SUB-DISTRICT EXISTING FACILITIES
FIGURE 5-1 PEAK WASTEWATER FLOW (50-YEAR) COMPARISON
FIGURE 5-2 ULTIMATE CONDITION WASTEWATER CONVEYANCE PLAN
FIGURE 5-3 WEST AND SOUTH PRAIRIE LEE WATERSHED PUMPING/STORAGE SCHEMATIC
FIGURE 6-1 ULTIMATE CONDITION WITHOUT PRI
FIGURE 7-1 SURVIVAL FUNCTION OF PIPES
FIGURE 7-2 INFLOW DISTRIBUTION IN MONITORED BASINS
FIGURE 7-3 HIGH INFLOW AREAS IN EXISTING SYSTEM PLAN
FIGURE 8-1 2015 CONDITION OF CONVEYANCE/COLLECTION SYSTEM BOTTLENECKS
FIGURE 8-2 2015 CONDITION RECOMMENDED IMPROVEMENTS
FIGURE 8-3 ULTIMATE CONDITION OF CONVEYANCE/COLLECTION SYSTEM BOTTLENECKS
FIGURE 8-4 ULTIMATE CONDITION RECOMMENDED IMPROVEMENTS
FIGURE 8-5 ULTIMATE CONVEYANCE/COLLECTION SYSTEM
FIGURE 8-6 ULTIMATE CONDITION RECOMMENDED IMPROVEMENTS WITHOUT PRI
LIST OF TABLES
TABLE 1-1 PRIORITIZED CAPITAL IMPROVEMENTS
TABLE 1-2 PROJECT DESCRIPTION
TABLE 3-1 POPULATION AND HOUSING FORECASTS
TABLE 4-1 GRAVITY SEWER LENGTH BY WATERSHED
TABLE 4-2 ACTIVE PUMP STATIONS SUMMARY
TABLE 4-3 EXCESS FLOW HOLDING BASINS
TABLE 7-1 PIPE LENGTH BY GROUP
TABLE 7-2 ESTIMATED ANNUAL REINVESTMENT NEED
TABLE 7-3 SEWER SYSTEM EVALUATION SURVEY – PROJECTED COSTS
TABLE 7-4 REHABILITATION PLAN – PROJECTED COSTS
TABLE 7-5 SSES AND REHABILITATION – ESTIMATED COSTS
TABLE 7-6 CMOM SELF AUDIT EVALUATION
TABLE 8-1 CAPITAL IMPROVEMENT PROJECTS FOR YEARS 2006 TO 2015
TABLE 8-2 CAPITAL IMPROVEMENT PROJECTS FOR YEARS 2016 TO ULTIMATE
TABLE 8-3 CAPITAL IMPROVEMENT PROJECTS FOR YEARS 2016 TO ULTIMATE WITHOUT PRI |